CLIP ANGLES ALUMINIO
CLIP ANGLES ALUMINIO
B. TESTS
1. Test reports on: 1) Air Infiltration Test, per FBC, TAS 202-94
2) Uniform Static Air Pressure Test, Loading per FBC TAS 202-94
3) Water Resistance Test, per FBC, TAS 202-94
4) Large Missile Impact Test per FBC, TAS 201-94
5) Cyclic Wind Pressure Loading per FBC, TAS 203-94
6) Forced Entry Test, Type “D-A” fixed window, Grade 10, Level LV
1 per ASTM F 588-04, Side-Hinged Door Systems per AAMA 1304-
02 and per FBC 2411.3.2.1, TAS 202-94
along with marked-up drawings and installation diagram of windows mulled together,
prepared by Fenestration Testing Laboratory, Inc., Test Reports No. FTL-3810, dated
05/16/03; FTL-3819, dated 06/09/03 and FTL-3820, dated 06/09/03, all signed and
sealed by Joseph Chan, P.E.
(Submitted under NOA No. 04-0712.01)
C. CALCULATIONS
1. Anchor verification calculations and structural analysis, complying with FBC 6th
Edition (2017), dated 01/12/18, prepared by Al-Farooq Corporation, signed and sealed
by Javad Ahmad, P.E.
(Submitted under NOA No. 18-0205.05)
2. Glazing complies with ASTM E1300-09
D. QUALITY ASSURANCE
1. Miami-Dade Department of Regulatory and Economic Resources (RER).
E. MATERIAL CERTIFICATIONS
1. None.
G. OTHERS
1. Notice of Acceptance No. 18-0205.05, issued to ES Windows, LLC for their Clipped,
Extruded Aluminum Tube Mullion – L.M.I., approved on 03/08/18 and expiring on
09/16/19.
B. TESTS
1. None.
C. CALCULATIONS
1. Anchor verification calculations and structural analysis, complying with FBC 6th
Edition (2017), dated 01/12/18, and updated on 11/04/20 to comply with FBC 7th
Edition (2020), prepared by Al-Farooq Corporation, signed and sealed by Jalal
Farooq, P.E.
2. Glazing complies with ASTM E1300-09
D. QUALITY ASSURANCE
1. Miami-Dade Department of Regulatory and Economic Resources (RER)
E. MATERIAL CERTIFICATIONS
1. None.
F. STATEMENTS
1. Statement letter of conformance, complying with FBC 6th Edition (2017), with FBC
7th Edition (2020), and of no financial interest, dated November 4, 2020, issued by
Al-Farooq Corporation, signed and sealed by Jalal Farooq, P.E.
G. OTHERS
1. Notice of Acceptance No. 19-0405.10, issued to E.S. Windows, LLC for their Clipped,
Extruded Aluminum Tube Mullion – L.M.I., approved on 05/30/19 and expiring on
09/16/24.
By:________________________
Miami–Dade Product Control
PRODUCT REVISED
as complying with the Florida
Building Code
NOA–No. 20-1118.13
Expiration Date: 09/16/2024
By:________________________
Miami–Dade Product Control
PRODUCT REVISED
as complying with the Florida
Building Code
NOA–No. 20-1118.13
Expiration Date: 09/16/2024
By:________________________
Miami–Dade Product Control
PRODUCT REVISED
as complying with the Florida
Building Code
NOA–No. 20-1118.13
Expiration Date: 09/16/2024
By:________________________
Miami–Dade Product Control
PRODUCT REVISED
as complying with the Florida
Building Code
NOA–No. 20-1118.13
Expiration Date: 09/16/2024
By:________________________
Miami–Dade Product Control
PRODUCT REVISED
as complying with the Florida
Building Code
NOA–No. 20-1118.13
Expiration Date: 09/16/2024
By:________________________
Miami–Dade Product Control
PRODUCT REVISED
as complying with the Florida
Building Code
NOA–No. 20-1118.13
Expiration Date: 09/16/2024
By:________________________
Miami–Dade Product Control
PRODUCT REVISED
as complying with the Florida
Building Code
NOA–No. 20-1118.13
Expiration Date: 09/16/2024
By:________________________
Miami–Dade Product Control
PRODUCT REVISED
as complying with the Florida
Building Code
NOA–No. 20-1118.13
Expiration Date: 09/16/2024
By:________________________
Miami–Dade Product Control