This document outlines the final examination for the Project Management course for B. Tech. students at Annasaheb Dange College of Engineering and Technology, Ashta, scheduled for November 2, 2022. It includes instructions, a marking scheme, and a series of questions covering various topics such as project phases, cost estimation, quality management tools, and risk analysis. The exam is structured into units with specific questions that require detailed explanations and examples.

Uploaded by

tejaspoche100
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
9 views

1CSHS403 Project Management.pdf (1)

This document outlines the final examination for the Project Management course for B. Tech. students at Annasaheb Dange College of Engineering and Technology, Ashta, scheduled for November 2, 2022. It includes instructions, a marking scheme, and a series of questions covering various topics such as project phases, cost estimation, quality management tools, and risk analysis. The exam is structured into units with specific questions that require detailed explanations and examples.

Uploaded by

tejaspoche100
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

URN:- HX-014

ADCET, ASHTA

ADCET, ASHTA
Sant Dnyaneshwar Shikshan Sanstha’s
Annasaheb Dange College of Engineering and Technology, Ashta
(An Autonomous Institute affiliated to Shivaji University, Kolhapur)

Final Year B. Tech. (Computer Science and Engineering) (Semester – VII)


END SEMESTER EXAMINATION, [ESE] NOVEMBER 2022
(For Academic Year 2022-23, Odd Semester)

PROJECT MANAGEMENT [1CSHS403]


Day and Date:- Wednesday, 02.11.2022 Time:- 10.00 AM to 01.00 PM Total Marks:- 100
Instructions: -
1) All questions are compulsory
2) Make suitable assumptions wherever necessary, and mention them clearly in the answer book.
3) Figures to the rights indicate full marks and Course Outcome [CO] and Bloom’s Taxonomy (BL)
(K1-Remembering, K2- Understanding, K3 – Applying, K4 – Analyzing, K5 – Evaluating, K6 - Creating)
4) Draw neat diagrams whenever necessary.
5) The row below the question statement shows the short Marking Scheme [MS] applicable to expected answers.
Unit No. 01 + Unit No. 02 + Unit No. 03 Marks CO BL
Q. 1 Solve the following questions, [16]
a) Explain different project phases and project management life cycle in detail.. 08 [403_1] K2
MS–Phases [4], Life cycle [4]

b) Summarize methods for selecting projects in detail. 08 [403_2] K2


MS–Sketch [02],Each final answer[3 x2]

OR
b) Explain different types of project cost estimation. 08 [403_2] K2
MS–Each type [2*4]

Unit No. 01 + Unit No. 02 + Unit No. 03


Q. 2 Solve the following question (any two) [16]
a) Explain Following terms 08 [403_3] K2
1) Leadership skills of project manager
2) Product life cycle
3) Organizational Structures
MS–Each term [4x2]

b) Briefly explain common elements of a project management plan with example. 08 [403_3] K2
MS – Each element and example [2x4]

c) Design a Gantt Chart Organized by Project Management Process Groups. Explain 08 [403_4] K3
deliverables in detail.
MS - Gantt chart [05], Explanation [3]

Unit No. 04
Q. 3 Solve the following questions [18]
a) Sketch seven basic tools of quality. Explain Control chart in detail. 12 [403_4] K3
MS – Each tool [1.5*7], Explanation[2]
[Next Page]

ESE Nov. 2022 Page No: 1 ADCET, ASHTA


HX-014 Marks CO BL

b) Explain concept of Six Sigma in project quality management with example. 06 [403_3] K2
MS – Explanation [6] , Example[2]

Unit No. 05
Q. 4 Solve the following questions, (any two) [14]
a) Explain human resource management process in project management with example. 07 [403_1] K2
MS - Final answer [7]

b) Explain concepts of Acquiring, developing and managing project team and software 07 [403_5] K2
assistance.
MS – Each concept [2]

c) Interpret importance of human resource management in software development with 07 [403_4] K2


example.
MS – Each importance [1*7]

Unit No. 06
Q. 5 Solve the following questions. [18]
a) Differentiate Qualitative and Quantitative risk analysis in software development. 08 [403_6] K2
MS –Explanation [8]

b) Draw risk management technique diagram and explain different risk management technique 10 [403_4] K3
with example.
MS –Diagram [2], Each technique [2*4]

Unit No. 04 + Unit No. 05 + Unit No. 06


Q. 6 Solve the following questions, (any two) [18]
a) How quality plan affects of quality software development. Explain importance of quality 09 [403_5] K2
management plan.
MS –Explanation [9]

b) Explain Human Resource Management function in detail. 09 [403_4] K2


MS –Each function [1.5*6]

c) How the risk is identified and managed in project development. Explain steps of risk 09 [403_6] K2
identification and risk management.
MS –Explanation [9]

There is no shortcuts to any place worth going…!!

ESE Nov. 2022 Page No: 2 ADCET, ASHTA