Ms-rectifacation on Deflected Segment
Ms-rectifacation on Deflected Segment
Prepared By Noted By
REVISION SHEET
TABLE OF CONTENT
1.0 INTRODUCTION
ROTAFLEX CONSTRUCTION & DEVELOPMENT CORP.
Document No.: Date: Revision:
RCDC-VAIL-JCVA-MS-010 August 14,2024 0
This Method Statement is for the rectification of the deflected segment in Building F.
GL:F11-F10. It is a detailed and essential document that outlines the proper work
procedures, necessary safety measures, and equipment to be used during these
rectification activities. It is critical to adhere to these instructions to ensure that the
work is completed efficiently, safely, and in full compliance with all relevant
regulations, specifications, and contract drawings.
2.0 SCOPE
Outline the scope of the rectification of segment beam and slab. This method
statement shall be used for Civil/ Structural Works. RCDC shall be accountable to
comply with all works and safety stipulated/measures as stated in the safety
program and on this method statement.
3.0 OBJECTIVE
The purpose of this Civil/ Structural work method statement is to provide a detailed
description that outlines the procedures required for the rectification of the
segment that has been deflected in GL:F11-F10 and all other associated activities. It
is important that all personnel involved in the task understand this method
statement before commencing the activity.
4.0 RESPONSIBILITIES
Ite Description Remarks
m
1.0 Project Manager /Assistant Overall responsible for the project site, operation
Project Manager and processes.
2.0 Project Engineer Responsible for the work execution. The Project
Engineer must ensure that all technical direction
and works are address, completed and maintain
in accordance with the provided specification by
the client, consultant, construction management,
and approved method statement.
3.0 QA/QC Engineer Guarantees the sound quality of the materials
and methods of execution, maintains standards
ROTAFLEX CONSTRUCTION & DEVELOPMENT CORP.
Document No.: Date: Revision:
RCDC-VAIL-JCVA-MS-010 August 14,2024 0
4.0 Survey Team Responsible for survey works for all site works.
5.0 Health and Safety officer Ensure that all safety procedures and equipment
are in place.
7.0 PROCEDURE
ROTAFLEX CONSTRUCTION & DEVELOPMENT CORP.
Document No.: Date: Revision:
RCDC-VAIL-JCVA-MS-010 August 14,2024 0
L/3
L/3
L/3
L/3
Restore the formwork for the affected area. Ensuring that the
elevation has been attained.
Restore Mefps rough-ins by coordinating with other Contractor.
Restore all the reinforcement by lifting the formwork system
through Tower Crane.
Provide epoxy on the joints.
9.0 REFERENCES
9.1 Vail Residences Specification
9.2 FCD Drawings
9.3 Project Quality Plan
9.4 Project Safety Program