Atms_work Permit Dec16
Atms_work Permit Dec16
APPLICANT’S INFORMATION
Applicant’s Name: Tower/Unit No. Date Applied (mm/dd/yyyy):
Jeraldine Custodio Tower 2 - Unit 814 12/16/24
(Must be at least 3 days before date of work)
Applicant is: Owner Tenant Contractor (common area) Contact Number: Date of Work (mm/dd/yyyy):
Authorized Representative 12/16-19/24
(Except Weekends and Holidays)
REQUIREMENTS
For Owner For Non-Owner
Owner is a member in good standing Unit Owner is a member in good standing
Filled out Job Hazard Analysis (see table at the back page) Filled out Job Hazard Analysis (see table at the back page)
For Tenant - Letter of Authorization from the Owner
For Authorized Representative – Special Power of Attorney
WORK DESCRIPTION
Type of Work Details of the Work:
Carpentry Electrical Painting and installation of cabinets
Plumbing Painting
Mechanical Layout
Start Date End Date Total Days
Work Duration
12/03/24 12/19/24 15 days
(Must not be more than 7 days)
CONTRACTOR DETAILS
Company Name: Address: Office Number:
JB Modular Cabinet
Contact Person: Contact Number: Email Address:
Jonel L. Barbo 09518464478 [email protected]
MANPOWER & TOOLS DETAILS
Manpower Tools & Equipment
Worker’s Name Position Particular/Description Quantity
John Lowrens Alarcio installer Portable drill 2
Ramer Baniel installer Grinder 1
Leonardo Tapiador painter Ladder 1
Randy Competente painter Electrical cord Extension 1
Jeraldine Custodio
Applicant / Date
Signature over Printed Name
VERIFICATION & APPROVAL
Owner is a member in good standing Work described is allowed per Design Guidelines and House Rules
Required attachments are complete No hot work activities involved
Approved by:
SAMPLE FORM:
ACTIVITY:
3. Works shall not be allowed to proceed if the required one (1) unit of 20-lb ABC fire
extinguisher is not at the work site.
4. All works to be done should not cause damage to the building facilities or exceed utility
capacities of the unit and should comply with pertinent government and safety regulations
and shall be in accordance with the House Rules and Design & Construction Guidelines.
5. Measures should be put in place to minimize spread of odor/mists to adjacent units and
hallways when painting. The Property Management has the right to confiscate the
materials and equipment which are used for painting or spraying.
6. Work stoppage shall be implemented if work being done is affecting adjacent units or
common areas.
7. If the owner/workers continue to defy work stoppage or other orders, Property
Management has the right to confiscate materials or equipment to effect the stoppage.
8. Tampering of Work Permit shall automatically render the work permit void.
MANPOWER & TOOLS DETAILS (Continuation from front page)
Manpower Tools & Equipment
Worker’s Name Position Particular/Description Quantity