This weekly report covers the construction activities and progress for the Nigeria LNG Ltd project from June 15 to June 21, 2024. It includes sections on achieved and planned activities, quality assurance, health and safety, project control, and deviation requests. The report outlines ongoing construction works and future plans while addressing areas of concern.

Uploaded by

obi2ril
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
7 views

Weekly_Report Template doc

This weekly report covers the construction activities and progress for the Nigeria LNG Ltd project from June 15 to June 21, 2024. It includes sections on achieved and planned activities, quality assurance, health and safety, project control, and deviation requests. The report outlines ongoing construction works and future plans while addressing areas of concern.

Uploaded by

obi2ril
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Weekly Report No.

Period 15th June to 21sh June


2024

DATE PREPARED BY CHECKED BY APPROVED BY

Company Project No:


LOCATION: PROJECT: Contractor Project No.
NIGERIA LNG LTD PAGE
UNIT 7000 Weekly Report no. Sub-contractor Doc No:

PO NUMBER
Contractor Doc No:
Contents
1.0 GENERAL............................................................................................................Error! Bookmark not defined.
1.1 Introduction..................................................................................................Error! Bookmark not defined.
1.2 Project Description.......................................................................................Error! Bookmark not defined.
1.3 Scope of Work and Project Organization......................................................Error! Bookmark not defined.
1.3.1 Scope of Work............................................................................................Error! Bookmark not defined.

2.0 CONSTRUCTION ACTIVITIES................................................................................Error! Bookmark not defined.


2.1 Achieved This Week......................................................................................Error! Bookmark not defined.
2.1.1 TEMPORARY TRESTLE CONSTRUCTION WORKS.........................................Error! Bookmark not defined.
2.1.2 BUILDING PLATFORM................................................................................Error! Bookmark not defined.
2.1.3 ACCESS TRESTLE........................................................................................Error! Bookmark not defined.
2.1.4 LOADING PLATFORM.................................................................................Error! Bookmark not defined.
2.1.5 MOORING DOLPHIN..................................................................................Error! Bookmark not defined.
2.1.6 BREASTING DOLPHIN.................................................................................Error! Bookmark not defined.
2.1.7 ACCESS TRESTLE ABUTMENT & SLOPE PROTECTION WORK......................Error! Bookmark not defined.
2.1.8 FABRICATION WORKSHOP CONSTRUCTION AND PILE FABRICATION (PORT HARCOURT)...............Error!
Bookmark not defined.
2.1.9 NPT JETTY..................................................................................................Error! Bookmark not defined.
2.2 PLANNED NEXT WEEK...................................................................................Error! Bookmark not defined.
2.2.1 PRECAST PRODUCTION..............................................................................Error! Bookmark not defined.
2.2.2 PILE INSTALLATION....................................................................................Error! Bookmark not defined.
2.2.3 PRECAST INSTALLATION / SUPPERSTRUCTURE..........................................Error! Bookmark not defined.
2.2.4 ACCESS TRESTLE ABUTMENT & SLOPE PROTECTION CONSTRUCTION WORK.........Error! Bookmark not
defined.
2.2.5 FABRICATION WORKSHOP CONSTRUCTION AND PILE FABRICATION (PORT HARCOURT)...............Error!
Bookmark not defined.
2.2.6 NPT JETTY..................................................................................................Error! Bookmark not defined.
2.3 Area of Concern............................................................................................Error! Bookmark not defined.

3.0 QUALITY ASSURANCE & QUALITY CONTROL.......................................................Error! Bookmark not defined.


3.1 Achieved This Week......................................................................................Error! Bookmark not defined.
3.2 Planned Next Week......................................................................................Error! Bookmark not defined.
3.3 Area of Concern............................................................................................Error! Bookmark not defined.

4.0 HEALTH, SAFETY, AND ENVIRONMENT (HSE)......................................................Error! Bookmark not defined.


4.1 Achieved This Week......................................................................................Error! Bookmark not defined.
4.2 Planned Next Week......................................................................................Error! Bookmark not defined.
4.3 Area of Concern............................................................................................Error! Bookmark not defined.
4.3 HSE Statistics................................................................................................Error! Bookmark not defined.

5.0 DOCUMENT LIST.................................................................................................Error! Bookmark not defined.


5.1 Issued Document during the Week...............................................................Error! Bookmark not defined.
5.2 LETTERS/MOM SENT....................................................................................Error! Bookmark not defined.
5.3 Documents Received during the Week.........................................................Error! Bookmark not defined.
5.4 LETTER RECEIVED..........................................................................................Error! Bookmark not defined.

6.0 PLANNED MEETINGS..........................................................................................Error! Bookmark not defined.


6.1 List of planned meetings...............................................................................Error! Bookmark not defined.

Company Project No:


LOCATION: PROJECT:
Contractor Project No.
NIGERIA LNG LTD PAGE
UNIT 7000 Weekly Report no. Sub-contractor Doc No:

PO NUMBER
Contractor Doc No:
7.0 PROJECT CONTROL.............................................................................................Error! Bookmark not defined.
7.1 Progress Summary Table...............................................................................Error! Bookmark not defined.
7.2 EPC S-CURVE.................................................................................................Error! Bookmark not defined.
7.3 Variance Analysis..........................................................................................Error! Bookmark not defined.
7.3 Manhour Lost Distribution...........................................................................Error! Bookmark not defined.
7.5 Concrete Summary Table.............................................................................Error! Bookmark not defined.
7.6 List of Equipment..........................................................................................Error! Bookmark not defined.

8.0 DEVIATION REQUESTS AND TECHNICAL QUERIES................................................Error! Bookmark not defined.


8.1 Issued during Period.....................................................................................Error! Bookmark not defined.
8.2 Answered during Period...............................................................................Error! Bookmark not defined.
8.3 Outstanding request not answered by Contractor........................................Error! Bookmark not defined.

9.0 ATTACHMENTS...................................................................................................Error! Bookmark not defined.


Progress Pictures................................................................................................Error! Bookmark not defined.
Error! Bookmark not defined.

Company Project No:


LOCATION: PROJECT: Contractor Project No.
NIGERIA LNG LTD PAGE
UNIT 7000 Weekly Report no. Sub-contractor Doc No:

PO NUMBER
Contractor Doc No: