0% found this document useful (0 votes)
23 views1 page

Roof Stregthening Details 1

This document outlines technical specifications for concrete covers, formwork removal times, and structural grades for a proposed residential building project. It specifies cover thicknesses for various structural elements and the required removal times for formwork based on concrete grades. The document also includes details about the design and approval by structural engineers and consultants.

Uploaded by

nagapriya
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
23 views1 page

Roof Stregthening Details 1

This document outlines technical specifications for concrete covers, formwork removal times, and structural grades for a proposed residential building project. It specifies cover thicknesses for various structural elements and the required removal times for formwork based on concrete grades. The document also includes details about the design and approval by structural engineers and consultants.

Uploaded by

nagapriya
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

TECHNICAL NOTES:

A
1.COVERS
1.1 FOR GRADE / PLINTH BEAM 25 MM (1" )
1.2 FOR FOOTING / PILE CAP BOTTOM 50 MM (2")
1.3 FOR COLUMN 50 MM (2")
1.4 FOR FOOTING / PILE CAP SIDE 75 MM (3")
1.5 FOR ALL ROOF BEAM 25 MM (1" )
1.6 FOR ALL ROOF SLAB 20 MM (3/4")
1.7 FOR R.C.C WALL (SHEAR WALL,SUMP) 40 MM (1-1/2")
1.8 FOR PILE SIDE 50 MM (2")
1.9 FOR SUMP BOTTOM SLAB 40 MM (1-1/2")
1.10 FOR COVER SLAB 25 MM (1")

AFTER CASTING CONCRETE


2.REMOVAL OF FORM WORKS 43 GRADE 53 GRADE
2.1 FOR COLUMNS 24 HOURS 12 HOURS
2.2 FOR ROOF BEAM SIDE 24 HOURS 12 HOURS

3.FOR ROOF BEAM BOTTOM


3.1 CLEAR SPAN LESS THAN 6M : 14 DAYS 07 DAYS
3.2 CLEAR SPAN MORE THAN 6M : 21 DAYS 14 DAYS

.
GENERAL NOTES & TECHNICAL NOTES
REFER SHEET 1
1.GRADE OF CONCRETE : M 20 FOR OTHER STRUCTURAL
ELEMENTS (AS PER IS 456-2000)
2.GRADE OF STEEL Fe 550 (AS PER IS 1786-2008)
3. DESIGNED FOR G+1 ONLY

THIS DRAWING IS VALID ONLY IF


CONSULTANT CHECK AT SITE
CLIENT

ARCHITECTS:

STRUCTURAL CONSULTANT

THIRU ASSOCIATES

ENGINEERS & CONTRACTORS


RELIABLE CONSTRUCTION
NO 66/20, SRINIVASA COMPLEX,
COLLEGE ROAD,
KARAIKUDI - 630 002.
230
PHONE : 9655298284
EMAIL : [email protected]
47 136 47
PROJECT TITLE:

PROPOSED RESIDENTIAL BUILDING


80

@KARAIKKUDI
JOB TITLE:
ROOF STRENGTHENING
300

DESIGNED : N.THIRUVALAR SELVAN,M.E(Struct)

CHECKED : N.THIRUVALAR SELVAN,M.E(Struct)


40

APPROVED : N.THIRUVALAR SELVAN,M.E(Struct)


SCALE 1:84
DATE 08.03.2025
SIZE A3
DWG .NO. 1D JOB .NO. 19-24 REV .NO. R0
CONNECTION PLATE-(CP1) Rev.No.