• Pollution reduction.
• Cost saving policy for end user by Gov.
• Encourage business in EV industry
• EV Charging Infrastructure
• Gov. Subsidies Vs Premium cost of EV
• Autonomies mileage anxiety
• Battery Tech. develops Slow…
Charging Infrastructure in China
Unification EV Charger Standard GB/T 20234 From 1st Jan.2016
Electric Electromagnetic
Driving Efficiency : Consumption :
Nominal power Data. Environment Safety:
Current meters / BMS
data. Electromagnetic Meter.
EV Test 1: General Electric Safety Check
Check list Item Requirement
• Power Battery
• Motor External requirements of electric vehicles below
• Motor controller should not be significantly deformed, damaged,
warning signs should be clear and firm. EV OBD
• DC-DC converter
check
• Charger and other housing
Testing condition:
• SOC > 30%, Bat.
• Temperature < 65 °C
Testing condition:
• Discharged EV battery to 0 %
• Holding time 20-30 mins.
4 Electromagnetic Environment
EV Test 4:Suggested KPI limit ( according to GB/T or Regional directive)
Drive Efficiency Factor K Energy Consumption Limit
DB-44 GuangDong 2 GB/T 36980 -2018
@ 50% of load in Dyno,
@ 60km/h Depends on Gross Weight from
K≥ 50% 750kg to 2510kg (passenger Car):
Real Wheel PW Vs 13.1 - 21.9 Kw h/100km
Motor Nominal PW
Comprehansive EV Report:
• Intergrated all test items
• Digital Data management
• Contact:
Ken Wang
Intl. Sales Director of COSBER
10th, F1, TCL Intl. Science E-Park, 1001 Zhongshanyuan Road, Shenzhen, China
Tel.: +86 755 2572 7015