The document outlines the electrical installation bills of quantities and specifications for a ground floor project, detailing various items such as lighting points, power points, and distribution boards. It includes quantities, unit rates, and amounts for each item, along with specific installation requirements. The final section summarizes the total amounts carried forward from previous pages, culminating in a total cost in Kenya shillings.

Uploaded by

stenocyber2
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
8 views5 pages

Eye Clinic Ground Floor

The document outlines the electrical installation bills of quantities and specifications for a ground floor project, detailing various items such as lighting points, power points, and distribution boards. It includes quantities, unit rates, and amounts for each item, along with specific installation requirements. The final section summarizes the total amounts carried forward from previous pages, culminating in a total cost in Kenya shillings.

Uploaded by

stenocyber2
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

GROUND FLOOR

Electrical Installation Bills of Quantities and Specifications

ITEM DESCRIPTION QTY UNIT RATE AMOUNT


NO
Supply, deliver, install, test, and commission The KSHS. CTS
following to specifications and approval

A0 Lighting points wired in 3 x 1.5 mm2 code 6491X 35 NO


BS6346 Copper cables drawn in 20mm Ø HG full 2,
Conduit concealed in the building fabric including all
conduit accessories but excluding receptacles and
luminaires for One-way switching control.

01 Lighting points wired in 3 x 1.5 mm2 code 6491X 37 NO


BS6346 Copper cables drawn in 20mm Ø HG full pvc,
Conduit concealed in the building fabric including all
conduit accessories but excluding receptacles and
luminaires for Two-way switching control.
02 13A 240v ac general purpose power points wired in 3 x 12 NO
2.5 mm2 Code 6491X BS6346 Copper cables drawn in
20mm Ø HG full pvc, Conduit concealed in the
building fabric including all conduit accessories but
excluding receptacles for the ring-main general
purpose power systems.
03 45A 240v ac DP general purpose power points wired in 01 NO
3 x 6.0 mm2 Code 6491X BS6346 Copper cables
drawn in 20mm Ø HG full pvc, Conduit concealed in
the building fabric including all conduit accessories but
excluding receptacles for the cooker control unit

TOTAL KSHS.

AIC-E01
ITEM DESCRIPTION QTY UNIT RATE AMOUNT
NO
KSHS. CTS
A04 Sub-main cables, 5 x 10.0mm2 Code 6491X BS6346 20 M
Copper cables drawn in 32mm Ø HG pvc conduit
concealed in the building fabric including all conduit
accessories and installation but excluding cable
termination for power supply to the distribution board
A.
05 Bonding and bridging of all the metal works in the 01 Item
building services in 4.0mm2 Code 6491X BS6346
Copper (E.C.C) Cables terminating in copper earth-
clips to approval.
06 Carry out “Life and dead” circuit installation tests 01 Item
including but not limited to:
 Verification of polarity
 Effectiveness of earthing
 Ring final circuit continuity
 Insulation resistance
07 Main power earthing in 6.0mm2 Code 6491X BS6346 01 Item
Copper cables drawn in 20mm Ø HG pvc conduit
concealed in the building fabric and terminated to
copper earth rods at the meter box to approval

08 Install a double run of 32mm Ø HG pvc conduit in a 01 Item


ring linking all data connection points to the server
room.
09 Install 06 No 32mm Ø HG pvc concealed conduit in 01 Item
provision for rising mains.

B0 1200mm 1 x 36w LED luminaire as BG/Tamlite 11 NO


lighting complete with installation and termination.
01 Square 1 x 18w LED luminaire with prismatic 57 NO
controllers as BG/Tamlite lighting complete with
installation and termination.
02 1 x 18w LED bulk head luminaire. 05 NO

TOTAL KSHS.

AIC-E02
ITEM DESCRIPTION QTY UNIT RATE AMOUNT
NO
KSHS. CTS
B03 06A 1-gang 1-way moulded case flush mounted X- 09 NO
rated switch to BS3676 as BG (Nexus) or MEM
complete with installation and termination.

04 06A 2-gang 1-way moulded case flush mounted X- 03 NO


rated switch to BS3676 as BG (Nexus) or MEM
complete with installation and termination.

05 06A 1-gang 2-way moulded case flush mounted X- 09 NO


rated switch to BS3676 as BG (Nexus) or MEM
complete with installation and termination.

06 06A 2-gang 2-way moulded case flush mounted X- 10 NO


rated switch to BS3676 as BG (Nexus) or MEM
complete with installation and termination.

07 06A 3-gang 2-way moulded case flush mounted X- 01 NO


rated switch to BS3676 as BG (Nexus) or MEM list
no. 2401 complete with installation and termination.

08 13A 240V ac moulded case flush mounted double pole


switched universal socket outlets as MEM moulded
range
 2-gang with neon list no. 3107 12 NO
 Data access points moulded case flush 10 NO

B09 45A 240V ac DP moulded case flush mounted cooker 01 NO


control unit with S/O

C0 100A 415V ac 06-ways TPN metal cased flush 01 NO


mounted distribution board with 100A integral
isolator system and Allan key lockable as MEM
complete with installation.

TOTAL KSHS.

AIC-E03
ITEM DESCRIPTION QTY UNIT RATE AMOUNT
NO
KSHS. CTS
01 (a) Mem miniature circuit breakers to BS 3871.
Type B single pole with M6 operating duty
characteristics complete with installation and
termination.
(i) 10A MCB SP 08 NO
(ii) 30A MCB SP 02 NO
(iii) 45A MCB DP 01 NO
(b) Metal blank plates as MEM for the spare
capacity channels:
i. Single pole metal blank list No. 1 Q BP 02 NO
ii. 03 Pole metal blank list NO 3QBP 02 NO

02 a) Design and fabricate in powder coated mild 01 Item


steel three phase Electrical Enclosure compliant
to NEMA standard specifications 3R to house
the system controls enlisted in C02 (b) below
complete with Allan key lockable shutters

b) Main-incoming power control and metering 01 Item


panel consisting of:
i. Cut-out and metering
ii. Main 4-terminal 400A 415V ac MCCB
iii. 04 NO pie-metal bus bars (Copper/AL)
iv. 05 NO 80A 415V ac MCB’S
v. Earthing bus bar
vi. Phase digital indicator meters

c) Installation of C02 (a) above as would be 01 Item


instructed on site.
03 Termination of sub-main supply cables to the DB ‘A’ 01 Item
and main bus bar system.
D0 08-zone 240V ac fire control panel complete with 01 Item
installation and programming
01 240V ac break-glass fire call-points complete with 08 NO
installation
02 04 terminal ionization smoke detector fire call-points 07 NO
complete with installation and testing
03 240V ac bell sounder fire alarm system complete with 05 NO
installations

TOTAL KSHS.

AIC-E04
Summary
All totals brought forward from previous pages.

KSH CTS

Total brought forward from page E01


Total brought forward from page E02
Total brought forward from page E03
Total brought forward from page E04
TOTAL KSHS.