Subdivision Land Development Costing
Subdivision Land Development Costing
SUBDIVISION
PROJECT :
LOCATION :
SUBJECT :
DATE :
ITEM
PARTICULAR UNIT
NO.
2.1 Concrete Pavement (Sub-Grade Preparation, Base Coarse, Formworks, Rebars, Concreting 3000psi)
Road 10-M (W=5.50M; thk = 0.20M) SM
2.2 Curb and Gutter (Compaction, Gravel Bed, Formworks, Concrete 3000psi)
Road 10-M (width = 0.25M) LM
3.0 STORM DRAINAGE SYSTEM (Excavation, Compaction, Sand Bedding, Pipe Laying and Backfilling)
4.0 WATER SUPPLY SYSTEM (Excavation, Compaction, Sand Bedding, Pipe Laying & Backfilling)
100mmØ (4"Ø) PC
75mmØ (3"Ø) PC
50mmØ (2"Ø) PC
100mmØ (4"Ø) PC
75mmØ (3"Ø) PC
50mmØ (2"Ø) PC
100mmØ (4"Ø) PC
75mmØ (3"Ø) PC
50mmØ (2"Ø) PC
G RAND T O T A L
PMENT COSTING
DIVISION
MATERIALS LABOR
TOTAL AMOUNT
QTY
Unit Cost Amount Unit Cost Amount
Unit Cost Amount
18,465.00
13,400.00
172,500.00
- - ###