Project Document Title 00: SP-E0018-PQQ-Q11-PW-0017

The document outlines the Field Quality Plan for the upgrade works of a 108.4 MW Combined Cycle Power Plant and 33kV network in Sierra Leone, detailing inspection and quality assurance processes. It specifies roles of various stakeholders including the employer, contractor, and consultant, along with a checklist for plant automation system installation. The plan includes guidelines for material inspection, storage, handling, and pre-installation checks to ensure compliance with quality standards.

Uploaded by

asabbagh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
14 views4 pages

Project Document Title 00: SP-E0018-PQQ-Q11-PW-0017

The document outlines the Field Quality Plan for the upgrade works of a 108.4 MW Combined Cycle Power Plant and 33kV network in Sierra Leone, detailing inspection and quality assurance processes. It specifies roles of various stakeholders including the employer, contractor, and consultant, along with a checklist for plant automation system installation. The plan includes guidelines for material inspection, storage, handling, and pre-installation checks to ensure compliance with quality standards.

Uploaded by

asabbagh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

108.

4 MW (GROSS) CCPP AND


FIELD QUALITY PLAN FOR
UPGRADE WORKS OF 33KV Document
Project NETWORK, AT REPUBLIC
PLANT AUTOMATION
Title SYSTEM- DCS
OF SIERRA LEONE
Document Number SP-E0018-PQQ-Q11-PW-0017 Revision 00 Sheets 1 OF 4

108.4 MW (GROSS) CCPP AND UPGRADE WORKS OF 33KV


PROJECT:
NETWORK, AT REPUBLIC OF SIERRA LEONE
EMPLOYER:
CECA SL GENERATION LIMITED (“CECA SL”)

EMPLOYER’S ENGINEER (EE):

SARGENT & LUNDY, LLC

CONTRACTOR (SP):
SHAPOORJI PALLONJI & CO. PVT. LTD.
(EPC DIVISON)

CONTRACTOR’S
ENGINEER(CE): FICHTNER CONSULTING ENGINEERS (INDIA) PVT.LTD.
CHENNAI, INDIA

FIELD QUALITY PLAN FOR PLANT AUTOMATION


DOCUMENT TITLE:
SYSTEM- DCS

SP DOCUMENT NUMBER: SP-E0018-PQQ-Q11-PW-0017 R0

CE DOCUMENT NUMBER: NA
REVISION STATUS
SIGN

INITIALS

SIGN

INITIALS

SIGN

INITIALS

SIGN
R0 IOR 2025.02.18
INITIALS - - - MD SG

CV EL IC ME QA
DSN CHD APD APD DETAILS OF REVISION DATE
REV CLEARED

XXX SPEPC
OWNER : CECA SL GENERATION LIMITED
FIELD QUALITY PLAN FOR PLANT AUTOMATION SYSTEM- DCS SP-E0018-PQQ-Q11-PW-0017
(“CECA SL”) FQP No:

OWNER'S CONSULTANT: SARGENT & R0


SHAPOORJI PALLONJI AND CO PVT.LTD.- EPC DIVISON Rev:
LUNDY L.L.C

EPC CONTRACTOR: SHAPOORJI PALLONJI 18.02.2025


108.4 MW (GROSS) CCPP AND UPGRADE WORKS OF 33KV NETWORK, AT REPUBLIC OF SIERRA LEONE Date
AND CO PVT.LTD.-EPC DIVISION
CHARACTERISTICS/ACTIVITY AND CLASS OF TYPE OF QUANTUM OF REFERENCE DOCUMENTS AND FORMAT OF SUB- CONTRACTOR CLIENT /
SL. NO. INSTRUMENT Remarks
OPERATION CHECKS CHECKS CHECK ACCEPTANCE NORMS RECORDS CONTRACTOR (SPCL) EMPLOYER
A INCOMING MATERIAL INSPECTION Sheet No. 2/4
Manually / Hydra Crane Use proper material handling equipment with proper
A.01 Unloading From Vehicle / Truck Minor Visual 100% SPEPC/QC/26 H S S
/ Trolly safety precautions.

DCS Plant Automation system material and accessories


A.02 Visual inspection of packing Major Visual Visual 100% packing should be in good condition i.e. without breakage SPEPC/QC/26 H S S
of visual defects should not in opened condition.

Verification of qty, identification, materials sl.no from packing Material must be carefully unpacked & checked lot
A.03 Major Visual Visual 100% SPEPC/QC/26 H W R
list/challan. received with packing list / Delivery Challan
Reporting and taken photo of
A.04 Reporting of damage / Missing items. Minor Visual Visual 100% Check/Verify with Packing list/Delivery challan SPEPC/QC/26 & Photos H W R damage / broken items for
records.
B Storage

Manually/ Hydra
B.01 Movement to storage space Minor Visual 100% Use Proper Material handling equipment ------- H S S
Crane/Trolly
Material should be stored under shed/roof, clean, dry
space and protection from dirt, fumes, water/moisture
B.02 Storage Space Minor Visual Visual 100% Site Material Register H S S
and physical damage. Any special storage condition
mentioned by OEM.
Store in such a way which avoid direct mechanical hit
B.03 Storage Handling Minor Visual Visual 100% with sharp objects. Also store in such a way that easy Site Material Register H S S
material movement access to possible
C Shifting of Equipment

Use of proper material handling equipment with proper


C.01 Shifting to required location Minor Manually / Hydra Crane Visual 100% ------- H S R
safety precautions.
Equipment sould be kept on plain surface and easy
C.02 Handling Minor Visual Visual 100% material movement access to possible. Also take care the Equipment Supplier Manual H S R
material do not damage during handling.
D Pre-Installation
Before erection ensure availability of all related documents / Manufacturer installation manual / Approved GA & Layout
D.01 Minor Manually Physically / Manually 100% Log book / Site register H R R
tools Drawing / Data sheet
D.02 Internal components identification & labelling Minor Visual Visual 100% Approved Data sheet, GA & Layout Drawing Log book / Site register H S S
Check for civil Foundation if any & Embedment of Channels,
D.03 Minor Level Gauge Mechanical 100% Approved Data sheet, GA & Layout Drawing Log book / Site register H S S
Grouting, Levelling & alignment
D.04 Mounting of Base frame, Grouting, Leveling & Alignment. Minor Water Level Mechanical 100% Approved Data sheet, GA & Layout Drawing Log book / Site register H S S
Check for Panel and Operator work station positioning, and
D.05 Minor Visual Mechanical / Visual 100% Approved Data sheet, GA & Layout Drawing Log book / Site register H S S
Alignemnt
Check for interconnection for Power, Control & Earth Bus Bar & Continuity
D.06 Minor Mechanical / Visual 100% Approved Data sheet, GA & Layout Drawing Log book / Site register H S S
Power Earthing System (Multimeter)
E DCS PLANT AUTOMATION SYSTEM

E.01 HMI Graphic Symbol and Tag correct provided Major Visual Visual 100% Approved Data sheet, GA & Layout Drawing SPEPC/QC/E/01 H W W

Approved Data sheet, GA Drawing & Functional


E.02 Power ON Check and Functional Check Major Multimeter Electrical 100% SPEPC/QC/E/01 H W W
Diagram

E.03 DCS Control loop Check Major Multimeter Electrical 100% Approved Data sheet & Control Logic Diagram SPEPC/QC/E/01 H W W

Approved Data sheet, Control Logic Diagram &


E.04 Sequential Operation Check Major Functional Electrical 100% SPEPC/QC/E/01 H W W
Functional Diagram
NOTE :
LEGENDS :
R-Review SR-Site Register IR-Inspection Register/Report
P- Performer Execution of Inspection and Test
H -Hold Point (Stages cannot be cleared for further process)
W -Witness (Notification will be sent, unavailability of inspector in the schedule time will release stages for subsequent activities after interval inspection)
S -Surveillance (No specific notification will be raised)
Organization EPC-Contracator: SHAPOORJI PALLONJI AND CO PVT.LTD. OWNER'S CONSULTANT: SARGENT & LUNDY L.L.C OWNER : CECA SL GENERATION LIMITED (“CECA SL”)

Signature

Name Mr. Madhav DATE

Date 18.02.2025

SP-E0018-PQQ-Q11-PW-0017-R0 FQP FOR LV_Plant Automation System_DCS


108.4 MW (GROSS) CCPP AND UPGRADE WORKS OF
33KV NETWORK, AT REPUBLIC OF SIERRA LEONE

FIELD INSPECTION REPORT


OWNER : CECA SL GENERATION LIMITED (“CECA SL”) FORMAT No: SPEPC/QC/E/01 Rev. 0
OWNER'S CONSULTANT: SARGENT & LUNDY L.L.C REPORT No:
EPC CONTRACTOR: SHAPOORJI PALLONJI AND CO PVT.LTD.-EPC DIVISION DATE:
Drg. No.: Sheet No. 3/4
Civil Piping Machinery Painting
Discipline

Building Mechanical Tank/Silos Insulation


NDE Refractory Furnace
Electrical Instruments Steel Structure

Result
Sr. No. FQP Clause No. Inspection / Check Point Details Report No Remark
(OK/RJ/NA)

Legend: OK:Accepted RJ: Rejected with remarks NA: Not Applicable


SPEPC (Execution) SPEPC (QA/QC) CONSULTANT CLIENT

SIGN.:
NAME:

DATE:
108.4 MW (GROSS) CCPP AND UPGRADE WORKS OF
33KV NETWORK, AT REPUBLIC OF SIERRA LEONE

CHECK-LIST OF PLANT AUTOMTAION SYSTEM - DCS INSTALLATION


CLIENT: FORMAT No: SPEPC/QC/E/06, Rev. 0
Owner's CONSULTANT: REPORT No:
EPC CONTRACTOR: Shapoorji Pallonji & Co. Pvt. Ltd. DATE:
PROJECT:
DRAWING No.:
EQUIPMENT NAME: EQUIPMENT No.:
RATING: Sheet No.:- 4/4
Not
Sr. No. Description Yes No Remarks
Applicable
1 Physical check

2 Cabinet and Console furniture hardware check

3 Labeling check

4 Internal Wiring check

5 Verification of Controllers, Racks, Slots, Modules etc.

6 System Startup check

7 Cabinet Alarm Check

8 Redundancy Check

9 System Architecture Check

10 Time Synchronization Check

11 Software License Check

12 Graphic Check

13 I/O Loop check:- DI, DO, AI & AO Signals

14 Logic Check

10 Trend & Control Group, Log Reports Check

11 Controller Loading Check

12 Online / Offline Program Loading

13 Scan Time Check

14 Login Users and their access check

15 Communication with 3rd party systems check


Observation (If any):