TI Checklist_V5_QOS sites

The document is a comprehensive checklist for the installation of IP RAN, BTS, and Microwave systems, detailing mandatory requirements and guidelines for each component. It includes sections on installation, cabling, power connectivity, and hardware testing, ensuring compliance with design specifications and standards. Each section requires verification of specific criteria to ensure proper implementation and functionality of the systems.

Uploaded by

Subas Shrestha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views

TI Checklist_V5_QOS sites

The document is a comprehensive checklist for the installation of IP RAN, BTS, and Microwave systems, detailing mandatory requirements and guidelines for each component. It includes sections on installation, cabling, power connectivity, and hardware testing, ensuring compliance with design specifications and standards. Each section requires verification of specific criteria to ensure proper implementation and functionality of the systems.

Uploaded by

Subas Shrestha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

IP RAN installation Primary Check List

Site ID:

Site Name:

Site Type:

Date of Check:

IMPLEMENTATION IP
S.N.
RAN Devices
Mandatory IMPLEMENTATION IP RAN Devices Implementation OK NOT OK N/A Reference(Guideline) REMARKS

1 Installation Installation Implementation 1.2.3.1&1.2.3.2 Pg-82


2 Installation M The chassis is fixed and meet the layout design Implementation
3 Installation M IP RAN device is properly grounded Implementation
4 Installation M The cabling trough is installed correctly. Implementation

5 Installation The Site ID Lable is present in the Chassis Implementation

6 Installation M The Node Name Lable is present on the device Implementation


7 Installation M The Loopback IP Lable is present on the device Implementation
8 Installation Local Access port should be deinfed (ie, MW access) Implementation NOC dependent

9 Cabling Cabling Implementation 1.2.3.3&1.2.3.4 Pg-82


10 Cabling M The installation of cables complies with the design. Implementation

11 Cabling Implementation
The cables are bound well.
12 Cabling M The cables have no obvious damage or break. Implementation
13 Cabling M The redundant Power cable is Labled 1 & 2 Implementation 1 for main and 2 redundant

14 Cabling Implementation
The Grounding cable is Labled

15 Implementation
Cabling M The LAN cable is Labled
16 Cabling M The Fiber cable is Labled With Link Direction Implementation
17 Cabling M ODF to ATN patch cord shoulde be Oudoor patch or kept inside spiral for indoor Implementation
18 Power Connectivity Power Connectivity Implementation 1.2.3.1, Pg-82

19 Power Connectivity M Redundant power connectivity is provided to the IP RAN devices Implementation

Power connectivity is done as per the design requirement and connected to critical
20 Power Connectivity M Implementation
LVD
Proper rating of MCB/Air switch/Fuse and specification is used for power
21 Power Connectivity M Implementation Ncell Standard should be followed
connectivity
22 Power Connectivity M Redundant power connectivity is working properly Implementation
Optical Power Will be application as per scope of
23 Optical power should be in range as per threshold defined for different category. Implementation
Confirmation work
Optical Power Will be application as per scope of
24 Error ( CRC-Error) in Optical ports should be clear . Implementation
Confirmation work
REMARKS:

Rollout FLM Ncell


Name/
Position/
Signature/
Signature Date/
BTS installation Primary Check List

Site ID:

Site Name:

Site Type:

Date of Check:

S.N. IMPLEMENTATION BTS Mandatory IMPLEMENTATION BTS Implementation OK NOT OK N/A Reference(Guideline)

1 INSTALLATION INSTALLATION Implementation


The installation location of the equipment shall comply
2 INSTALLATION M Implementation As per TSSR
with the requirements of engineering design document.

INSTALLATION M The racks shall be connected with their bases firmly. Implementation 3.2 Pg. 109
3

Expansion bolts for attaching the cabinet or base


(support) to the ground shall be installed correctly and
4 INSTALLATION securely, and all flat washers, spring washers, bolts and Implementation 3.3 Pg. 110
nuts shall be installed in the correct order, without
reverse installation.

Rack must be installed in suitable location on BTS bed


INSTALLATION M Implementation As per TSSR
5 consiidering future addition of extra cabinet.
6 CABLING CABLE ROUTING AND CONNECTIONS Implementation
The routing of power cables, grounding cables and
CABLING signal cables (LAN, CPRI..)shall comply withper Implementation RO will share approved schematic diagram
7 shcemetnic diagram.
The diameter of power cables and grounding cables
8 CABLING M Implementation As per product specification
shall comply with production design requirements.

The -48V power cable is blue, the power grounding


CABLING M Implementation Telecom standard
cable is black.
9

The AC power cable, DC power cable and grounding


cable shall be laid separately with the signal cable, with
10 CABLING Implementation 4.5.3.C Pg.241
a distance above 30mm or standard clamp supplied
along with equipment.

The power cable and grounding cable shall be single


conductor, without joints midway, and the insulation
CABLING M Implementation 3.5.3 O Pg. 242
layer shall be intact. The redundant part shall be cut off,
and no coiling or repeated bend is allowed.
11
The protective grounding cable of the rack door shall be
12 CABLING connected firmly, and there shall be no part missing, Implementation 3.6 Pg.112
loosening or dropout.

The cables shall be bundled tidily and be either


horizontal or vertical. The cable buckles(Tie) shall be
bundled in moderate strength in consistent direction and
CABLING even interval, and the redundant buckles shall be cut Implementation General standard
and all buckles shall be cut smoothly without bur. The
black tie and white tie cannot be used together.
Generally, the white tie is used indoors.
13
All the holes must be sealed with slica gel or supplied
14 CABLING Implementation 3.23 ii Pg 132
sealing material after cabling.

The cable surface shall be clean without marks, and the


CABLING Implementation General standard
insulating layer of the sheath shall be intact.
15
RRU Power Cable Grounding Shall be done as per
16 CABLING M Implementation 5.4.6 K,L Pg.265
guideline

CPRI and Power cable from Horizantal cable tray end to


cabinet entry point shall be routed by using UV
CABLING M Implementation RO will share approved schematic diagram
protected PVC duct. Power cable and CPRI cable need
to routed from separate duct for each band configuration
17
18 ANTENNA AND FEEDER ANTENNA AND FEEDER Implementation
The actual antenna height shall comply with the network
ANTENNA AND FEEDER M plan, and its installation location shall comply with Implementation TSSR
19 engineering design requirements.

The antenna shall be installed within the lightning


20 ANTENNA AND FEEDER M Implementation 5.2 A Pg. 255
arrester’s protection.

The antenna CPRI cable shall be connected correctly,


ANTENNA AND FEEDER M Implementation CPRI Swap verification
and the sectors shall also be correct.
21
There are no obvious folds or twists of the CPRI
22 ANTENNA AND FEEDER M Implementation General standard
cable.The copper of jumper shall not be exposed.
Adjustmanet of Azimuth, Mechanical/Electrical tilts
RF ANTENNA PARAMETER Implementation
23 of RF ANTENNAS

Azimuth,Electrical and Mechanical tilts adjusted as per


24 RF ANTENNA PARAMETER M Implementation As per TSSR/AAR
plan of Sector A(X).

Azimuth,Electrical and Mechanical tilts adjusted as per


RF ANTENNA PARAMETER M Implementation As per TSSR/AAR
plan of Sector B(Y).
25

Azimuth,Electrical and Mechanical tilts adjusted as per


26 RF ANTENNA PARAMETER M Implementation As per TSSR/AAR
plan of Sector C(Z).

ASSEMBLY,LABEL AND OTHERS ASSEMBLY,LABEL AND OTHERS Implementation


27

The racks shall not be seriously damaged and shall be


28 ASSEMBLY,LABEL AND OTHERS without scratches or paint fall-off. The places where the Implementation 4.1 V Pg. 137
paint has fallen off shall be re-painted in the same color.

The dummy handle bars and dummy panels shall all be


ASSEMBLY,LABEL AND OTHERS Implementation 1.1.5.5 Pg 77
installed.
29
The connectors shall be securely connected, the bolts
fixing the lightning arrester's boards shall all be
30 ASSEMBLY,LABEL AND OTHERS M Implementation General standard
tightened, and the fastening clips shall be in position
and not damaged.

The cabinet doors shall be able to open and close


ASSEMBLY,LABEL AND OTHERS M Implementation 3.4 Pg.111
smoothly.
31
32 ASSEMBLY,LABEL AND OTHERS The rack surface shall be clean. Implementation General standard

33 ASSEMBLY,LABEL AND OTHERS Labelling should be done as per labelling guideline Implementation Labelling guideline
The equipment room shall be clean and orderly, and
34 ASSEMBLY,LABEL AND OTHERS wastes such as packing boxes shall be removed. The Implementation General standard
spare parts shall be placed tidily.
35 HARDWARE TEST RECORD HARDWARE TEST RECORD Implementation
36 BTS BOARD TEST M Implementation
37 BTS BOARD TEST M Implementation
38 BTS BOARD TEST M Implementation
39 BTS BOARD TEST M Implementation
40 BTS BOARD TEST M Implementation
41 SLOT TEST M Implementation
42 SLOT TEST M Implementation
43 SLOT TEST M Implementation
44 SLOT TEST M Implementation
45 SLOT TEST M Implementation

46 Optical mode and fibre TEST(CPRI) M Implementation

47 BTS BOARD TEST M Implementation

REMARKS:

Rollout FLM Ncell


Name/
Position/
Signature/
Signature Date/
Meet by Vendor

REMARKS

if other color supply


than pre-approval
needed

As per AAR if AAR


scope provided other
wise TSSR

As per AAR if AAR


scope provided other
wise TSSR

As per AAR if AAR


scope provided other
wise TSSR

Pre-approval from PM
required if dummy is
not available for
Reuse equipment
installed board
should be mention
in D column and all
Alarm should be
clear while checking
in EMS/U2000
MW installation Primary Check List

Site ID:

Site Name:

Site Type:

Date of Check:

Reference
S.N. IMPLEMENTATION MICROWAVE SYSTEM Mandatory IMPLEMENTATION MICROWAVE SYSTEM Implementation OK NOT OK N/A Remark
(Guideline)
1 CATEGORY DETAILS Implementation
2 Antenna installation M Antenna must be stable and firm. Implementation 4.2.1
The spacing of main antenna and diversity antenna must meet the
3 Antenna installation Implementation 4.2.1
requirements of project design.
The antenna must be installed within the protection range of the
4 Antenna installation M Implementation 4.2.1
lightning rod.
Link ID, Polarization and Azimuth must be mentioned at the
5 Antenna installation M Implementation 4.2.1
backside of antenna.
For 1.2m or higher antenna, the additional supporting rod must be
6 Antenna installation M Implementation 4.2.1
used and properly tighten to protect from the wind.
7 Antenna polarity mode M Verify whether the antenna is single-polarized or dual-polarized. Implementation 4.2.1
Record antenna diameter and frequency, at the same time, verify
whether they meet design requirements or not.
8 Antenna diameter and frequency M Implementation 4.2.1
For dual-polarized antenna, record the frequency of each polarity
direction
Verify the antenna is horizontal-polarized or vertical-polarized in
9 Polarity direction of single-polarized antenna M polarity direction. Implementation 4.2.1
(Do not apply to dual-polarized antenna.)
ODU/ODR installation position complies with project design
10 ODR installation M Implementation 4.2.1
requirements. Take care of polarization direction.

ODU fixing complies with installation requirements. The fasteners


11 ODR installation Implementation 4.2.1
are firm. Also, its placement should be ease for maintenance

Joint point with ODR and cable must have good contact and covered
12 Outdoor Cable Installation M Implementation 4.2.2
gland with water-proofing tapes.
The routing of cables must be tidy without crossover, twist or
13 Outdoor Cable Installation M Implementation 4.2.2
damage. Use a fastener to fasten the lines every 1.2m.
14 Outdoor Cable Installation M Attach labels of "Link ID" to both extremities of cable Implementation 4.2.2
POE/PI must be installed as per supplier design. Cables must be
15 POE/PI Cabinet installation M Implementation 4.6
routed properly
IP address and Link ID details must be sticked in POE/PI in printed
16 POE/PI Cabinet installation M Implementation 4.6
form
POE/PI must be installed in sunshade/mounting bracket/side of rack
17 POE/PI Cabinet installation M Implementation 4.6
with metallic tie/plastic tie.
Outdoor Power & ethernet cable should be grounded and
18 POE/PI Cabinet installation M cut/opening portion should be shiled & taped as per product Implementation Product spec
specification.
Propoer grounding of ODR in tower's busbar and POE/PI in the
19 Checking grounding system M Implementation 4.3
cabinet's busbar with Lugs must be done
The ground wiring in equipment room must meet the requirements of
20 Checking grounding system M Implementation 4.3
project design.
Both work ground and protection ground must use wires of a whole
21 Checking grounding system M piece, yellow-green wires as per supply. Multiple connections are Implementation 4.3
not allowed.
Each ground line from the grounding bus is connected with only one As per Availabilty of
22 Checking grounding system Implementation 4.3
set of equipment. busbar holes
The grounding point must be in good contact without looseness, and
23 Checking grounding system M Implementation 4.3
anti-oxidation measures must be taken.
Proper labeling of link must be attached in cables connected to POE
24 LAN cable connection M Implementation 4.2.2
and IPRAN boxes
The DC power supply is connected to the power terminal on a rack,
25 Power line installation M Implementation 4.5
with the anode and cathode connected correctly.
The copper lugs of power lines must be used & it must be firm and
26 Power line installation Implementation 4.5
upright.
MW and IPRAN system must be connected to BLVD or LLVD
27 Power line installation M Implementation 4.5
system to retain transmission live at lower voltage
MCB rating & specification should be as per installation
28 Power line installation M Product spec
specification & Ncell standard
29 Power line installation M Power lines and signal lines must be separated. Implementation 4.5
IPRAN Cables lines, power lines and cat5 cables
30 Power line installation M Implementation 4.5
are all correctly labeled.
31 Hardware damaged or not M All hardware equipments and modules are in good condition. Implementation 4.1
32 Cables connection M All cables are connected correctly. Implementation 4.1
33 TEST RECORD TEST RECORD Implementation
DC power test with IPRAN device, MW POE with LED glow after
34 Power Supply Test M Implementation 4.7
connection
35 Test operation & maintenance functions Parameter setting function with snaphot to be taken Implementation 4.7
36 Test operation & maintenance functions System monitoring functions Implementation 4.7
37 Test operation & maintenance functions User management function Implementation 4.7
38 Test operation & maintenance functions Log query function Implementation 4.7
39 System performance test M Transmission power test Implementation 4.7
40 System performance test M Receiving signal level performance table/graph Implementation 4.7
41 System performance test M Transmission frequency record Implementation 4.7
42 System performance test M Receiving frequency record Implementation 4.7
43 Local Access test Local login from defined port of ATN Implementation

REMARKS:

Rollout FLM Ncell


Name/
Position/
Signature/
Signature Date/