Automation FA1 Activity

This document outlines the Formative Assessment-1 (FA-1) for the B. Voc. (Mechatronics) program at Pimpri Chinchwad College of Engineering for the academic year 2024-2025. It includes a series of questions related to industrial automation, PLC applications, automation systems, and logic gates, with specific marks allocated for each question. The submission deadline for the assessment is set for March 15, 2025.

Uploaded by

Rahul Mali
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
7 views

Automation FA1 Activity

This document outlines the Formative Assessment-1 (FA-1) for the B. Voc. (Mechatronics) program at Pimpri Chinchwad College of Engineering for the academic year 2024-2025. It includes a series of questions related to industrial automation, PLC applications, automation systems, and logic gates, with specific marks allocated for each question. The submission deadline for the assessment is set for March 15, 2025.

Uploaded by

Rahul Mali
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Pimpri Chinchwad Education Trust’s

Pimpri Chinchwad College of Engineering (PCCoE)


(An Autonomous Institute)
Affiliated to Savitribai Phule Pune University (SPPU)
ISO 21001:2018 Certified by TUV SUD
Formative Assessment-1 (FA-1)

Program: B. Voc. (Mechatronics) Academic Year: 2024 – 2025, Sem II


Subject: Industrial Automation Marks: 25 Date: 03/02/2025

Q. No. Marks
1. Explain in detail any one PLC application you have witnessed. (Include one self-captured
photo or line diagram of the same, enlist different parts (input, output and CPU) with their
5
function, elaborate its working, its advantages compared to earlier system in place and write
basic program for the said application)
2. Write any 7 questions from the following 7
2.1 Write the need of Automation in industries and enlist its advantages with suitable example. 1
2.2 Explain the Automation Hierarchy with suitable example. 1
2.3 Enlist the basic elements / components of Automation systems. Write the function and
1
example of each component.

Discuss different input and output components of Automation systems used in industries with
2.4 1
suitable examples
Differentiate between Fixed, Programmable, Flexible Automation systems with suitable
2.5 1
examples.
Explain in brief Fixed, Programmable, Flexible Automation systems and enlist 2 examples of
2.6 1
each system.
2.7 Enlist differences between PLC and SCADA 1
2.8 Write a short note on SCADA, DCS, and Variable Frequency Drives 1
3. Write any 7 questions from the following 7
Define a Programmable Logic Controller (PLC) and explain its role in modern industrial
3.1 1
automation.
Enlist different Building blocks / major components of PLC. Brief about the functions of each
3.2 1
block with a real-world example.
3.3 What are the limitations of relays. or State the advantages of PLCs over relays. 1
3.4 Discuss the role of different input and output modules in a PLC system using suitable
1
examples.
3.5 Explain in detail the working of PLC based on the room heating or cooling example
1
considering the input, output and CPU components involves and their functions to effectively
fulfill the said objective.
3.6 Elaborate the working of PLC with suitable real life / day to day life example. 1
3.7 Enlist the different programming languages used for PLC as per IEC 61131-3 standards. Write
1
a short note on Ladder Diagram Programming.
3.8 Describe the working principle of a PLC from receiving input signals to generating output
1
signals. Provide a real-world example to illustrate your explanation.
4. Write any 6 questions from the following 6
Explain ‘AND’ and ‘OR’ logic gates with truth table, symbolic representation, ladder diagram
4.1 1
using suitable examples.
Elaborate ‘NAND’ and ‘NOR’ logic gates with suitable real-life examples. Write truth table,
4.2 1
symbolic representation, and ladder diagram for the same.
4.3 Write a note on ‘NOT/INVERTER’, ‘XOR’ and ‘XNOR’ logic gates including truth table,
1
symbolic representation, and ladder diagram. Illustrate the gates using suitable examples.
4.4 Discuss the different types of PLC memories (Program memory, Data memory, Input-output
1
memory etc.) and their functions.
4.5 Describe the PLC Scan Cycle and its importance in functioning of PLC. 1
4.6 Explain the redundancy (Power redundancy, CPU redundancy, and I/O redundancy) in PLC
1
systems and state its importance for critical applications.
4.7 Discuss the factors affecting the selection of a PLC for an industrial process. 1

➢ Last date for submission of FA1 is 15/03/2025