This job proposal outlines a complete electrical installation for a duplex building at Hill Station, detailing the scope of work divided into three phases: first fix, second fix, and third/final fix. The total cost of the job is N.Le 550,000, excluding materials, with a structured payment plan based on the completion of work phases. The client is responsible for purchasing all necessary materials, and the proposal is valid for 14 days from submission.

Uploaded by

Alfred Douglas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
5 views6 pages

Job Proposal

This job proposal outlines a complete electrical installation for a duplex building at Hill Station, detailing the scope of work divided into three phases: first fix, second fix, and third/final fix. The total cost of the job is N.Le 550,000, excluding materials, with a structured payment plan based on the completion of work phases. The client is responsible for purchasing all necessary materials, and the proposal is valid for 14 days from submission.

Uploaded by

Alfred Douglas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

Ing.

Alfred Douglas
128D Blackhall Road,
Kissy, Freetown.
+23276212539/+23234457347

Job Proposal

Submitted to: Mrs. Hannah Sesay


(24th Feb, 2025)

Note: This proposal is considered void if not accepted within 14 days


SCOPE OF WORK
To do a complete modern domestic electrical installation on a
complete duplex building situated at Hill Station. Installation to
be done in three phase four wire system according to IEEE and
Local Regulatory Standards.

NATURE OF WORK
The nature of the work is categorized into phases as follows;

First Fix
• Digging of trenches and morticing of concrete walls for
passing of conduit pipes.

• Installation of conduit pipes and trunks for cable routes.

• Installation of plastic boxes for switches, sockets and other


related and required fittings.

• Installing the frames of consumer units in all apartment of the


building, prior to plastering of walls.

Second Fix
• Running of cables to all fittings position; switches, sockets,
and equipment that are required and to be installed.

Third/Final Fix
• Fixing of switches, sockets, light fittings and all other related
fittings as required by the client.
Note that the type of fittings to be installed are determined by
the client.
• Termination of all cables in the consumer units.

• Powering of all consumer units.

• Complete Electrical Testing.

DURATION OF WORK
The timeframe to complete the entire work before handing to the
client is based on the nature of the work as follows;

Activity Who Duration


Digging of trenches for cable routes Laborers 1 week
Morticing of walls for cable routes Laborers 2 weeks
Fixing of conduit pipes and trunks Tech. & Ing. 1 weeks
Fixing of plastic pipes for switches, Tech. & Ing. 1 weeks
sockets.
Installing frames of consumer units. Tech. & Ing. 1 week
Running of cables. Tech. & Ing. 1 weeks
Installation of fittings and testing. Tech. & Ing. 1 weeks

COST OF JOB
The total cost of the job, excluding cost of materials, is N.Le
550,000.
This includes Labor cost, transportation cost and Professional
fee.
MODE OF PAYMENT
Payment can be done according to the duration of work; in cash
or in cheque, as follows;

Work Done Amount


Before or at the start of first fix 20.00%
After the completion of first fix 20.00%
Before or after the completion of second fix 30.00%
After completion of job 30.00%

ESTIMATES
Items Description Qty. Unit Cost Total Cost
Conduit Pipe 3-Quarter -
Conduit Pipe Half-Inch -
Plastic Box 3x3 136
Plastic Box 3x6 120
Consumer 3-ph, 2
Unit
Consumer 3-ph, 6-way 2
Unit
Cable 1.5sq.mm twin+E 25
Cable 2.5sq.mm twin+E 15
Cable 4.0sq.mm twin+E 10
Cable 16.0 sq. mm -
Cable 25.0 sq. mm -
Junction box 200x250mm 12
Switches Single Gang -
Switches Double Gang -
Switches Four Gang -
Sockets Double -
Heater Switch - -
Cooker Units - -

NOTES:
Estimates are prone to errors and can NEVER be 100% correct. Therefore it is advisable that
the purchase of materials be done in parts.

PURCHASE OF MATERIALS
The client is responsible to purchase and provide ALL materials
needed for the job. Except otherwise as agreed by the client.