This document outlines the method statement for rectifying the deflected area between GL:F11-F10 in Building F, detailing the procedures, responsibilities, materials, and safety measures required for the work. It emphasizes the importance of compliance with safety protocols and quality standards throughout the rectification process. The document is intended for review and approval by relevant parties involved in the project.

Uploaded by

nicolo buluran
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
9 views

Ms-rectifacation on Deflected Segment

This document outlines the method statement for rectifying the deflected area between GL:F11-F10 in Building F, detailing the procedures, responsibilities, materials, and safety measures required for the work. It emphasizes the importance of compliance with safety protocols and quality standards throughout the rectification process. The document is intended for review and approval by relevant parties involved in the project.

Uploaded by

nicolo buluran
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 7

ROTAFLEX CONSTRUCTION & DEVELOPMENT CORP.

Document No.: Date: Revision:


RCDC-VAIL-JCVA-MS-010 August 14,2024 0

METHOD STATEMENT FOR RECTIFYING


THE DEFLECTED AREA BETWEEN
GL:F11-F10 BLDG. F

Prepared By Noted By

GRACE PAGUIDOPON RIC PIERRE Q. TORNO


QA/QC ENGINEER PROJECT MANAGER
DATE: DATE:
ROTAFLEX CONSTRUCTION & DEVELOPMENT CORP.
Document No.: Date: Revision:
RCDC-VAIL-JCVA-MS-010 August 14,2024 0

REVISION SHEET

Revision Date Description/ Summary of Initial Date


No. Revision
0 August 14, 2024 For Review and Approval
ROTAFLEX CONSTRUCTION & DEVELOPMENT CORP.
Document No.: Date: Revision:
RCDC-VAIL-JCVA-MS-010 August 14,2024 0

TABLE OF CONTENT

SECTION SECTION DESCRIPTION PAGE/S


1.0 Introduction
2.0 Scope of Work
3.0 Objective
4.0 Responsibilities
5.0 Materials and Equipment
5. 1 Chipping Gun
5.2 Epoxy
5.3 Hammer
5.4 Phenolic board
5.5 Nails
5.6 Steel Brush
5.7 Circular Saw
5.8 Shoring Jack
5.9 Aloma
6.0 Swivel clamp

6.0 Affected Area


6.1 Key Plan
7.0 Procedure
7. 1 Surface Preparation
7. 2 Surface Execution
7.3 Quality Control
8.0 Safety Measure
9.0 References
10.0 Approval and Review

1.0 INTRODUCTION
ROTAFLEX CONSTRUCTION & DEVELOPMENT CORP.
Document No.: Date: Revision:
RCDC-VAIL-JCVA-MS-010 August 14,2024 0

This Method Statement is for the rectification of the deflected segment in Building F.
GL:F11-F10. It is a detailed and essential document that outlines the proper work
procedures, necessary safety measures, and equipment to be used during these
rectification activities. It is critical to adhere to these instructions to ensure that the
work is completed efficiently, safely, and in full compliance with all relevant
regulations, specifications, and contract drawings.

2.0 SCOPE
Outline the scope of the rectification of segment beam and slab. This method
statement shall be used for Civil/ Structural Works. RCDC shall be accountable to
comply with all works and safety stipulated/measures as stated in the safety
program and on this method statement.

3.0 OBJECTIVE
The purpose of this Civil/ Structural work method statement is to provide a detailed
description that outlines the procedures required for the rectification of the
segment that has been deflected in GL:F11-F10 and all other associated activities. It
is important that all personnel involved in the task understand this method
statement before commencing the activity.

4.0 RESPONSIBILITIES
Ite Description Remarks
m
1.0 Project Manager /Assistant Overall responsible for the project site, operation
Project Manager and processes.
2.0 Project Engineer Responsible for the work execution. The Project
Engineer must ensure that all technical direction
and works are address, completed and maintain
in accordance with the provided specification by
the client, consultant, construction management,
and approved method statement.
3.0 QA/QC Engineer Guarantees the sound quality of the materials
and methods of execution, maintains standards
ROTAFLEX CONSTRUCTION & DEVELOPMENT CORP.
Document No.: Date: Revision:
RCDC-VAIL-JCVA-MS-010 August 14,2024 0

and makes sure work progresses according to it.

4.0 Survey Team Responsible for survey works for all site works.
5.0 Health and Safety officer Ensure that all safety procedures and equipment
are in place.

5.0 MATERIALS AND EQUIPMENT


5. 1 Chipping Gun
5.2 Epoxy
5.3 Hammer
5.4 Phenolic board
5.5 Nails
5.6 Steel Brush
5.7 Circular Saw
5.8 Shoring Jack
5.9 Aloma
6.0 Swivel clamp

6.0 AFFECTED AREA

7.0 PROCEDURE
ROTAFLEX CONSTRUCTION & DEVELOPMENT CORP.
Document No.: Date: Revision:
RCDC-VAIL-JCVA-MS-010 August 14,2024 0

7.1 Surface Preparation


 Using appropriate tools and equipment cut and hack the area that
has been affected by the deflection.
 Clear the rectification area of any debris or loose concrete
fragments and clean the existing reinforcements.

7.2 Surface Execution


 Remove and replace deflected area cut it on L/3.

L/3
L/3

L/3
L/3

 Restore the formwork for the affected area. Ensuring that the
elevation has been attained.
 Restore Mefps rough-ins by coordinating with other Contractor.
 Restore all the reinforcement by lifting the formwork system
through Tower Crane.
 Provide epoxy on the joints.

7.3 Quality Control


 Regular inspection will be conducted during and after work to
ensure that the work meets the required standard.

8.0 SAFETY MEASURE


ROTAFLEX CONSTRUCTION & DEVELOPMENT CORP.
Document No.: Date: Revision:
RCDC-VAIL-JCVA-MS-010 August 14,2024 0

 All personnel involved shall comply with the safety procedures or


instruction as set in out the project safety plan, rules, and
regulations.
 Basic Personal Protective Equipment (PPE) shall be worn by all staff
or construction team.
 Safety measures, including fall protection and confined space
procedures, will be in place and followed.

9.0 REFERENCES
9.1 Vail Residences Specification
9.2 FCD Drawings
9.3 Project Quality Plan
9.4 Project Safety Program

10.0 APPROVAL AND REVIEW

10.1 This method statement will be reviewed regularly and updates as


necessary.
10.2 All parties involved will approve this method statement.