First Fixed schedule for Kenya

The document outlines the status of completion for various construction activities across different floors, indicating the percentage of work completed for electrical, plumbing, drainage, and HVAC systems. It also details the expected timelines for material availability and civil clearance required for further progress. Additionally, it specifies the expected delivery dates for materials to the site in Kenya.

Uploaded by

md1118111
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
13 views3 pages

First Fixed schedule for Kenya

The document outlines the status of completion for various construction activities across different floors, indicating the percentage of work completed for electrical, plumbing, drainage, and HVAC systems. It also details the expected timelines for material availability and civil clearance required for further progress. Additionally, it specifies the expected delivery dates for materials to the site in Kenya.

Uploaded by

md1118111
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

1

Duration to
Location Status of completion of activity at site by system

complete the

work - First

First Floor Fixed Only ELEC & ELV Plumbing Drainage HVAC

Wall 30 95% 100% 0% N/A

Celling 40 95% 95% 0% 0%

Floor 30 0% N/A 0% N/A

Ground Floor

Wall 30 90% 40% 0% N/A


Celling 70 60% 0% 0% 0%

Floor 30 0% N/A 0% N/A

Basement
Wall 30 0% 0% 0% 0%
Celling 60 0% 0% 0% 0%

Floor 20 0% 0% 0% 0%
2 3 4 5
Work Required By civil to Expected First Fixed Remaining Expected Time
y at site by system
required for
Order to be date of
Material
material to
date of civil placed as per shipment
be ready for
Availabilit
new approved from Qatar
dispatch

FF complete the First Fixed clearance y at Site % shop drawings (3+5) from Qatar
Wall chipping for 10
boxes, wall chipping
inside toiles and coring as
well and supply of
shower mixer , plaster
level , marble finish level ,
wooden frame for
extinguisher and
N/A scaffolding 3/12/2025 90% 3/12/2025 5/21/2025 70
required opening in
65% ATTICK floor 3/15/2025 80% 3/12/2025 5/21/2025 70
Core required for
N/A drainage 3/15/2025 90% 3/12/2025 5/21/2025 70

wooden frame for


extinguisher wall
chipping inside toiles and
coring and shower mixer
and plaster level , marble
finish level ,frame for
N/A electrical panels 4/1/2025 70% 3/12/2025 5/21/2025 70
80% N/A N/A 70% 3/12/2025 5/21/2025 70
Core required for
N/A drainage 3/15/2025 80% 3/12/2025 5/21/2025 70

0% Civil clearance is required 3/15/2025 50% 3/12/2025 5/21/2025 70


0% Civil clearance is required 3/15/2025 50% 3/12/2025 5/21/2025 70
Civil clearance is required
0% 3/15/2025 50% 3/12/2025 5/21/2025 70
6 7 8
Expected Expected Expected date
Time
date of required for
shipment of MEP
delivery to and reaching
the site in
Kenya (4+7) Kenya Clearance (1+6)

7/5/2025 45 8/4/2025

7/5/2025 45 8/14/2025

7/5/2025 45 8/4/2025

7/5/2025 45 8/4/2025
7/5/2025 45 9/13/2025

7/5/2025 45 8/4/2025

7/5/2025 45 8/4/2025
7/5/2025 45 9/3/2025

7/5/2025 45 7/25/2025