MEASUREMENT
SUBTOTAL
DIVISION 04 – MASONRY
Unit of
Scope of Work QUANTITY UNIT COST TOTAL COST
Measurement
CHB wall installation (6" Square Meter
and 4") (sq.m)
Masonry mortar and Square Meter
plastering (sq.m)
Reinforced masonry (if Cubic Meter
required) (cu.m)
SUBTOTAL
DIVISION 05 – METALS
Unit of
Scope of Work QUANTITY UNIT COST TOTAL COST
Measurement
Structural steel
Kilogram (kg) or
works (beams,
Metric Ton (MT)
columns)
Steel trusses and Kilogram (kg) or
purlins Linear Meter (lm)
Square Meter
Metal decking
(sq.m)
Stair handrails and
Linear Meter (lm)
guardrails
SUBTOTAL
DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES
Scope of Unit of
QUANTITY UNIT COST TOTAL COST
Work Measurement
Wood framing
Square Meter (sq.m)
and partitions
Cabinetry and Linear Meter (lm)
millwork or Lump Sum (L.S.)
Wooden doors
Per Set
and frames
SUBTOTAL
DIVISION 08 – OPENINGS
Unit of
Scope of Work QUANTITY UNIT COST TOTAL COST
Measurement
Installation of doors (wood,
Per Set
metal, glass)
Square Meter
Windows installation
(sq.m)
Square Meter
Glazing and glass partitions
(sq.m)
SUBTOTAL
DIVISION 09 – FINISHES
Unit of
Scope of Work QUANTITY UNIT COST TOTAL COST
Measurement
Square Meter
Floor tiles and finishes
(sq.m)
Ceiling finishes (gypsum Square Meter
board, acoustic) (sq.m)
Square Meter
Painting and wall finishing
(sq.m)
SUBTOTAL
DIVISION 10 – SPECIALTIES
Unit of
Scope of Work QUANTITY UNIT COST TOTAL COST
Measurement
Toilet partitions Per Set
Fire extinguisher
Per Unit
cabinets
Signage and Per Square Meter
directories (sq.m)
SUBTOTAL
DIVISION 22 – PLUMBING
Unit of
Scope of Work QUANTITY UNIT COST TOTAL COST
Measurement
Linear Meter
Water supply piping
(lm)
Linear Meter
Drainage piping
(lm)
Plumbing fixtures (toilets,
Per Unit
sinks, urinals)
Per Lump Sum
Septic tank construction
(L.S.)
SUBTOTAL
DIVISION 26 – ELECTRICAL
Unit of
Scope of Work QUANTITY UNIT COST TOTAL COST
Measurement
Power distribution panels Per Unit
Lighting fixtures Per Unit
Electrical wiring and conduit Linear Meter
installation (lm)
SUBTOTAL
DIVISION 32 – EXTERIOR IMPROVEMENTS
Unit of
Scope of Work QUANTITY UNIT COST TOTAL COST
Measurement
Paving (concrete, Square Meter
asphalt) (sq.m)
Landscaping Lump Sum (L.S.)
Perimeter fencing Linear Meter (lm)
SUBTOTAL
TOTAL COST =
12% TAX =
TOTAL COST + 12% TAX =
NOTES:
The units of measurement depend on local building standards and project specifications.
Additional details may be included depending on the specific scope and requirements of the
project.
CSI MASTERFORMAT SAMPLE DETAILED SCOPE OF WORKS WITH UNITS OF
MEASUREMENT AND DESCRIPTION OF EACH SCOPPE OF WORK
Unit of
Scope of Work Description
Measurement
Includes transportation of equipment, personnel, and
Mobilization and
Lump Sum (L.S.) materials to and from the site, site establishment, and
demobilization
dismantling of temporary structures.
Site preparation and Removal of vegetation, debris, and obstructions;
Square Meter (sq.m)
clearing grading and leveling as required.
Temporary facilities
Setup of contractor's field office, worker
(barracks, office, Lump Sum (L.S.)
accommodations, storage for materials and tools.
storage)
Safety, health, and
Lump Sum (L.S.) or Compliance with local safety regulations, provision of
environmental
Monthly (mo.) PPE, first aid stations, waste disposal measures.
protection
Submission and processing of permits, compliance with
Project documentation
Lump Sum (L.S.) government regulations, and documentation of
and permits
construction progress.
Final site clean-up, submission of as-built plans, testing
Project closeout and
Lump Sum (L.S.) and commissioning, and handover of completed
turnover
structure.
DIVISION 03 – CONCRETE
DIVISION 04 – MASONRY
Unit of
Scope of Work Description
Measurement
CHB wall installation (6" and Laying of concrete hollow blocks with mortar
Square Meter (sq.m)
4") joints.
Masonry mortar and Application of mortar and plaster to smoothen
Square Meter (sq.m)
plastering surfaces.
Reinforced masonry (if Use of steel reinforcement for added structural
Cubic Meter (cu.m)
required) integrity.
DIVISION 05 – METALS
Unit of
Scope of Work Description
Measurement
Waterproofing Application of waterproof coatings for basements, roofs,
Square Meter (sq.m)
membrane and wet areas.
Roof insulation Square Meter (sq.m) Installation of thermal insulation to reduce heat transfer.
Sealants and caulking Linear Meter (lm) Application of joint sealants to prevent water infiltration.