Project Document Title 00: SP-E0018-PQQ-Q11-PW-0017
Project Document Title 00: SP-E0018-PQQ-Q11-PW-0017
CONTRACTOR (SP):
SHAPOORJI PALLONJI & CO. PVT. LTD.
(EPC DIVISON)
CONTRACTOR’S
ENGINEER(CE): FICHTNER CONSULTING ENGINEERS (INDIA) PVT.LTD.
CHENNAI, INDIA
CE DOCUMENT NUMBER: NA
REVISION STATUS
SIGN
INITIALS
SIGN
INITIALS
SIGN
INITIALS
SIGN
R0 IOR 2025.02.18
INITIALS - - - MD SG
CV EL IC ME QA
DSN CHD APD APD DETAILS OF REVISION DATE
REV CLEARED
XXX SPEPC
OWNER : CECA SL GENERATION LIMITED
FIELD QUALITY PLAN FOR PLANT AUTOMATION SYSTEM- DCS SP-E0018-PQQ-Q11-PW-0017
(“CECA SL”) FQP No:
Verification of qty, identification, materials sl.no from packing Material must be carefully unpacked & checked lot
A.03 Major Visual Visual 100% SPEPC/QC/26 H W R
list/challan. received with packing list / Delivery Challan
Reporting and taken photo of
A.04 Reporting of damage / Missing items. Minor Visual Visual 100% Check/Verify with Packing list/Delivery challan SPEPC/QC/26 & Photos H W R damage / broken items for
records.
B Storage
Manually/ Hydra
B.01 Movement to storage space Minor Visual 100% Use Proper Material handling equipment ------- H S S
Crane/Trolly
Material should be stored under shed/roof, clean, dry
space and protection from dirt, fumes, water/moisture
B.02 Storage Space Minor Visual Visual 100% Site Material Register H S S
and physical damage. Any special storage condition
mentioned by OEM.
Store in such a way which avoid direct mechanical hit
B.03 Storage Handling Minor Visual Visual 100% with sharp objects. Also store in such a way that easy Site Material Register H S S
material movement access to possible
C Shifting of Equipment
E.01 HMI Graphic Symbol and Tag correct provided Major Visual Visual 100% Approved Data sheet, GA & Layout Drawing SPEPC/QC/E/01 H W W
E.03 DCS Control loop Check Major Multimeter Electrical 100% Approved Data sheet & Control Logic Diagram SPEPC/QC/E/01 H W W
Signature
Date 18.02.2025
Result
Sr. No. FQP Clause No. Inspection / Check Point Details Report No Remark
(OK/RJ/NA)
SIGN.:
NAME:
DATE:
108.4 MW (GROSS) CCPP AND UPGRADE WORKS OF
33KV NETWORK, AT REPUBLIC OF SIERRA LEONE
3 Labeling check
8 Redundancy Check
12 Graphic Check
14 Logic Check
SIGN.:
NAME:
DATE: