MEE D1

The document outlines the teaching plan for the Maintenance of Electrical Equipment course for the 2024-25 academic year at the Maharashtra State Board of Technical Education. It includes detailed units covering safety practices, maintenance schedules, testing and maintenance of rotating machines, transformers, and electrical machine insulation. Each unit specifies topics, execution dates, and teaching methods to be used throughout the semester.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
7 views3 pages

MEE D1

The document outlines the teaching plan for the Maintenance of Electrical Equipment course for the 2024-25 academic year at the Maharashtra State Board of Technical Education. It includes detailed units covering safety practices, maintenance schedules, testing and maintenance of rotating machines, transformers, and electrical machine insulation. Each unit specifies topics, execution dates, and teaching methods to be used throughout the semester.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

D1

For AICTE Diploma Courses

Maharashtra State Board of Technical Education

TEACHING PLAN (TP)

Institute Code: 0992 Academic Year: 2024-25


Program: Electrical Engineering. Course Code:MEE(22625)
Course: Maintenance of electrical equipment Name of Faculty:Mrs.kurhade R.K.
Semester: 6th

Actual
Ch. Plan
Execution Teaching
No. (From-To
Title/Details (From-To Method/ Remarks
/ & No. of
& No. of Media
(Hr) Lectures.)
Lectures.)

Unit I:Safety and prevention of accidents (Marks – 10)


1.1 Safety practices: safety, hazards,
accidents, dos and don’ts for electrical 01/01/25
supervisors.
1.2 Electrical shock: factors influencing Black
severity of shock, rescuing persons, 02/01/25 Board
procedures for artificial respiration. Chalks
1.3 Precaution against electric fires, use
Unit
I of fire extinguishers, actions in case of 03/01/25
such fires, types and operation of fire 04/01/25
extinguishers.

1.4 Earthing electrical equipment{ refer


IS code IS 3043-1087} :objectives, 07/01/25
classification of electrical equipment 08/01/25
with regard to protection against
electric shock: class 0 to III
Unit II:Maintenance schedules (Marks – 10)
2.1 Maintenance: routine, breakdown, 09/01/25
preventive and predictive maintenance, 10/01/25
factors affecting preventive 11/01/25
14/01/25
maintenance schedules.
Unit 2.2 Recommend maintenance
II schedules: transformers (IS 10028, part 15/01/25
III - 1981); single phase and three page 16/01/25
17/01/25
induction motor (IS 900-1992); three 18/01/25
phase alternators and synchronous 21/01/25
motors. 22/01/25
Unit III: Testing and maintenance of rotating machines. (Marks – 20)
3.1. Testing: need and standards,
tolerance, types: routine, type, special
and supplementary tests, Method of 23/01/25
testing: direct indirect and regenerative 24/01/25
Unit with advantages. and applications
III
3.2 Induction motor testing: routine,
type and special test of single phase 25/01/25 Black
induction motor as per IS 7572- 1974. 28/01/25 Board
(re-affirmed in 2002) and three phase Chalks
induction motor as per IS4029-2010
3.3 Alternate and synchronous motor
testing: routine, type, and special test 29/01/25
of three phase alternator, and 30/01/25
synchronous motor as per IS 7132-
1973 (re-affirmed in 2002)

3.4 Trouble shooting charts for single 31/01/25


phase and three phase induction motor 01/02/25
(IS 900-1992)

3.5 Foundations: requirements and


factors affecting rotating machine 04/02/25
foundation 05/02/25

3.6 Tools/instruments: bearing puller,


filler gauge, dial indicator, spirit level, 06/02/25
megger, earth tester, growler, test 07/02/25
lamps, multimeter, spanner of sets
and screwdrivers
Unit Unit IV:Testing and trouble shooting of transformers. (Marks - 20)
IV
4.1 Testing: type, routine and special 08/02/25
test as per IS2026-1981 for distribution 13/02/25
and power transformers 14/02/25

4.2 Causes of failure: internal and 15/02/25


18/02/25
external, types of faults: mechanical, 20/02/25
electrical and magnetic

4.3 Trouble-shooting remedies: trouble 21/02/25 Black


22/02/25
shooting chart for single phase and 25/02/25
Board
three phase transformers Chalks

4.4 Foundations: requirements for static 27/02/25


28/02/25
machine foundations, factors governing 01/03/25
them
Unit V: Maintenance of electrical machine insulation.(Marks - 10)
5.1Classification of insulating materials
as per IS 8504-1994 04/03/25

5.2Factors affecting life of insulating 05/03/25


materials.
5.3 Measurement of insulation
resistance at interpretation of condition 06/03/25
of insulation.
5.4 Transformer oil: properties, 07/03/25
contaminating agents, tests.
5.5 Straightening insulations, weakening Black
08/03/25
agents, cleaning, drying re-varnishing, Board
Unit baking, impregnation, filtration. Chalks
V
5.6Measures to be taken to maintain
the insulation resistance of electrical 11/03/25
machines to healthy levels.
5.7History sheets of Transformers and
induction motors:[ part A: machine
specifications with component
12/03/25
specifications, (installation information,
bearings, oil type, core weight, etc. As
applicable)
5.8 part B date wise: observations of
parameters such as voltage, current
13/03/25
temperature, etc. Symptoms work
carried out under Maintenance

Name & Signature of Staff Name & Signature of H.O.D.


Mrs. Kurhade R.K. Prof. Zadokar A.A.