WORK HISTORY:
Page 2 of 7
WORK HISTORY:
Page 3 of 7
WORK HISTORY:
End Total
Start/End
Project Name Pipe Line Details Date Joints of
(ONGC MUMBAI) Date
Pipes laid
Page 4 of 7
WORK HISTORY:
HEERA RD PHASE -II 12" WF, HRC-HP, 14.3 mm WT 11.01.2014 17.01.2014 863
HEERA RD PHASE -II 12" WF, HRC-HK, 14.3 mm WT 18.01.2014 25.01.2014 630
HEERA RD PHASE -II 6 " GL, HB-HK, 7.9 mm WT 27.01.2014 31.01.2014 424
HEERA RD PHASE -II 6 " GL, HSB-HSD, 7.9 mm WT 31.01.2014 04.02.2014 446
PRP-3 SEASON-2 6 " GL, NLM 10 - NLM 8, 7.9 mm WT 04.02.2014 07.02.2014 327
HEERA RD PHASE -II 16" WF HRC to HSD,15.9 mm WT, 10.03.2014 19.03.2014 1009
PRP-3 SEASON-2 6" WF / 2" GL / Umbilical Piggy back, 05.04.2014 11.04.2014 208
ZA TO SSH2 11mm / 5.9 MM
PRP-3 SEASON-2 6" WF / 2"GL / Umbilical Piggy back, 12.04.2014 15.04.2014 195
IS TO SSH1 11mm / 5.9 MM
Project Name :THANG LONG – DONG DO