0% found this document useful (0 votes)
20 views

Lecture-04-CSI-MasterFormat-Sample-Scope-of-Work-for-a-2-3-storey-commercial-builidng

The document outlines a detailed scope of works for a construction project, organized by divisions in accordance with the CSI MasterFormat. Each division includes specific tasks, units of measurement, and descriptions of the work involved, covering aspects from general requirements to specialized systems like plumbing and electrical. It serves as a comprehensive guide for project planning, cost estimation, and execution.

Uploaded by

Charmaine Pamesa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
20 views

Lecture-04-CSI-MasterFormat-Sample-Scope-of-Work-for-a-2-3-storey-commercial-builidng

The document outlines a detailed scope of works for a construction project, organized by divisions in accordance with the CSI MasterFormat. Each division includes specific tasks, units of measurement, and descriptions of the work involved, covering aspects from general requirements to specialized systems like plumbing and electrical. It serves as a comprehensive guide for project planning, cost estimation, and execution.

Uploaded by

Charmaine Pamesa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

SAMPLE CSI MASTERFORMAT DETAILED SCOPE OF WORKS WITH UNITS OF

MEASUREMENT

Project Title: [Insert Project Name]


Project Location: [Insert Project Location]
Owner: [Insert Owner Name]
General Contractor: [Insert Contractor Name]
Project Duration: [Insert Duration]

DIVISION 01 – GENERAL REQUIREMENTS


Unit of
Scope of Work QUANTITY UNIT COST TOTAL COST
Measurement
Mobilization and
Lump Sum (L.S.)
demobilization
Site preparation Square Meter
and clearing (sq.m)
Temporary
facilities (barracks, Lump Sum (L.S.)
office, storage)
Safety, health, and
Lump Sum (L.S.)
environmental
or Monthly (mo.)
protection
Project
documentation and Lump Sum (L.S.)
permits
Project closeout
Lump Sum (L.S.)
and turnover

SUBTOTAL

DIVISION 02 – EXISTING CONDITIONS


Unit of
Scope of Work QUANTITY UNIT COST TOTAL COST
Measurement
Site clearing Square Meter
and grubbing (sq.m)
Excavation
(depths Cubic Meter (cu.m)
specified)
Backfilling and
Cubic Meter (cu.m)
compaction
Demolition of
Lump Sum (L.S.) or
existing
Cubic Meter (cu.m)
structures
Soil testing and
Per Test
analysis
SUBTOTAL
DIVISION 03 – CONCRETE
Unit of
Scope of Work QUANTITY UNIT COST TOTAL COST
Measurement
Concrete pouring for
Cubic Meter
footings, slabs, beams,
(cu.m)
and columns
Reinforcement bars Kilogram (kg) or
installation Metric Ton (MT)
Formworks and Square Meter
scaffolding (sq.m)
Concrete curing and Square Meter
finishing (sq.m)
Lump Sum (L.S.)
Concrete stairs and
or Square Meter
ramps
(sq.m)
SUBTOTAL

DIVISION 04 – MASONRY
Unit of
Scope of Work QUANTITY UNIT COST TOTAL COST
Measurement
CHB wall installation (6" Square Meter
and 4") (sq.m)
Masonry mortar and Square Meter
plastering (sq.m)
Reinforced masonry (if Cubic Meter
required) (cu.m)
SUBTOTAL

DIVISION 05 – METALS
Unit of
Scope of Work QUANTITY UNIT COST TOTAL COST
Measurement
Structural steel
Kilogram (kg) or
works (beams,
Metric Ton (MT)
columns)
Steel trusses and Kilogram (kg) or
purlins Linear Meter (lm)
Square Meter
Metal decking
(sq.m)
Stair handrails and
Linear Meter (lm)
guardrails
SUBTOTAL
DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES
Scope of Unit of
QUANTITY UNIT COST TOTAL COST
Work Measurement
Wood framing
Square Meter (sq.m)
and partitions
Cabinetry and Linear Meter (lm)
millwork or Lump Sum (L.S.)
Wooden doors
Per Set
and frames
SUBTOTAL

DIVISION 07 – THERMAL AND MOISTURE PROTECTION


Unit of
Scope of Work QUANTITY UNIT COST TOTAL COST
Measurement
Waterproofing Square Meter
membrane (sq.m)
Square Meter
Roof insulation
(sq.m)
Sealants and
Linear Meter (lm)
caulking
SUBTOTAL

DIVISION 08 – OPENINGS
Unit of
Scope of Work QUANTITY UNIT COST TOTAL COST
Measurement
Installation of doors (wood,
Per Set
metal, glass)
Square Meter
Windows installation
(sq.m)
Square Meter
Glazing and glass partitions
(sq.m)
SUBTOTAL

DIVISION 09 – FINISHES
Unit of
Scope of Work QUANTITY UNIT COST TOTAL COST
Measurement
Square Meter
Floor tiles and finishes
(sq.m)
Ceiling finishes (gypsum Square Meter
board, acoustic) (sq.m)
Square Meter
Painting and wall finishing
(sq.m)
SUBTOTAL
DIVISION 10 – SPECIALTIES
Unit of
Scope of Work QUANTITY UNIT COST TOTAL COST
Measurement
Toilet partitions Per Set
Fire extinguisher
Per Unit
cabinets
Signage and Per Square Meter
directories (sq.m)
SUBTOTAL

DIVISION 21 – FIRE SUPPRESSION


Unit of
Scope of Work QUANTITY UNIT COST TOTAL COST
Measurement
Fire sprinkler
Per Head
installation
Fire extinguishers and
Per Unit
cabinets
Fire hose cabinets Per Unit
SUBTOTAL

DIVISION 22 – PLUMBING
Unit of
Scope of Work QUANTITY UNIT COST TOTAL COST
Measurement
Linear Meter
Water supply piping
(lm)
Linear Meter
Drainage piping
(lm)
Plumbing fixtures (toilets,
Per Unit
sinks, urinals)
Per Lump Sum
Septic tank construction
(L.S.)
SUBTOTAL

DIVISION 26 – ELECTRICAL
Unit of
Scope of Work QUANTITY UNIT COST TOTAL COST
Measurement
Power distribution panels Per Unit
Lighting fixtures Per Unit
Electrical wiring and conduit Linear Meter
installation (lm)
SUBTOTAL
DIVISION 32 – EXTERIOR IMPROVEMENTS
Unit of
Scope of Work QUANTITY UNIT COST TOTAL COST
Measurement
Paving (concrete, Square Meter
asphalt) (sq.m)
Landscaping Lump Sum (L.S.)
Perimeter fencing Linear Meter (lm)
SUBTOTAL

TOTAL COST =
12% TAX =
TOTAL COST + 12% TAX =

NOTES:
 The units of measurement depend on local building standards and project specifications.
 Additional details may be included depending on the specific scope and requirements of the
project.
CSI MASTERFORMAT SAMPLE DETAILED SCOPE OF WORKS WITH UNITS OF
MEASUREMENT AND DESCRIPTION OF EACH SCOPPE OF WORK

Project Title: [Insert Project Name]


Project Location: [Insert Project Location]
Owner: [Insert Owner Name]
General Contractor: [Insert Contractor Name]
Project Duration: [Insert Duration]

DIVISION 01 – GENERAL REQUIREMENTS

Unit of
Scope of Work Description
Measurement
Includes transportation of equipment, personnel, and
Mobilization and
Lump Sum (L.S.) materials to and from the site, site establishment, and
demobilization
dismantling of temporary structures.
Site preparation and Removal of vegetation, debris, and obstructions;
Square Meter (sq.m)
clearing grading and leveling as required.
Temporary facilities
Setup of contractor's field office, worker
(barracks, office, Lump Sum (L.S.)
accommodations, storage for materials and tools.
storage)
Safety, health, and
Lump Sum (L.S.) or Compliance with local safety regulations, provision of
environmental
Monthly (mo.) PPE, first aid stations, waste disposal measures.
protection
Submission and processing of permits, compliance with
Project documentation
Lump Sum (L.S.) government regulations, and documentation of
and permits
construction progress.
Final site clean-up, submission of as-built plans, testing
Project closeout and
Lump Sum (L.S.) and commissioning, and handover of completed
turnover
structure.

DIVISION 02 – EXISTING CONDITIONS

Scope of Work Unit of Measurement Description


Site clearing and Removal of trees, bushes, rocks, and debris to
Square Meter (sq.m)
grubbing prepare site for construction.
Excavation (depths Digging for footings, foundations, and utility
Cubic Meter (cu.m)
specified) trenches to specified depths.
Backfilling and Filling excavated areas with approved materials
Cubic Meter (cu.m)
compaction and compacting to required density.
Demolition of existing Lump Sum (L.S.) or Cubic Dismantling and removal of old buildings,
structures Meter (cu.m) foundations, or other obstructions.
Soil testing and Conducting laboratory tests to assess soil bearing
Per Test
analysis capacity and composition.

DIVISION 03 – CONCRETE

Scope of Work Unit of Measurement Description


Concrete pouring for footings, Mixing, pouring, and curing concrete for
Cubic Meter (cu.m)
slabs, beams, and columns structural components.
Kilogram (kg) or Metric Placement of rebar per structural design
Reinforcement bars installation
Ton (MT) specifications.
Erection of temporary molds for concrete
Formworks and scaffolding Square Meter (sq.m)
elements and scaffolding for work at
Scope of Work Unit of Measurement Description
heights.
Application of curing compounds, finishing
Concrete curing and finishing Square Meter (sq.m)
techniques like troweling and polishing.
Lump Sum (L.S.) or Construction of staircases and ramps
Concrete stairs and ramps
Square Meter (sq.m) according to design specifications.

DIVISION 04 – MASONRY

Unit of
Scope of Work Description
Measurement
CHB wall installation (6" and Laying of concrete hollow blocks with mortar
Square Meter (sq.m)
4") joints.
Masonry mortar and Application of mortar and plaster to smoothen
Square Meter (sq.m)
plastering surfaces.
Reinforced masonry (if Use of steel reinforcement for added structural
Cubic Meter (cu.m)
required) integrity.

DIVISION 05 – METALS

Scope of Work Unit of Measurement Description


Structural steel works Kilogram (kg) or Metric Fabrication, welding, and installation of steel
(beams, columns) Ton (MT) components.
Kilogram (kg) or Linear Assembly and erection of roof framing
Steel trusses and purlins
Meter (lm) members.
Installation of metal sheets for flooring and
Metal decking Square Meter (sq.m)
roofing systems.
Stair handrails and Fabrication and installation of metal railings
Linear Meter (lm)
guardrails for stairs and walkways.

DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES

Scope of Work Unit of Measurement Description


Wood framing and Installation of wooden studs and framework for
Square Meter (sq.m)
partitions walls and ceilings.
Cabinetry and Linear Meter (lm) or Lump Fabrication and installation of wooden cabinets,
millwork Sum (L.S.) shelves, and trim.
Wooden doors and Installation of wooden doors with associated
Per Set
frames frames and hardware.

DIVISION 07 – THERMAL AND MOISTURE PROTECTION

Unit of
Scope of Work Description
Measurement
Waterproofing Application of waterproof coatings for basements, roofs,
Square Meter (sq.m)
membrane and wet areas.
Roof insulation Square Meter (sq.m) Installation of thermal insulation to reduce heat transfer.
Sealants and caulking Linear Meter (lm) Application of joint sealants to prevent water infiltration.