1213854/2025/O/O DY.CE/CON/3/MLG/NFR
NORTHEAST FRONTIER RAILWAY
iCONSTRUCTION ORGANISATION)
(Ofce of (he
Dy. Chicí ËnginceriConstruction-iii
Katihar, N. F. Railway
To
The Dy. CEConnDesign
NI Railway. Mal1gaon.
Sub: Adopting 12.2 mComposite (Girder (Drg No. RDSO/B-1752) with 8.8 Grade HSFG bolts.
Ref: i)C.A. No.:- NFRNFRC/Civil/2024/010. dtd: 16.02.2024.
Name of Work: Balance work of sub-structure and superstructure of major bridge No. 04 (5x45.72 m
UWG Through Welded Steel Girder), BridgeNo. l6 (4x12.2 mPsc Slab), Bridge No. 20 (Ox122 m
CompositeGirder). Bridge No. 26(3x12.2 m PSCSlab) and Bridge No. 36 (3x45.72 mOWG Through
Welded Steel Girder) between Balurghat to Hili and other ancillary woks in connection with new BG
line projcct from Balurghat to Hilli of N.F. Railway (Construction).
Namc of Agency: M/s Anil Kumar Mandhyani, Amla Tola, Katihar (Bihar)
With refcrence to the above subject, it is to inform vouthat the Construction work of Substructure of
bridge no 20 (3 x 12.2 m C.G) between Kamarpara-Trimohini section was completed in the year 2012 as per
RDSO drawing no. RDSO/B-11752 (25 T Loading) as mentioned in approved GAD of bridge no. 20 of
BLGT-HILLI new line project. But superstructure of the bridge could not be completed at that time due to
paucity of fund and construction work was stopped vide HÌ LNO. W/CE-CON-3/Misc.NJP dtd.
24/04/2013. Furher the project was kept in abeyance by the Railway Board vide L/NO. D.O.2019W
1/Genl /Budgevl dtd. 24.09.2019. This project was deftreezed by Railway Board vide L/no. 202 W.
1NFRINL/Hilli-Balurghat dtd. 08.03.2022. Subsequently construction work of bridge was resumed since
March-2024 with award ofa new contract vide C.A. No. NFRNFRC/Civil/2024/O10, dtd: 16.02.202
Further it is to mention that holes for anchor bolts of bearing are kept as per Drg no. RDSO/B-|1752/4 (0ld)
on alreadv constructed bed block. Ilence it is suggested to use RDSO drawing no,
RDSO/B-l|752 with
HSFG bult in place of Rivets lor labrication of compositle girder us per Railway Board's letter no.
2014/CE
III/BR/Bridge Policy. dated: 31.08.2015
In view of abuve, necesary apprOval nay kindly be
communicated tor use ot |ISFG Boll s mentioned
above.
(KKS
Dy. CEOn-3KIR
N.F. Railway
sselBrkoijeis
(KK. Singh)
Dy CE/Con-3/KIR
N.F. Railway
3/24
Dta19S 20/8
1213854/2025/O/O DY.CE/CON/3/MLG/NFR 392
ReedRAD Dt....Overnment of India
Sectt 28 DG
Se Ministry of Railways ADG}
DSecDt.o3.
(Railway Board) DATE 2/9
New Delhi, dt. 31.08.2015
Na 2014CE-/BR/Bridge policy
Administrative Officers/Const.,
LIoral Railways
Sub: Use of High Strength Friction Grip (HSFG)bolts on Indian Railways.
Riveted Steel Girders have been in use on Indian Railways since
ng However, the concept of riveting has become outdated now due to various
=25ns Large scale welding for Bridge Girders is also not proving to be abetter option
r0an Railways as there are quality concerns with the field welding. There is a need
20coang a suitable alternative. To keep pace with the latest technological
egooments, as a suitable alternative to riveting, HSFG bolts can be adopted which
have any such 0sSues.
Sanjan/a-@-15
(S.K. Srivastava)
8332n
Cooy for information and necessary action:
Executive Director CE/B&sS
Railway Board
INDM
(ratur)
nferia, As-781011
FAX 0361-2571794
Dt. 24 2013
No.WICE-CON-3/isc/NJP.
Dy.Chief Engineer/CONNJP,
Dy.ChlefEngineer/CONIAPDJ,
D.ChiofEngineer/CONIMLDT,
N.F.Ralway.
existingContracts.
Sub: Fore-closure of
less
following Projects are very very
decided
funds in the it has been
The allotment of pending liability. Therefore,
thefollowing section.
found insuficient to clearthe should be executed in
which is existing CA
no further work against
that
1. Rajabhatkhowa-Jayànti.
2. Chalsa-Naxal
3. Raiganj-Dalkhola
4. Balurghat- Hili
5. Kaliyaganji Buniyadpur
6. Gazole-Itahar
7.8.itahar- Buniadpur
Itahar -Raiganj
9. Araria-Galgalia may
10.Kisharnganj-Jalalgarh.
above mentioned Projects
of the pending
done against the CAs of fund to clear
The work requirement
the
bill prepared so that
and
be recorded up.
liability isfirmed
(S.C.Rajak)
Chief Engineer/CON3
N.F.Railway, Maligaon
infomationplease,
CAO/CON-2MLG:for kind
Copyto
5/24
1213854/2025/O/O DY.CE/CON/3/MLG/NFR Ctoc| dhay
Mukesh Kumar Gupta $ fto-110001
B011-23387963
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
a (HAILWAY BOARD)
'BHAVAN, NEW DELHI-110001
Therefore, the projects of your Railway have been thoroughly reviewed in Board
and accordingly a list of 07 projects (Annexure-l) have
approval of Board (ME, MT & CRB), on which, no further been prepared with the
done till further orders. The projects which are in advanced expenditure is to be
and are crucial for Railway operation will be stage of completion
completed on priority with the
available resources so that, benefit will start coming to railway early.
Hence, the list of 07 projects is being sent to your Railway with
no further expenditure is to be made on these instructions that,
projects ill further orders &
execution on these railway projects should be kept in abeyance.
With regards,
DA: As above (Annexure-l)
Yours Sincerely.
NL Sute
WB
Nagatan NER
alyagan-Buniadpu
WB WB WE
Eklakh-Balurghat(67
tahar-8unadpurkm)(39 tor
Raigan
Gazole-haher(20 11
Chatsa-Nacaban
Rajabhatthowe-Jaint Branch Ouapur-Tat
NL
Bongagaon New
NL |Baughat-Hill
JataigartKishangan
Project
nes -tahar
Jalpagun-Silgurn-New
km)
& (21
new &
slong
8new
km)
MIM
wth &
MNi km) Projects
|InclusionN Year
anction
tor 1963-64
199&-99 2013-14 2010-11 2010-1 2008-09g
Total of
length
km)sioned (on
in
454 15 33
13 296 50
87
16322
On
257
Mar19 Commis
Balence
Length Which
06
91
402
14201Dlength
52
15 257 33
13 29,6 87
50
7631
Expenditure
lCost
(Rs utat
703 tn
1871 4274 380 471 380 cr.)
Expenditure
uploContracts
done o
August
(Rs. In
274.96 theogainst
agenceIn
10876 38.1B 68.15 667
galnstCr.)2019
to
(Rs. awerdedAmount
Project be
33.39
6.15
Cr.)
In Kept
olotal
(Cr.) exCUted
contcts
Wrded in
14.09
434
Work ]CAbeyance
ont rapayment
ctual Value
thecontractual
lor made Total
contracts(Cr.)
vwarded
galnstthe the
ezeCuted Amount
10.656 3.5 to
work the
of
166281 HitaatThis
orLand Hoctare
fcompleted
scquisition
Buthonty
Authority
Distric
stopped 7 |acquis1tron Ekiakhi-Balurghat
MM:Modification
Land MM:requiredBalance Senctioned
|Orlglnally
(22. (66.76
New
Gazole-tahar
(47 MM:
Rajabhatkhowa-Jaind Finger|tom |The
P) |Detaled
cquisitton 50Det 121 16
allsPO Fakiragram
RajabhthowNintd:
Chaha-Naxal
conveyed Sanctioned
Bengal Projct Kmled tahar-Raganj
plan Gazole-taharLand Unes Km) Km)
RoyebSeby within
onthrough
Chaisa-Na
ines Now
work,
i)
Estimato
length
Itahar-unadpur
Estmate
wan
for
lor not Plan
land Ha)
commissionod &
24by commsSOned
as Dhubn ofGauoe
of Approval oonnect acqutsition Remarksany)(if
the land donehave handed (27
07
Add Materia Jalpegun-New
work land only
is of sancioned
ahar-Bun
2013 critlcalButa Ahpurduar
newtine under lor fand AI
present yet 20
in of acquIsiton boen
PCCF pogress Coverson sUbmitedto
competent the
tssanctioed Rs
preparaton lend 125under over Km) on
wildTIger Modiicaton
newline(15 13 requred
Bangladesh for
The (19 Jn rate completed.
FLS 60 dpur
Govt ilfe Bongagaon. 45 submitted 100 30
ReseN 85
-Baanhat 47 process Raiganj-Itahar
lo
habitat
alilgament km)
of wted
Jont submted Ma (27.095 12
main Crores a Km
of Raiways Material 2004
West and & suvey border woks land An
ane Land
length
as w) &i) for to Km)
1s
7/24
1213854/2025/O/O DY.CE/CON/3/MLG/NFR
GOVERNMENT OFINIDIA
MINISTRY OF RAILWAYS
AzadiK¡ (RAILWAY BOARD) Azadi Ka
Amrit Mahotsav Amrit Mahotsav
No. 202W-1NFRNLHili-Balurghat New Delhi |10001,dated 08.03 2022
Vide Railway Board's letter under reference (i) above, it was advised to Railway that no
expenditure is to be made on Balurghat-Hili (29.6 km) new line project till further orders and
execution of the project should be kept in abeyance.
N.F. Railway's request received vide letter under reference (ii) above has been examined
and it has been decided by the competent authority to defreeze the Balurghat-Hili (29.6 km) new
line project. An outlay of Rs. 20.00 crore has been proposed for this project in FY 2022-23.
Railway is advised to initiate land acquisition for the project afresh as per latest instructions of
Railway Board.
This has the approval of Board (Member/Infra, Member/0&BD and CRB & CEO),.
(Mobit Kumar)
Director (Works-I
Railway Board
Rivts
Is &oo: (494 , Tasle 81)
046X|0
Max Priseible strs u M222 HeFG Bot =
ssE<eR/elp
ocloz<2s
19/24
1214963/2025/O/o DY.CE/CON/DESIGN-2/NFR
20/24
1214968/2025/O/o DY.CE/CON/DESIGN-2/NFR
IS 4000 : 1992
5.3.3 Joints Subject to Shear and Tensile Forces 5.4.2 Joints Subject to Shear Force Only
Bearing-type joints subject to shear and tensile In friction-type joints subject to shear force
forces shall be proportioned so that: only in the Plane of the effective interfaces, the
( pt/pto )” + ( v/vob )” d 1.0 number and dispositions of high-strength bolts
shall be proportioned so that the resulting
5.3.4 Limitations of Transmitted Forces force at any boIt positions does not exceed the
value:
For bolts of all diameters, bearing force in
Newtons transmitted between any bolt and any Slip factor x Number of effective interfaces x
ply shall not exceed 1*2xf,x dx t. In addition, M;nimum bolt tension
the component of a force rn newtons on a ply
acting on the edge of a bolt hole in the Factor of safety
direction of the minimum distance toward the
edge of a ply shall not exceed e f4-. t/l-4. In the above expression, the factor of safety
shall be taken as 1.4 for structures and mate-
5.4 Friction Type Joints rials within the scope of IS 800 : 1984 and for
the load combination specified therein. No
5.4.1 General additional factor is required to take account
of fatigue conditions. Where the effect of wind
Where the surfaces in contact comply with the forces on the structures has to be taken into
requirements of 6.2 and the surfaces are clean consideration, this factor of safety may be
‘as rolled’, slip factor shall be assumed as 0.35. reduced to 1.2 provided the connections are
If any applied finish, or other surface condi- adequate when (i) wind forced are not consi-
tions including a machined surface is desired, dered, (ii) wind is not the primary loading for
slip factor used shalI be based upon tests the purpose of design. For structures not
performed in accordance with the procedure covered by IS 800 : 1984, the factor of safety/
given in Annex B. load factor given in the appropriate design
NOTE - In the absence of test results, the slip standard shall be used.
factor given in Annex C for different surface condi-
tions generally adopted may be used at the discre-
tion of the designer. 5.4.3 Joints Subject to Shear and Tensile Force
5.4.1.1 Joints shall be identified in accordance An externally applied tension in the direction
with 5.6 and the fabrication drawings shall of the bolt axis reduces the effective clamping
indicate the surface treatment required at each action of a bolt which has been tightened to
joint and whether masking of the joint is induce shank tension. To allow for this effect
required during painting shall also be indicated. the bolt shall be proportioned to satisfy the
3
21/24
1214979/2025/O/o DY.CE/CON/DESIGN-2/NFR
22/24
1214979/2025/O/o DY.CE/CON/DESIGN-2/NFR
23/24
1214979/2025/O/o DY.CE/CON/DESIGN-2/NFR
24/24
1214979/2025/O/o DY.CE/CON/DESIGN-2/NFR