0% found this document useful (0 votes)
17 views1 page

MRL Home Elevator Wire Rope Traction 400KG-05Four Panels Centre Opening

The document outlines technical requirements for an MRL home elevator, including specifications for hoistway dimensions, door types, and load capacities. It details construction responsibilities for the owner and construction party, such as waterproofing, electrical work, and ensuring compliance with building ordinances. Additionally, it includes diagrams and measurements for various components of the elevator system.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views1 page

MRL Home Elevator Wire Rope Traction 400KG-05Four Panels Centre Opening

The document outlines technical requirements for an MRL home elevator, including specifications for hoistway dimensions, door types, and load capacities. It details construction responsibilities for the owner and construction party, such as waterproofing, electrical work, and ensuring compliance with building ordinances. Additionally, it includes diagrams and measurements for various components of the elevator system.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

D C B A

MRL Home elevator Wire rope traction NOTE Technical Requirement

re
Control cabinet size HW HOISTWAY WIDTH CW CAR INSIDE WIDTH type TJJ 400 / 0.4
Hoistway Structure Four Panels
HD HOISTWAY DEPTH CD CAR INSIDE DEPTH F/P/D / / Door type Centre Opening
Concrete Brick & Concrete Other

n
OP DOOR OPENING WIDTH CH CAR HEIGHT load 400 kg Speed 0.4 m/s
Schematic diagram of hook

P
ROP WALL OPENING WIDTH OH OVERHEAD HEIGHT Machine Roping 2:1
OPH DOOR OPENING HEIGHT T/sheave ∅ 200 D/sheave ∅

io
Controller
CAR DBG DISTANCE BETWEEN CAR GUIDE RAILS car sheave ∅ 200 CW sheave ∅ 320
1

1
CWT DBG DISTANCE BETWEEN COUNTERWEIGHT GUIDE RAILS Shaft HW 1350 mm x HD 1500 mm

JI
Cabin CW 950 mm x CD 950 mm

is
Door OP 800 mm x OPH 2000 mm

400
Speed 0.4 (m/s)

FU
700
Power 1.9 (KW)
675 675

ec
575 320 OH ≥3300 (mm)
The hook Pit ≥300 (mm)
The hook(15kn,indicate on the hook)

≥350
current
Door beam Left and right load beam Note:Can't break into the elevator shaft
380V 3phase 5wire,50Hz,fluctuation ±7%
325
500

Support Force (N)

Pr
Lop hole

OH ≥3300

300
100 R1 R2 R3 R4 P1 P2 P3 P4

400
665

(See table)
210 200

200
R1 R1

700
28800 17200 45000 34000
HD=1500
195 365

on
Net height=2100

200
wall

wall

P
800
295

OPH=2000
The work that the owner and the
350
655

JI construction party should complete

Shaft

Shaft
2

2
R2 R2

Thickness≤50
1.The constrution and waterproofing

1300

JI
si
of pit about the shaft and machine
175

CH=2200(Ceiling net height2050)


FU

OH ≥3300
room;
HW=1350
2.The dynamic power from the

FU
Finished floor receving box,piping of lighting

ci
earth line project and including
Overhead plan OP=800 the main switch;
175 ROP=1000 175 3.Reserved hole about each exists

e
HW=1350 and machine room floor;
4.The filling and whitewash project

Pr
E direction Doorway schematic after finishing theinstallation
on

about elevators door frane;

Hoistway Liight Per≤7000


Facing Hoistway Finished floor 5.Machine room

CAR&CWT.RAIL BRACKET SPACING≤2000

on
door,ventilation,lighting and the
base station remaining stations
cinder and concreate on the floor
Bottom box Lop 100 Wx500 H 100 Wx400 H after finishing the construction;
3

3
JI
si

No bottom box ∅50 hole 6.Piping and wring about the


emergency call from machine room to

si
675 675
management room;
FU
675 675
ci

WT DBG=680
lighting 160 160
Others:

ci
In accrodance with the provising og
180

180

the building ordinance,it is not


re

Rise=H
170

allowed to arrange water


OH ≥3300 pipe,electricity pipe, wind pipe in

e
P2
665

665

2-200×200
Rise H the shaft that are inprespective
HD=1500

HD=1500

with the elevator.


CD=950

CAR DBG=1070

Pr
n

E
P1 5F
525
655

655

4F
io

3F
30

2F
4

4
130

78 OP=800 78
JI 1F
is

200 CW=950 200 HW=1350 Finished floor -1F Drawing Approver


HW=1350 FT-J 400 -05-
Pit Depth

-2F Drawing No.


FU ≥300

50
-3F Manufacturing no.

300
ec

Hoistway plan Pit ≥300 Project name


Pit plan
FUJI PRECISION
D C B A

You might also like