The document details the structural calculations for the Genset and Water Tank Platform associated with the AMK2 & AMK3 project, referencing job number Sg001(141). It includes multiple sheets with calculations verified and approved by YYC, dated March 28, 2025. The calculations involve bending moment diagrams and strength factors, utilizing Tekla Structural Designer version 24.4.0.70.

Uploaded by

y2chong
Copyright
© © All Rights Reserved
Available Formats
Download as RTF, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
7 views

Concrete column design

The document details the structural calculations for the Genset and Water Tank Platform associated with the AMK2 & AMK3 project, referencing job number Sg001(141). It includes multiple sheets with calculations verified and approved by YYC, dated March 28, 2025. The calculations involve bending moment diagrams and strength factors, utilizing Tekla Structural Designer version 24.4.0.70.

Uploaded by

y2chong
Copyright
© © All Rights Reserved
Available Formats
Download as RTF, PDF, TXT or read online on Scribd
You are on page 1/ 35

Project Job Ref.

AMK2 & AMK 3 Sg001(141)


Structure Sheet no.
Genset & Water Tank Platform Page 1/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 1/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 1/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 1/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 1/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 1/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 1/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 1/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 1/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 1/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025

C7
Bending Moment Diagram, First-order linear, Strength Factors
Major

Tekla Structural Designer, version: 24.4.0.70


Tekla Structural Designer, version: 24.4.0.70
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 2/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 2/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 2/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 2/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 2/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 2/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 2/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 2/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 2/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Envelope: 1 DA1LC1, Major Moment
Project for Job Ref.
AMK2 & AMK 3 Sg001(141)
C7 Structure Sheet no.
Genset & Water Tank Platform Page 2/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025

Tekla Structural Designer, version: 24.4.0.70


Tekla Structural Designer, version: 24.4.0.70
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 3/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 3/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 3/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 3/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 3/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 3/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 3/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 3/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 3/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 3/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025

Minor

Tekla Structural Designer, version: 24.4.0.70


Tekla Structural Designer, version: 24.4.0.70
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 4/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 4/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 4/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 4/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 4/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 4/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 4/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 4/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 4/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Envelope: 1 DA1LC1, Minor Moment
Project for Job Ref.
AMK2 & AMK 3 Sg001(141)
C7 Structure Sheet no.
Genset & Water Tank Platform Page 4/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025

Tekla Structural Designer, version: 24.4.0.70


Tekla Structural Designer, version: 24.4.0.70
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 5/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 5/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 5/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 5/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 5/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 5/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 5/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 5/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 5/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 5/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025

Shear Force Diagram, First-order linear, Strength Factors


Major

Tekla Structural Designer, version: 24.4.0.70


Tekla Structural Designer, version: 24.4.0.70
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 6/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 6/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 6/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 6/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 6/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 6/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 6/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 6/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 6/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Envelope: 1 DA1LC1, Major ShearProject
for C7 Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 6/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025

Tekla Structural Designer, version: 24.4.0.70


Tekla Structural Designer, version: 24.4.0.70
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 7/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 7/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 7/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 7/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 7/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 7/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 7/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 7/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 7/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 7/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025

Minor

Tekla Structural Designer, version: 24.4.0.70


Tekla Structural Designer, version: 24.4.0.70
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 8/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 8/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 8/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 8/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 8/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 8/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 8/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 8/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 8/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Envelope: 1 DA1LC1, Minor ShearProject
for C7 Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 8/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025

Tekla Structural Designer, version: 24.4.0.70


Tekla Structural Designer, version: 24.4.0.70
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 9/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 9/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 9/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 9/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 9/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 9/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 9/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 9/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 9/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 9/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025

Axial Force Diagram, First-order linear, Strength Factors

Tekla Structural Designer, version: 24.4.0.70


Tekla Structural Designer, version: 24.4.0.70
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 10/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 10/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 10/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 10/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 10/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 10/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 10/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 10/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 10/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Envelope: 1 DA1LC1, Axial ForceProject
for C7 Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 10/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025

Tekla Structural Designer, version: 24.4.0.70


Tekla Structural Designer, version: 24.4.0.70
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 11/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 11/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 11/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 11/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 11/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 11/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 11/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 11/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 11/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 11/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025

Static Design Summary


Longitudinal Bars Summary
Stack Section Longitudinal Bars Analysis Combination Critical position Ratio Status
4 850 Dia 10T20 FE Chase Down 4 Top 0.792
Pass
3 850 Dia 10T20 3D Building Analysis 4 Top 0.295
Pass
2 850 Dia 10T20 3D Building Analysis 4 Bottom 0.314
Pass
1 850 Dia 10T20 3D Building Analysis 4 Top 0.415
Pass

Links Summary
Stack Section Top support links Span links Bottom support links Analysis Combination Ratio Status
Tekla Structural Designer, version: 24.4.0.70
Tekla Structural Designer, version: 24.4.0.70
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 12/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 12/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 12/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 12/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 12/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 12/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 12/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 12/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 12/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 12/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
4 850 Dia - 1T8-225 - 3D Building Analysis 4 0.838
Pass
3 850 Dia - 1T8-225 - 3D Building Analysis 39 0.069
Pass
2 850 Dia - 1T8-225 - 3D Building Analysis 37 0.037
Pass
1 850 Dia - 1T8-225 - FE Chase Down 5 0.045
Pass

Regional code: Singapore (Eurocode), design code: SS EN 1992-1-1 + Singapore NA (2004)


Static Design Calculations
Stack 4 850 Dia - Critical
Longitudinal Bars - Critical
FE Chase Down - Critical
4 STR1.3-1.35G+1.5Q+1.5RQ+MLLA Dir2+ - Critical

Tekla Structural Designer, version: 24.4.0.70


Tekla Structural Designer, version: 24.4.0.70
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 13/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 13/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 13/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 13/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 13/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 13/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 13/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 13/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 13/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 13/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Top - Critical
Axial force NEd = 1363.28 kN
Moment about major axis Mmajor = 579.861 kNm
Moment about minor axis Mminor = -152.813 kNm
Major moment resistance Mmajor,res = Mmajor,res,conc + Mmajor,res,steel = 731.752 kNm
Minor moment resistance Mminor,res = Mminor,res,conc + Mminor,res,steel = -193.325 kNm
Moment resistance ratio Mmajor2 + Mminor2 / Mmajor,res2 + Mminor,res2 = 0.792

Pass

Shear Links - Critical


3D Building Analysis - Critical
4 STR1.3-1.35G+1.5Q+1.5RQ+MLLA Dir2+ - Critical

Tekla Structural Designer, version: 24.4.0.70


Tekla Structural Designer, version: 24.4.0.70
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 14/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 14/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 14/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 14/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 14/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 14/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 14/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 14/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 14/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 14/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Major Load Direction - Critical
Unreinforced shear resistance sufficient

Pass

Stack 3 850 Dia - Critical


Longitudinal Bars - Critical
3D Building Analysis - Critical
4 STR1.3-1.35G+1.5Q+1.5RQ+MLLA Dir2+ - Critical
Top - Critical
Axial force NEd = 2655.39 kN
Moment about major axis Mmajor = 193.213 kNm

Tekla Structural Designer, version: 24.4.0.70


Tekla Structural Designer, version: 24.4.0.70
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 15/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 15/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 15/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 15/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 15/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 15/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 15/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 15/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 15/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 15/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Moment about minor axis Mminor = 158.122 kNm
Major moment resistance Mmajor,res = Mmajor,res,conc + Mmajor,res,steel = 723.620 kNm
Minor moment resistance Mminor,res = Mminor,res,conc + Mminor,res,steel = 590.768 kNm
Moment resistance ratio Mmajor2 + Mminor2 / Mmajor,res2 + Mminor,res2 = 0.267

Pass

Shear Links - Critical


3D Building Analysis - Critical
39 STR8.14-1.35G+1.5ψ0Q+1.5ψ0S+1.5W+EHFDir2+ - Critical
Major Load Direction - Critical
Unreinforced shear resistance sufficient

Tekla Structural Designer, version: 24.4.0.70


Tekla Structural Designer, version: 24.4.0.70
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 16/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 16/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 16/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 16/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 16/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 16/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 16/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 16/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 16/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 16/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025

Pass

Stack 2 850 Dia - Critical


Longitudinal Bars - Critical
3D Building Analysis - Critical
4 STR1.3-1.35G+1.5Q+1.5RQ+MLLA Dir2+ - Critical
Bottom - Critical
Axial force NEd = 2872.80 kN
Moment about major axis Mmajor = -150.066 kNm
Moment about minor axis Mminor = -108.805 kNm
Major moment resistance Mmajor,res = Mmajor,res,conc + Mmajor,res,steel = -771.191 kNm

Tekla Structural Designer, version: 24.4.0.70


Tekla Structural Designer, version: 24.4.0.70
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 17/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 17/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 17/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 17/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 17/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 17/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 17/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 17/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 17/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 17/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Minor moment resistance Mminor,res = Mminor,res,conc + Mminor,res,steel = -559.072 kNm
Moment resistance ratio Mmajor2 + Mminor2 / Mmajor,res2 + Mminor,res2 = 0.195

Pass

Shear Links - Critical


3D Building Analysis - Critical
37 STR8.12-1.35G+1.5ψ0Q+1.5ψ0S+1.5W+EHFDir2+ - Critical
Major Load Direction - Critical
Unreinforced shear resistance sufficient

Pass

Tekla Structural Designer, version: 24.4.0.70


Tekla Structural Designer, version: 24.4.0.70
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 18/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 18/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 18/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 18/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 18/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 18/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 18/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 18/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 18/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 18/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025

Stack 1 850 Dia - Critical


Longitudinal Bars - Critical
3D Building Analysis - Critical
4 STR1.3-1.35G+1.5Q+1.5RQ+MLLA Dir2+ - Critical
Top - Critical
Axial force NEd = 3745.31 kN
Moment about major axis Mmajor = 70.272 kNm
Moment about minor axis Mminor = -107.607 kNm
Major moment resistance Mmajor,res = Mmajor,res,conc + Mmajor,res,steel = 532.975 kNm
Minor moment resistance Mminor,res = Mminor,res,conc + Mminor,res,steel = -817.655 kNm
Moment resistance ratio Mmajor2 + Mminor2 / Mmajor,res2 + Mminor,res2 = 0.132

Pass
Tekla Structural Designer, version: 24.4.0.70
Tekla Structural Designer, version: 24.4.0.70
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 19/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 19/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 19/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 19/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 19/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 19/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 19/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 19/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 19/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 19/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025

Shear Links - Critical


FE Chase Down - Critical
5 STR1.4-1.35G+1.5Q+1.5RQ+MLLA Dir2- - Critical
Major Load Direction - Critical
Unreinforced shear resistance sufficient

Pass

Interaction Diagrams
Static

Tekla Structural Designer, version: 24.4.0.70


Tekla Structural Designer, version: 24.4.0.70
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 20/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 20/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 20/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 20/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 20/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 20/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 20/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 20/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 20/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
N-M Interaction Diagram
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 20/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025

Tekla Structural Designer, version: 24.4.0.70


Tekla Structural Designer, version: 24.4.0.70
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 21/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 21/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 21/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 21/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 21/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 21/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 21/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 21/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 21/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 21/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025

Tekla Structural Designer, version: 24.4.0.70


Tekla Structural Designer, version: 24.4.0.70
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 22/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 22/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 22/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 22/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 22/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 22/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 22/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 22/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 22/35
Calc. by Date Chk'd by Date App'd by Date
M-MYYC
Interaction Diagram
28/3/2025 at N = 1363.28 kN
Ed

4 STR1.3-1.35G+1.5Q+1.5RQ+MLLA Dir2+, FE Chase Down


Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 22/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025

Tekla Structural Designer, version: 24.4.0.70


Tekla Structural Designer, version: 24.4.0.70
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 23/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 23/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 23/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 23/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 23/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 23/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 23/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 23/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 23/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 23/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025

Tekla Structural Designer, version: 24.4.0.70


Tekla Structural Designer, version: 24.4.0.70
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 24/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 24/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 24/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 24/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 24/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 24/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 24/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 24/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 24/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
N-M Interaction Diagram
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 24/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025

Tekla Structural Designer, version: 24.4.0.70


Tekla Structural Designer, version: 24.4.0.70
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 25/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 25/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 25/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 25/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 25/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 25/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 25/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 25/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 25/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 25/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025

Tekla Structural Designer, version: 24.4.0.70


Tekla Structural Designer, version: 24.4.0.70
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 26/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 26/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 26/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 26/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 26/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 26/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 26/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 26/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 26/35
Calc. by Date Chk'd by Date App'd by Date
M-MYYCInteraction Diagram
28/3/2025 at N = 2655.39 kN
Ed

4 STR1.3-1.35G+1.5Q+1.5RQ+MLLA Dir2+, 3D Building Analysis


Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 26/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025

Tekla Structural Designer, version: 24.4.0.70


Tekla Structural Designer, version: 24.4.0.70
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 27/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 27/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 27/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 27/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 27/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 27/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 27/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 27/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 27/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 27/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025

Tekla Structural Designer, version: 24.4.0.70


Tekla Structural Designer, version: 24.4.0.70
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 28/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 28/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 28/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 28/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 28/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 28/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 28/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 28/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 28/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
N-M Interaction Diagram
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 28/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025

Tekla Structural Designer, version: 24.4.0.70


Tekla Structural Designer, version: 24.4.0.70
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 29/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 29/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 29/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 29/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 29/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 29/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 29/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 29/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 29/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 29/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025

Tekla Structural Designer, version: 24.4.0.70


Tekla Structural Designer, version: 24.4.0.70
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 30/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 30/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 30/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 30/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 30/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 30/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 30/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 30/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 30/35
Calc. by Date Chk'd by Date App'd by Date
M-MYYCInteraction Diagram
28/3/2025 at N = 2872.80 kN
Ed

4 STR1.3-1.35G+1.5Q+1.5RQ+MLLA Dir2+, 3D Building Analysis


Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 30/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025

Tekla Structural Designer, version: 24.4.0.70


Tekla Structural Designer, version: 24.4.0.70
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 31/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 31/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 31/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 31/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 31/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 31/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 31/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 31/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 31/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 31/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025

Tekla Structural Designer, version: 24.4.0.70


Tekla Structural Designer, version: 24.4.0.70
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 32/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 32/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 32/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 32/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 32/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 32/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 32/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 32/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 32/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
N-M Interaction Diagram
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 32/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025

Tekla Structural Designer, version: 24.4.0.70


Tekla Structural Designer, version: 24.4.0.70
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 33/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 33/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 33/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 33/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 33/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 33/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 33/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 33/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 33/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 33/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025

Tekla Structural Designer, version: 24.4.0.70


Tekla Structural Designer, version: 24.4.0.70
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 34/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 34/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 34/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 34/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 34/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 34/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 34/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 34/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 34/35
Calc. by Date Chk'd by Date App'd by Date
M-MYYCInteraction Diagram
28/3/2025 at N = 3745.31 kN
Ed

4 STR1.3-1.35G+1.5Q+1.5RQ+MLLA Dir2+, 3D Building Analysis


Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 34/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025

Tekla Structural Designer, version: 24.4.0.70


Tekla Structural Designer, version: 24.4.0.70
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 35/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 35/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 35/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 35/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 35/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 35/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 35/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 35/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 35/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025
Project Job Ref.
AMK2 & AMK 3 Sg001(141)
Structure Sheet no.
Genset & Water Tank Platform Page 35/35
Calc. by Date Chk'd by Date App'd by Date
YYC 28/3/2025

Tekla Structural Designer, version: 24.4.0.70


Tekla Structural Designer, version: 24.4.0.70