0% found this document useful (0 votes)
25 views8 pages

MWM TCG 2032 Teknik Deger Karti

The TCG 2032 gas engines from MWM provide high efficiency and performance for various applications worldwide, including energy generation in Bangladesh, Germany, Italy, and China. MWM emphasizes innovation and cost-effectiveness, offering tailored solutions and extensive service support to ensure optimal efficiency and reliability. The technical specifications highlight the engines' capabilities in natural gas and biogas applications, showcasing their efficiency and reduced maintenance costs.

Uploaded by

Amin1234
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
25 views8 pages

MWM TCG 2032 Teknik Deger Karti

The TCG 2032 gas engines from MWM provide high efficiency and performance for various applications worldwide, including energy generation in Bangladesh, Germany, Italy, and China. MWM emphasizes innovation and cost-effectiveness, offering tailored solutions and extensive service support to ensure optimal efficiency and reliability. The technical specifications highlight the engines' capabilities in natural gas and biogas applications, showcasing their efficiency and reduced maintenance costs.

Uploaded by

Amin1234
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

www.mwm.

net

TCG 2032
Efficiency straight down the line.
The TCG 2032. Top performance from
MWM – used successfully worldwide.

Precision Energy, Bangladesh

In 2010, MWM shipped 15 TCG 2032 V16s to


Precision Energy Bangladesh within just three
months. The gas engines produce a constant over-
all output of 60 MWel. All of the electric energy
that has been generated is fed into the public
grid. More information about this project can be
found in our MWM movie “60 MW Around the
World” at www.mwm.net.

AMD Dresden, Germany

MWM engines were chosen for the energy sup-


ply center of the AMD chip factory in Dresden,
since our system generates electricity of supreme
quality. Moreover, the waste heat is used for heat
supply and cold production, thus achieving very
high primary energy utilization.

Italiana Coke, Italy

MWM engines were installed for the environ-


mentally friendly utilization of the coke oven
gas generated at the coke oven plant Italiana
Coke. The electricity rebate, whose amount is
determined by law, gives the operator a secure
income from the sale of the electricity generated
at the plant, in addition to the company’s core
business, the production of metallurgic coke.

CITIC Guan project, China

The TCG 2032 V12 gas engines in Dongtai as


well as the engines of the type TCG 2032 V16
in Xitai produce a total of 18 MWel in electric
energy for the CITIC Guan project for the extrac-
tion of raw materials. Building the two plants at
the salt lake of the Chaidam basin at an altitude
of 3,000 m above sea level presented very special
challenges to the project.
Strong arguments
for a strong brand: MWM.

MWM has more than Short blocks can be delivered and assembled
135 years of experience. easily, so your system will be ready for operation
in no time at all. Another benefit is that our own
MWM has made a tradition out of innovation. training center offers first-rate, practice-oriented
We have been developing and building engines courses for your technicians.
and gensets for a wide range of uses since 1871.
Our global success is founded on having invented MWM thinks in terms
the most advanced gas and diesel engines. Thirty of the complete solution.
years ago we became one of the first manufac-
turers to revolutionize generator technology by Only if all of the components in your system are
using high-performance gas engines. To this day selected and configured perfectly for your needs
we work constantly on making our systems even will you achieve optimum overall efficiency. We
more efficient. have the experience. We have the capacities. Our
engineers can develop tailor-made complete
MWM understands solutions for you. From comprehensive cogenera-
what’s really needed. tion concepts for electricity, heat and cooling, to
specially configured containerized solutions, and
Cost-effectiveness – today that’s all that counts! all the way to turnkey systems – MWM can de-
MWM offers cooperation all along the line, velop complete concepts to suit your needs, and
which pays off right across the process chain. We implement them reliably too. All in all, system
are a complete partner to our customers: from engineering just the way you want it.
the selection of the system layout for the project,
all the way to service and repair. You can rely on MWM.

MWM offers the most Clear statements and transparent offers: we stand
economical service concepts. by our word. We are always there when you need
us. Measure us by that standard – on site, at your
With its worldwide service network, long service plant.
intervals, and low maintenance costs, MWM
Service is an important factor for sustainable
cost-effectiveness. Innovative concepts, such as
remote diagnosis, remote parameter configura-
tion, and the generation of operating values, can
be provided inexpensively anywhere in the world
via the Internet. The new MWM logistics center
ensures fast deliveries and low spare parts costs.
Performance. Reliability. Cost-effectiveness.
For your success.

More profit

The optimized maintenance concept with cylinder


units simplifies accessibility and, along with the
reduction of the number of different parts, minimizes
the time required for maintenance. This saves up to
20 % in service costs. At the same time you profit from
up to 30 % less lubricating oil consumption compared
to other engines.

Longer runtimes

Thanks to the extended service intervals, the


TGC 2032 runs up to 200 hours longer per
annum than comparable products.

Greater reliability

The particle-free combustion with chamber plugs


extends the service intervals for the exhaust gas heat
exchanger and reduces service costs compared to
other combustion methods.

Optimum efficiency

State-of-the-art technologies, such as the optimized


gas mixer and TEM (Total Electronic Management),
ensure efficient operation even with such difficult
gases as mine gas, landfill gas, or sewage gas. This is
also true when the gas composition is fluctuating –
thanks to fast response times due to the temperature
monitoring for each cylinder. TEM not only controls
the engine, but the entire system, including heat
extraction.

Full turbo power

The new high-pressure turbo charger A140 in combi-


nation with optimized gas exchange allows the engine
to run at full power, even under tropical conditions.
Technical data 50 Hz
Engine type TCG 2032 V12 TCG 2032 V16
Bore/stroke mm 260/320 260/320
Displacement dm 3
203,9 271,8
Speed min-1 1000 1000
Mean piston speed m/s 10,7 10,7
Length mm 8100 9300
Width mm 2700 2700
Height mm 3800 3800
Dry weight engine kg 41000 50500

Natural gas applications


NOX ≤ 500 mg/mn3 1) dry exhaust pipes

Engine type TCG 2032 V12 TCG 2032 V16


Electrical power 2) kW 3333 4300
Mean effective pressure bar 20,0 19,4
Thermal output 3) ±8 % kW 3295 4274
Electrical efficiency 4) % 43,5 43,5
Thermal efficiency 4) % 43,0 43,2
Total efficiency 4)
% 86,5 86,7

Biogas applications
NOX ≤ 500 mg/mn3 1) minimum heating value Hu = 5,0 kWh/mn3
Sewage gas (65 % CH4 / 35 % CO2) dry exhaust pipes
Biogas (60 % CH4 / 32 % CO2, rest N2)
Landfill gas (50 % CH4 / 27 % CO2, rest N2)

Engine type TCG 2032 V12 TCG 2032 V16


Electrical power 2) kW 2830 3770
Mean effective pressure bar 17,0 17,0
Thermal output 3) ±8 % kW 2920 3853
Electrical efficiency 4) % 42,3 42,5
Thermal efficiency 4)
% 43,6 43,4
Total efficiency 4) % 85,9 85,9

1) NOX-emissions: NOX ≤ 0,5 g NO2 /mn3 Exhaust gas dry at Data for special gases and dual gas operation on request.
5 % O2.
2) According to ISO 3046/1 at U = 11 kV, cosphi = 1 for 50 Hz The values given on these datasheets are for information
and a minimum methane number of MN 70. purposes only and not binding.
3) Exhaust gas cooled to 120°C with natural gas and to 180°C The information given in the offer is decisive.
with biogas.
4) Valid for a methane number of MN 70.
Technical data 60 Hz
Engine type TCG 2032 V12 TCG 2032 V16
Bore/stroke mm 260/320 260/320
Displacement dm 3
203,9 271,8
Speed min-1 900 900
Mean piston speed m/s 9,6 9,6
Length mm 8000 9400
Width mm 2700 2700
Height mm 3800 3800
Dry weight engine kg 40200 52000

Natural gas applications


NOX ≤ 500 mg/mn3 1) dry exhaust pipes

Engine type TCG 2032 V12 TCG 2032 V16


Electrical power 2) kW 3000 4000
Mean effective pressure bar 18,1 18,1
Thermal output 3) ±8 % kW 2898 3890
Electrical efficiency 4) % 43,6 43,6
Thermal efficiency 4) % 42,1 42,4
Total efficiency 4)
% 85,7 86,0

Biogas applications
NOX ≤ 500 mg/mn3 1) minimum heating value Hu = 5,0 kWh/mn3
Sewage gas (65 % CH4 / 35 % CO2) dry exhaust pipes
Biogas (60 % CH4 / 32 % CO2, rest N2)
Landfill gas (50 % CH4 / 27 % CO2, rest N2)

Engine type TCG 2032 V12 TCG 2032 V16


Electrical power 2) kW 2530 3370
Mean effective pressure bar 17,0 17,0
Thermal output 3) ±8 % kW 2587 3453
Electrical efficiency 4) % 42,2 42,3
Thermal efficiency 4)
% 43,1 43,4
Total efficiency 4) % 85,3 85,7

1) NOX-emissions: NOX ≤ 0,5 g NO2 /mn3 Exhaust gas dry at Data for special gases and dual gas operation on request.
5 % O2.
2) According to ISO 3046/1 at U = 13.8 kV, cosphi = 1 for 50 Hz The values given on these datasheets are for
and a minimum methane number of MN 80. information purposes only and not binding.
3) Exhaust gas cooled to 120°C with natural gas and to 180°C The information given in the offer is decisive.
with biogas.
4) Valid for a methane number of MN 80.
MWM GmbH MWM Austria GmbH MWM of America, Inc.
Carl-Benz-Straße 1 Münchner Straße 22 1750 Breckinridge Parkway
DE-68167 Mannheim AT-6130 Schwaz Suite 500
T +49 621 384-0 T +43 5242 21300 US-Duluth, GA 30096
F +49 621 384-8800 F +43 5242 21300-600 T +1 770 279 6720
[email protected] [email protected] F +1 770 279 6719
[email protected]

MWM Benelux B.V. MWM Energy Hungaria Kft. MWM Canada Inc.
Soerweg 13 Ezred u.1-3 210 Willmott St., Unit 4B
NL-3088 GR Rotterdam HU-1044 Budapest P.O. Box 1120
T +31 10 2992-666 T +43 5242 21300 CA-K9A 4W5 Cobourg, Ontario
F +31 10 2992-677 F +43 5242 21300-600 T +1 905 377 1273
[email protected] [email protected] F +1 905 248 3168
[email protected]

MWM Asia-Pacific Pte. Ltd. MWM France SAS MWM Energy Australia Pty. Ltd.
11 Kian Teck Road 115 Rue du Fossé Blanc 21 McDonalds Lane
SG-628768 Singapore FR-92230 Gennevilliers AU-3170 Mulgrave, Victoria
T +65 6268 5311 T +33 14613 8731 T +61 3 9262-3000
F +65 6266 3039 F +33 14613 8753 F +61 3 9262-3033
info-asia-pacifi[email protected] [email protected] [email protected]

MWM Latin America Soluções MWM (Beijing) Co. Ltd. MWM Energy España S.A.
Energéticas Ltda. CITIC Building Avda de los Artesanos, 50
Avenida Marechal Rondon, 1268 Unit 2-02 ES-28950 Tres Cantos/Madrid
Jardim Chapadão Jianguomenwai Road 19, T +34 91 80745-00
BR-CEP 13070-172 Campinas/SP CN-100004 Beijing, P.R. China F +34 91 80745-47
T +55 11 9271-7561 T +86 10 6528 5116 [email protected]
F +55 11 3094-7820 F +86 10 6528 9316
[email protected] [email protected]
Version 07/10/EN

You might also like