First Fixed schedule for Kenya
First Fixed schedule for Kenya
Duration to
Location Status of completion of activity at site by system
complete the
work - First
First Floor Fixed Only ELEC & ELV Plumbing Drainage HVAC
Ground Floor
Basement
Wall 30 0% 0% 0% 0%
Celling 60 0% 0% 0% 0%
Floor 20 0% 0% 0% 0%
2 3 4 5
Work Required By civil to Expected First Fixed Remaining Expected Time
y at site by system
required for
Order to be date of
Material
material to
date of civil placed as per shipment
be ready for
Availabilit
new approved from Qatar
dispatch
FF complete the First Fixed clearance y at Site % shop drawings (3+5) from Qatar
Wall chipping for 10
boxes, wall chipping
inside toiles and coring as
well and supply of
shower mixer , plaster
level , marble finish level ,
wooden frame for
extinguisher and
N/A scaffolding 3/12/2025 90% 3/12/2025 5/21/2025 70
required opening in
65% ATTICK floor 3/15/2025 80% 3/12/2025 5/21/2025 70
Core required for
N/A drainage 3/15/2025 90% 3/12/2025 5/21/2025 70
7/5/2025 45 8/4/2025
7/5/2025 45 8/14/2025
7/5/2025 45 8/4/2025
7/5/2025 45 8/4/2025
7/5/2025 45 9/13/2025
7/5/2025 45 8/4/2025
7/5/2025 45 8/4/2025
7/5/2025 45 9/3/2025
7/5/2025 45 7/25/2025