Valves replacement
Valves replacement
12 14PM54B (HCO PA) pump discharge NRV 10” – A9A Body leak
19 Sponge absorber drain to CBD both valves Gate (2” – A19A) Passing
DB-1 column bottom PG t/o valve not Only drain valve will
20 Gate (3/4” – B1A)
operating & drain valve is passing be done as per Onsite
27 Unit LPG make-up to FG-KOD bush broken Gate (2” – B19A) Bush broken
P-1
P-1
Steaming of 3 meters
P-1 Hot Job
length loop
Nitrogen Purging of
Cold Job 15V51
P-1 Cold Job Loop depressurization
Hot Job GCU Steaming
Nitrogen Purging of
Cold Job
15V51
Column under Steam
P-1 Cold Job
purge
P-1
Cold Job Loop depressurization
GCU Steaming & LPG
make-up (B/L valve from
Cold Job Merox/CDU-II and CV
valves) passing to be
confirmed
Cold Job
P-1 Hot Job Main column steaming
Hot Job
Suction to Discharge
Hot Job
steaming
Hot Job
S. No Description Not operable
List to be prepared and
1 Critical valves servicing/Gland packing as per list finalized
List to be prepared and
2 HC Flange leaks attending as per list finalized
List to be prepared and
3 Steam leaks attending as per list finalized
4 BCW line repairs as per IWL
5 M/C O/H Drum PSV (14PSV3002) impulse line NRV leak
6 Sponge absorber top manway leak (clamp fixed)
WGC-I Casing drain line (1st one from east) leak at elbow
7
portion
8 LCO stripper bottom 20" manway neck leak
9 Sponge absorber off gas line repairs
10 WGC1 and WGC2 strainer cleaning
11 Feed filters cleaning
12 Pump strainers cleaning
13 Primary absorber internals cleaning
Sponge absorber top manway cover flange & SOP shell flange
14
repairs
15 15E56 for shell to tube sheet gasket replacement
16 15E65 (DB-II steam Reboiler) tube bundle replacement
17 Sponge absorber off gas line replacement.
18 15V05 drum overlay patch welding
19 14E04B Slurry I/L loop unplugging
20 14E52A/B/C to 15E57A/B HC line replacement
WGC-I handing over for Casing drain line (1st one from east)
21
replacement
Corroded loops replacement as per IWL
a. Fuel gas KOD to Flare/DB-II O/H drum line
22
b. DB-I O/H Drum Excess pressure to flare line
c. 15-V-54 boot line
Seal cooling water spools replacement based on spools
23
availability
Coolers condensers plugged TSV drain line unplugging and
24
replacement
25 Overhauling of 15-E-71 A&B (WGC2 LO coolers)
26 Pump seal steam header PSV fixing
27 15E65 tube bundle replacement
28 WGC-I LO coolers replacement - Overhauling
29 HCO stripper g/g drain line union leak to be arrested
30 FSD LG standpipe HP lead line unplugging
31 M/C bottom LG LP lead line unplugging
Priority Nature of Job Handing over Plan
P-1
P-1
P-1
P-1
P-1
P-1