Province D Olympia Registration of Project
Province D Olympia Registration of Project
PROVINCE D OLYMPIA-UPRERAPRJ556048/03/2025
UPRERAPRJ556048/03/2025
Contact Details
Update QPR Achievement Update Booking,Sales,Payments Upload Annual Report on Statement of Accounts
https://www.up-rera.in/ViewProjectInDetails.aspx?pm=Ow%2fkUB9MYIo%3d 1/5
3/21/25, 8:03 PM UP RERA : Uttar Pradesh Real Estate Regulatory Authority
: SECTOR-22D, YAMUNA
Address : PLOT NO. TS-02A, Village/Locality/Sector etc.
EXPRESSWAY,
State : Uttar Pradesh Project Duration (In month) : 36
Geographic Location
(end points of scheme/ project)
Latitude : 28.2907667 Latitude : 28.28513611
Sanctioned Plan
Type*
Select
Uploaded Uploaded
Permit Valid End Uploaded Uploaded Floor Uploaded Project Uploaded
SNo. Permit No Approve Sanctioned
Date Upto Date Approved Map Plan Of All Types Specifications Sajra Detail
Layout Letter
23-09- 22-09- 31-03-
1 YEA/PLNG/686/2024 Download Download Download Download Download Download
2024 2029 2028
Details of Apartment/Flat/Shop/Plot
Other Details
https://www.up-rera.in/ViewProjectInDetails.aspx?pm=Ow%2fkUB9MYIo%3d 2/5
3/21/25, 8:03 PM UP RERA : Uttar Pradesh Real Estate Regulatory Authority
Demarcation of Plots Designated Plots is demarcated as per the layout Plan issued by the Authority.
Boundary Wall Precast boundary wall will be constructed for the total master plan not for the individuals plots.
Road Work Internal roads designed of different R.O.W. as per the requirement.
Water Supply Including Drinking Water Facilities Municipal water supply is used for drinking purpose and details of water supply is also uploaded.
Sewer System Sewerage system is used with STP as per the design calculation.
Parks Landscape area is provided as per local building by laws and design.
Design For Electric Supply Including Street Lighting Electric supply including street lightning is provided as per the layout plan and details of
l t i it l l i l id d
Community Buildings Designed for community facilities as per the design requirement.
Water Conservation System N.A., Since it is a Foot Print/ Plotted Development Project.
Fire Protection And Fire Safety System Fire System and fire safety system is installed as per approved layout.
Other Miscellaneous Work Other Miscellaneous work is provided as per the layout Plan including roads, Green area,
l t i l k t
Registry/Agreement Details
No Data Found
https://www.up-rera.in/ViewProjectInDetails.aspx?pm=Ow%2fkUB9MYIo%3d 3/5