The document lists various infrastructure projects in Region X for the year 2020, detailing the implementing offices, sources of funds, contract IDs, contract names, contractors, contract costs, and project statuses. Most projects are completed, with some ongoing, and involve significant construction efforts such as roads, bridges, and public buildings. The primary contractor for these projects is Jejor's Construction Corporation.

Uploaded by

Jerecho Mandang
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views

DPWHR10 _Status of contracts_IY2020_06172024

The document lists various infrastructure projects in Region X for the year 2020, detailing the implementing offices, sources of funds, contract IDs, contract names, contractors, contract costs, and project statuses. Most projects are completed, with some ongoing, and involve significant construction efforts such as roads, bridges, and public buildings. The primary contractor for these projects is Jejor's Construction Corporation.

Uploaded by

Jerecho Mandang
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 12

Region X

IMPLEMENTING
OFFICE INFRA YEAR SOURSE OF FUNDS CONTRACT ID

Bukidnon 1st District 2020 Regular Infra - GAA 2020 OO- 1 20KA0050
Engineering Office

Bukidnon 1st District 2020 Regular Infra - GAA 2020 OO- 1 20KA0063
Engineering Office

Bukidnon 3rd District 2020 Regular Infra - GAA 2020 LP 20KC0087


Engineering Office

Bukidnon 3rd District 2020 Regular Infra - GAA 2020 LP 20KC0092


Engineering Office

Bukidnon 3rd District 2020 Regular Infra - GAA 2020 LP 20KC0093


Engineering Office

Cagayan de Oro City 2020 Regular Infra - GAA 2020 OO- 2 20KD0010
2nd District Engineering
Office
Cagayan de Oro City 2020 Regular Infra - GAA 2020 OO- 1 20KD0016
2nd District Engineering
Office
Cagayan de Oro City 2020 Regular Infra - GAA 2020 OO- 1 20KD0028
2nd District Engineering
Office
Camiguin District 2020 Regular Infra - GAA 2020 OO- 1 20KE0036
Engineering Office
Camiguin District 2020 Regular Infra - GAA 2020 OO- 1 20KE0047
Engineering Office
Camiguin District 2020 Regular Infra - GAA 2020 LP 20KE0048
Engineering Office

Camiguin District 2020 Regular Infra - GAA 2020 OO- 1 20KE0049


Engineering Office
Camiguin District 2020 Regular Infra - GAA 2020 LP 20KE0064
Engineering Office
Camiguin District 2020 Regular Infra - GAA 2020 LP 20KE0070
Engineering Office
Misamis Oriental 2nd 2020 Regular Infra - GAA 2020 OO- 1 20KL0058
District Engineering
Office

Region X 2020 Regular Infra - GAA 2020 OO- 1 20K00046

Region X 2020 Regular Infra - GAA 2020 20K00047


CSSP

Region X 2020 Regular Infra - GAA 2020 20K00048


CSSP
Region X 2020 Regular Infra - GAA 2020 20K00049
CSSP

Region X 2020 Regular Infra - GAA 2020 LP 20K00085

Region X 2020 Regular Infra - GAA 2020 OO- 1 20K00103

Region X 2020 Regular Infra - GAA 2020 OO- 1 20K00191

Region X 2020 Regular Infra - GAA 2020 OO- 1 20K00192

Region X 2020 Regular Infra - GAA 2020 OO- 1 20K00193

Region X 2020 Regular Infra - GAA 2020 OO- 1 20K00203


Region X 2020 Regular Infra - GAA 2020 LP 20K00231

Region X 2020 Regular Infra - GAA 2020 LP 20K00335

Region X 2020 Regular Infra - GAA 2020 LP 20K00356


CONTRACT COST
CONTRACT NAME CONTRACTOR

CONSTRUCTION OF ROAD SLOPE PROTECTION JEJOR'S CONSTRUCTION 83,746,560.00


STRUCTURE - AT SPECIFIC LOCATIONS ALONG CORPORATION (5143)
KAPALONG-TALAINGOD- VALENCIA (BUKIDNON) RD
(S00641MN) K1539 + 728 - K1540 + 150SAN
FERNANDO, BUKIDNON
WIDENING OF BRIDGE - MAMPILO BR. (B01649MN) JEJOR'S CONSTRUCTION 29,400,000.00
ALONG KAPALONG-TALAINGOD- VALENCIA CORPORATION (5143)
(BUKIDNON) RD, SAN FERNANDO, BUKIDNON

CONSTRUCTION OF MULTI PURPOSE BUILDING FOR JEJOR'S CONSTRUCTION 99,000,000.00


NORTHERN BUKIDNON STATE COLLEGE, SITIO CORPORATION (5143)
KIHARE, BRGY. POBLACION, MANOLO FORTICH,
BUKIDNON
CONSTRUCTION OF FLOOD CONTROL STRUCTURE JEJOR'S CONSTRUCTION 9,900,000.00
ALONG SAGUIARAN RIVER PACKAGE 3, KALILANGAN, CORPORATION (5143)
BUKIDNON
CONSTRUCTION OF FLOOD CONTROL STRUCTURE JEJOR'S CONSTRUCTION 9,900,000.00
ALONG SAGUIARAN RIVER PACKAGE 4, KALILANGAN, CORPORATION (5143)
BUKIDNON
CONST OF CAGAYAN DE ORO DRAINAGE SYSTEM JEJOR'S CONSTRUCTION 37,221,418.89
(CAMAMAN-AN SECTION), CDOC CORPORATION (5143)

RECONSTRUCTION TO CONCRETE PAVEMENT CDO JEJOR'S CONSTRUCTION 19,798,131.01


PORT ROAD K1439+490 - K1440+175 CORPORATION (5143)

WIDENING OF BRIDGE BIGAAN BR 1 (B01470MN) JEJOR'S CONSTRUCTION 49,000,000.00


ALONG BCIR CORPORATION (5143)

WIDENING OF PERMANENT BRIDGES PUTI BRIDGE JEJOR'S CONSTRUCTION 16,283,708.90


(B00018CG) ALONG CCR CORPORATION (5143)
WIDENING OF PERMANENT BRIDGES ALGA BRIDGE JEJOR'S CONSTRUCTION 19,547,667.72
(B00017CG) ALONG CCR CORPORATION (5143)
CONSTRUCTION OF ALTERNATE ROAD & BRIDGE JEJOR'S CONSTRUCTION 4,701,649.09
CONNECTING POBLACION TO BONBON SAGAY CORPORATION (5143)

WIDENING OF BRIDGE AGURAN BRIDGE (B00023CG) JEJOR'S CONSTRUCTION 35,087,571.77


ALONG CCR CORPORATION (5143)
CONSTRUCTION OF CAMIGUIN GYMNASIUM JEJOR'S CONSTRUCTION 155,689,565.78
POBLACION MAMBAJAO CAMIGUIN CORPORATION (5143)
CONSTRUCTION OF CAMPANA-BINUNSARAN BRIDGE JEJOR'S CONSTRUCTION 17,842,093.31
CORPORATION (5143)
WIDENING OF PERMANENT BRIDGES - SOLANA BR. JEJOR'S CONSTRUCTION 91,614,342.58
(B01320MN) ALONG BUTUAN CITY-CAGAYAN DE ORO CORPORATION (5143)
CITY-ILIGAN CITY RD. (PHASE III)

ROAD WIDENING, CAMIGUIN CIRCUMFERENTIAL RD - JEJOR'S CONSTRUCTION 128,291,401.02


K0002+732 - K0002+817, K0002+827 - K0002+927, CORPORATION (5143)
K0004+649
- K0004+850, K0004+918 - K0004+961, K0009+597
- K0009+697, K0009+716 - K0009+812, K0011+848
- K0012+177, K0012+218
- K0012+310, K0013+797 - K0014+358, ...
CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS JEJOR'S CONSTRUCTION 97,699,574.84
LEADING TO DECLARED TOURISM DESTINATIONS, CORPORATION (5143)
CROSS COUNTRY ROAD FROM MAINIT, CATARMAN
TO MAMBAJAO, CAMIGUIN

CONSTRUCTION OF SAGAY MUNICIPAL POLICE JEJOR'S CONSTRUCTION 7,013,553.14


STATION BUILDING, SAGAY, CAMIGUIN CORPORATION (5143)
CONSTRUCTION STANDARD CAMIGUIN PPO JEJOR'S CONSTRUCTION 14,800,324.72
HEADQUARTERS, CAMP ARANAS, MAMBAJAO, CORPORATION (5143)
CAMIGUIN PROVINCE
COMPLETION OF CAGAYAN DE ORO CIVIC/ JEJOR'S CONSTRUCTION 201,027,806.39
CONVENTION CENTER, CAGAYAN DE ORO CITY CORPORATION (5143)

CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, JEJOR'S CONSTRUCTION 137,403,330.57


CLAVERIA - BALINGOAN BY-PASS ROAD, (CLAVERIA CORPORATION (5143)
SECTION), PACKAGE 5, MISAMIS ORIENTAL

CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, JEJOR'S CONSTRUCTION 128,224,204.80


CLAVERIA - BALINGOAN BY-PASS ROAD, (MAPUA - CORPORATION (5143)
DAHILIG SECTION), MISAMIS ORIENTAL

CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, JEJOR'S CONSTRUCTION 128,258,734.61


CLAVERIA - BALINGOAN BY-PASS ROAD, CORPORATION (5143)
(KABANGASAN - MAPUA SECTION), MISAMIS
ORIENTAL
CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, JEJOR'S CONSTRUCTION 100,787,464.42
CLAVERIA - BALINGOAN BY-PASS ROAD, (MAPUA CORPORATION (5143)
SECTION), MISAMIS ORIENTAL
CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, JEJOR'S CONSTRUCTION 137,459,228.29
CDO - NEW WESTERN DIVERSION ROAD, (CANITO-AN CORPORATION (5143)
- CAGAYAN DE ORO COASTAL ROAD), PACKAGE 5,
CAGAYAN DE ORO CITY
CLUSTER A CONSTRUCTION/IMPROVEMENT OF JEJOR'S CONSTRUCTION 260,389,161.40
VARIOUS BUILDINGS, DPWH X COMPOUND, CORPORATION (5143)
ENGINEER'S HILL, BULUA, CAGAYAN DE ORO CITY

CONSTRUCTION OF THE MISAMIS ORIENTAL WEST JEJOR'S CONSTRUCTION 28,208,896.42


DIVERSION ROAD (BUTUAN- CDO - ILIGAN ROAD), CORPORATION (5143)
OPOL TO LUGAIT, MISAMIS ORIENTAL

CLUSTER RO-02 CONSTRUCTION OF BUILDING JEJOR'S CONSTRUCTION 116,843,186.57


PROJECTS IN BUKIDNON, 1. CONSTRUCTION OF CORPORATION (5143)
TRACK AND FIELD AND TRACK OVAL, BRGY.
LAGUITAS, MALAYBALAY CITY, BUKIDNON =
PHP30,000,000.00, 2.
CONSTRUCTION OF PERIMETER FENCE (WITH FENCE
LIGHTS), BRGY. LAGUITAS ...
EFFECTIVITY ACCOMPLISHME NT
STATUS DATE EXPIRY DATE

Completed April 28, 2020 May 13, 2021 100.00

Completed January 23, January 07, 100.00


2020 2021

Completed December 04, August 24, 2022 100.00


2020

Completed September 22, March 15, 2021 100.00


2020

Completed September 22, March 19, 2021 100.00


2020

Completed March 02, 2020 October 31, 100.00


2020

Completed March 02, 2020 September 24, 100.00


2020

Completed March 02, 2020 May 05, 2021 100.00

Completed December 06, June 28, 2021 100.00


2020
On-Going December 06, September 10, 83.20
2020 2021
Completed March 23, 2020 May 08, 2020 100.00

On-Going December 06, October 03, 96.52


2020 2021
On-Going January 04, October 30, 100.00
2021 2021
On-Going January 09, October 30, 68.59
2021 2021
Completed February 26, January 01, 100.00
2020 2021

Completed December 07, May 07, 2022 100.00


2020

Completed March 09, 2020 June 21, 2021 100.00

Completed March 09, 2020 September 04, 100.00


2020
Completed March 09, 2020 November 03, 100.00
2020

Completed March 09, 2020 April 12, 2021 100.00

Completed December 07, December 21, 100.00


2020 2021

Completed March 09, 2020 March 03, 2021 100.00

Completed December 07, December 20, 100.00


2020 2021

Completed December 07, December 20, 100.00


2020 2021

Completed December 07, November 17, 100.00


2020 2021
Completed March 09, 2020 September 04, 100.00
2020

Completed October 26, December 31, 100.00


2020 2021

Completed November 23, February 09, 100.00


2020 2022