Alfred Douglas
128D Blackhall Road,
Kissy, Freetown.
+23276212539/+23234457347
Job Proposal
NATURE OF WORK
The nature of the work is categorized into phases as follows;
First Fix
• Digging of trenches and morticing of concrete walls for
passing of conduit pipes.
Second Fix
• Running of cables to all fittings position; switches, sockets,
and equipment that are required and to be installed.
Third/Final Fix
• Fixing of switches, sockets, light fittings and all other related
fittings as required by the client.
Note that the type of fittings to be installed are determined by
the client.
• Termination of all cables in the consumer units.
DURATION OF WORK
The timeframe to complete the entire work before handing to the
client is based on the nature of the work as follows;
COST OF JOB
The total cost of the job, excluding cost of materials, is N.Le
550,000.
This includes Labor cost, transportation cost and Professional
fee.
MODE OF PAYMENT
Payment can be done according to the duration of work; in cash
or in cheque, as follows;
ESTIMATES
Items Description Qty. Unit Cost Total Cost
Conduit Pipe 3-Quarter -
Conduit Pipe Half-Inch -
Plastic Box 3x3 136
Plastic Box 3x6 120
Consumer 3-ph, 2
Unit
Consumer 3-ph, 6-way 2
Unit
Cable 1.5sq.mm twin+E 25
Cable 2.5sq.mm twin+E 15
Cable 4.0sq.mm twin+E 10
Cable 16.0 sq. mm -
Cable 25.0 sq. mm -
Junction box 200x250mm 12
Switches Single Gang -
Switches Double Gang -
Switches Four Gang -
Sockets Double -
Heater Switch - -
Cooker Units - -
NOTES:
Estimates are prone to errors and can NEVER be 100% correct. Therefore it is advisable that
the purchase of materials be done in parts.
PURCHASE OF MATERIALS
The client is responsible to purchase and provide ALL materials
needed for the job. Except otherwise as agreed by the client.
Approved By ........................
Sign ......................................
Date.......................................