The document is a detailed bar bending schedule for the KMC-26 project site, outlining the rebar requirements for various structural components including footings, shear walls, beams, columns, and slabs up to the plinth level. It specifies the diameter, spacing, weight per meter, total lengths, and total weights for each type of rebar used in the construction. The total weight of rebar required for the project is 11,856.63 kg.

Uploaded by

Ankit Kumar Shah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
14 views

Bbs

The document is a detailed bar bending schedule for the KMC-26 project site, outlining the rebar requirements for various structural components including footings, shear walls, beams, columns, and slabs up to the plinth level. It specifies the diameter, spacing, weight per meter, total lengths, and total weights for each type of rebar used in the construction. The total weight of rebar required for the project is 11,856.63 kg.

Uploaded by

Ankit Kumar Shah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

1

BAR BENDING SCHEDULE

Project Site:- KMC-26, Gongabu


Upto Plinth Level
Piece
Dia. Spacing Wt./m Total Total Wt.
SN Description Lot Nos. Length Remarks
(mm) (mm) (Kg) Length (Kg)
(m)
1 FOOTING
RAFT Footing BOTTOM BARS (X
16 150 1.58 1 66 10.85 716.19 1131.76
direction)
Bars (Y - direction) 16 150 1.58 1 69 10.24 706.68 1116.74
RAFT Footing TOP BARS (X
16 150 1.58 1 66 10.85 716.19 1131.76
direction)
Bars (Y - direction) 16 150 1.58 1 69 10.24 706.68 1116.74
Chairs 16 1.58 1 40 1.53 61.27 96.82

Total Rebar (Footing) = 4593.82 kgs


2 SHEAR WALL t=230mm
Basement Shear Wall
Main Bar Vertical Direction 10 175 0.62 2 213 4.07 1735.35 1071.21
Dist. Bar Horizontal Direction 8 175 0.40 2 18 42.45 1528.09 603.69
Total Rebar (Footing) = 1674.90 kgs

3 BEAM
Plinth Main Beams, 457*305
Top th Along 3-3 16 1.58 3 1 11.62 34.85 55.07
Top ext Along 3-3 16 1.58 4 1 7.49 29.98 47.37
Bottom th Along 3-3 16 1.58 3 1 11.62 34.85 55.07
Bottom ext Along 3-3 16 1.58 3 1 7.49 22.48 35.53
Stirrups 10 150 0.62 1 55 2.13 117.56 72.57
Stirrups 10 150 0.62 1 22 1.37 29.71 18.34

Top th Along 2-2 16 1.58 3 1 10.71 32.14 50.79


Top ext Along 2-2 16 1.58 4 1 6.63 26.51 41.90
Bottom th Along 2-2 16 1.58 3 1 10.71 32.14 50.79
Bottom ext Along 2-2 16 1.58 3 1 6.63 19.88 31.42
Stirrups 10 150 0.62 1 46 2.13 99.09 61.17
Stirrups 10 150 0.62 1 22 1.37 29.71 18.34

Top th Along 1-1 16 1.58 3 1 9.11 27.32 43.18


Top ext Along 1-1 16 1.58 4 1 6.02 24.08 38.05
Bottom th Along 1-1 16 1.58 3 1 9.11 27.32 43.18
Bottom ext Along 1-1 16 1.58 3 1 6.02 18.06 28.54
Stirrups 10 150 0.62 1 38 2.13 80.17 49.49
Stirrups 10 150 0.62 1 22 1.37 29.71 18.34

Top th Along A-A 16 1.58 3 1 9.92 29.76 47.03


Top ext Along A-A 16 1.58 4 1 6.03 24.14 38.14
Bottom th Along A-A 16 1.58 3 1 9.92 29.76 47.03
Bottom ext Along A-A 16 1.58 3 1 6.03 18.10 28.61
Stirrups 10 150 0.62 1 38 2.13 80.17 49.49
Stirrups 10 150 0.62 1 24 1.37 32.97 20.35

Top th Along B-B, C-C 16 1.58 3 2 10.45 62.71 99.10


Top ext Along B-B, C-C 16 1.58 4 2 6.49 51.92 82.04
Bottom th Along B-B, C-C 16 1.58 3 2 10.45 62.71 99.10
Bottom ext Along B-B, C-C 16 1.58 3 2 6.49 38.94 61.53
Stirrups 10 150 0.62 1 89 2.13 190.62 117.66
Stirrups 10 150 0.62 1 48 1.37 65.95 40.71

Plinth Secondary Beams, 305*230


Top th Along 11.5' 16 1.58 3 2 3.94 23.64 37.35
Bottom th Along 11.5' 16 1.58 3 2 3.94 23.64 37.35
Stirrups 10 150 0.62 1 62 0.97 60.24 37.18

Top th Along 5.5' 16 1.58 3 1 2.14 6.41 10.13

Checked By:
Prepared By: Approved By:
2

BAR BENDING SCHEDULE

Project Site:- KMC-26, Gongabu


Upto Plinth Level
Piece
Dia. Spacing Wt./m Total Total Wt.
SN Description Lot Nos. Length Remarks
(mm) (mm) (Kg) Length (Kg)
(m)
Bottom th Along 5.5' 16 1.58 3 1 2.14 6.41 10.13
Stirrups 10 150 0.62 1 13 0.97 12.73 7.86

Top th Along 17.92' 16 1.58 3 1 5.92 17.77 28.07


Bottom th Along 17.92' 16 1.58 3 1 5.92 17.77 28.07
Stirrups 10 150 0.62 1 51 0.97 49.26 30.41

Total Rebar (Beam) = 1716.48 kgs


4 Column
For upto Ground Floor

Column (457X457)

C1 25 3.86 8.00 3 7.90 189.60 731.48 First


20 2.47 4.00 3 6.13 73.50 181.48
Strirups 8 100 0.40 1.00 118 2.92 344.18 135.97

Column (406X406)

C2 25 3.86 8.00 2 7.90 126.40 487.65 Second


20 2.47 4.00 2 6.13 49.00 120.99
Strirups 8 100 0.40 1.00 79 2.53 198.95 78.60
C3 25 3.86 4.00 1 7.90 31.60 121.91 Third
20 2.47 8.00 1 6.13 49.00 120.99
Strirups 8 100 0.40 1.00 39 2.53 99.28 39.22
C4 20 2.47 6.00 3 7.55 135.90 335.56 Fourth
20 2.47 6.00 3 6.13 110.25 272.22
Strirups 8 100 0.40 1.00 39 2.53 99.28 39.22
Total Rebar (Column) = 2798.56 kgs

5 SLAB
PLINTH LEVEL Slab
Bottom bar, Along X-axis 10 150 0.62 1 34 11.06 376.17 232.20
10 150 0.62 1 22 5.56 122.36 75.53
Bottom bar, Along Y-axis 10 150 0.62 1 23 8.96 206.17 127.27
10 150 0.62 1 13 9.57 124.46 76.83
10 150 0.62 1 30 5.69 170.60 105.31
Top bar, Along X-axis 10 150 0.62 1 34 7.13 242.31 149.57
10 150 0.62 1 22 4.87 107.05 66.08
Top bar, Along Y-axis 10 150 0.62 1 23 5.99 137.66 84.98
10 150 0.62 1 13 6.59 85.73 52.92
10 150 0.62 1 30 3.65 109.56 67.63
Chairs 10 0.62 1 80 0.70 56.00 34.57
Total Rebar (Slab) = 1072.88 kgs
Total 11856.63

Checked By:
Prepared By: Approved By: