2024-08-27 KPFF Lunch and Learn

The document outlines the KPFF team's expertise in civil and structural engineering, highlighting their services, project history, and staff qualifications, particularly their connection to UCLA. It discusses stormwater management practices, including post-construction and during construction strategies, along with the regulatory framework for compliance. Additionally, it covers seismic evaluations and retrofits of campus buildings, detailing advancements in standards and specific case studies of completed projects.

Uploaded by

demo4u2
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
170 views88 pages

2024-08-27 KPFF Lunch and Learn

The document outlines the KPFF team's expertise in civil and structural engineering, highlighting their services, project history, and staff qualifications, particularly their connection to UCLA. It discusses stormwater management practices, including post-construction and during construction strategies, along with the regulatory framework for compliance. Additionally, it covers seismic evaluations and retrofits of campus buildings, detailing advancements in standards and specific case studies of completed projects.

Uploaded by

demo4u2
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 88

Civil and Structural Engineering

August 27, 2024 1


Who we are

August 27, 2024 2


The KPFF Team

Mark Hershberg, Maikol Del Devlin Thomas, Jeff Gavazza, PE Ishwar Dhungana, BK Kang, PE,
SE Carpio, PhD, PE SE PE, LEED AP, QSP LEED AP
Principal Associate Associate Principal Principal Associate

UCLA Alum (2x) Spouse of a UCLA UCLA Alum UCLA Alum First UCLA project Engineering VI
Former Lecturer for Alum Pauley Court Stormer First UCLA Project Terasaki Hall (Phase 1 and Phase
UCLA CEE 141 First UCLA Project Circa 2002 was Remodel of the Graduate School of 2),
First UCLA project was Pritzker Hall Born and Raised in Acosta Training Arts Botany Building
was Terasaki Hall Published with UCLA Ojai, CA Center Basketball Practice Renovation, and
Faculty Facility Campus Drainage
Westwood Plaza Study
Justice Center

3
About KPFF

4
Services

5
KPFF Offices
Seattle, WA Salt Lake City, UT
Tacoma, WA Austin, TX
Lacey, WA Des Moines, IA
Spokane, WA St Louis, MO
Portland, OR Madison, WI
Eugene, OR Chicago, IL
Sacramento, CA Indianapolis, IN
San Francisco, CA Cincinnati, OH
Los Angeles, CA Louisville, KY
Long Beach, CA Lexington, KY
Irvine, CA Nashville, TN
Newport Beach, CA Birmingham, AL
San Diego, CA Washington, DC
Boise, ID New York, NY

6
UCLA Alumni
Nearly 1/3 of our total Los
Angeles staff are UCLA grads.

We have more Bruins on our staff


than we have alumni from any
other university!

7
Civil Engineering at UCLA:
SWPPP - Construction Stormwater Management

August 27, 2024 9


Stormwater Management

Two types of stormwater


management
• Post Construction (Low Impact
Development-LID)
• During Construction (SWPPP)
Post Construction

Low Impact Development


• Infiltration
• Capture and reuse
• Biofiltration

March 31, 2021 11


During Construction - SWPPP

What is SWPPP?
Key Components:
• NOI
• WDID
• NOT
• SMARTS
Construction General Permit (CGP)
Key Dates and Transition Guidelines:
• 2022 CGP
• PROJECT WITH WDID BEFORE SEPT. 1, 2023:
• Two-year regulatory Transition Period
• Option 1: Continue coverage under 2009 CGP
• Option 2: Enroll for coverage under 2022 CGP
• AFTER AUGUST 31, 2025:
• Mandatory Enrollment Under 2022 CGP for all active
projects under 2009 CGP
• NEW PROJECTS AFTER SEPT. 2023:
• Compliance with 2022 CGP Required
2022 CGP CHANGES INCLUDE:

• Total Maximum Daily Load (TMDL)


Implementation Requirements
• Dewatering Notification in terms of
SWPPP Updates
• Revised Storm-Related Monitoring
Requirements
• Others: Project Site Descriptions, BMP
Locations, Passive Treatment, Final Site
Maps
Role & Responsibilities - QSD
• SWPPP Documentation
• Inspections:
• Start of Construction
• Replacing QSD
• Twice Annually
• Following Numeric Action Level Exceedance
• Compliance Filings:
• File COI
• File NOT
Role & Responsibilities - QSP

• SWPPP Oversight
• Inspections
• Once per Month (Inactive)
• Pre-Qualifying Precipitation Events
• Following Numeric Action Level Exceedance
• During NOT Filing
Role & Responsibilities – QSP Delegates
• Authorized Duties:
• Visual Inspections
• Sampling
• SWPPP and BMP Implementation

• Training Requirements:
• Foundational Training
• Site-Specific Training
Civil Engineering at UCLA:
Post-Construction Stormwater Management

August 27, 2024 21


Post-Construction Stormwater Management
Quantity Quality
- Stormwater Detention - Low Impact Development

August 27, 2024 22


Post-Construction Stormwater Management
Stormwater BMP
Example - Engineering VI

August 27, 2024 23


Storm Water Management
Quality
- Low Impact Development

August 27, 2024 24


Campus Drainage Study
• Compiled existing storm drain
information in coordination with
UCLA Capital Programs
• Divided the 419-acre study area into
four main tributary areas.
• Analyzed hydraulic capacity of larger
campus storm drain mains (equal to
or greater than 24”) for 2-yr, 5-yr, 10-
yr, 25-yr, 50-yr, and 100-yr design
storm events

August 27, 2024 25


Campus Drainage Study
• 838 acres of offsite
tributary area

• Campus is located
downstream of Stone
Canyon Reservoir

August 27, 2024 26


West Tributary Area (Green)
• 53 Acres

• Student Housing and the


Sunset Canyon Recreation
Center

• Charles E Young Drive West


and De Neve Drive

August 27, 2024 27


West Tributary Area (Green) – 2 Yr Design Storm

August 27, 2024 28


West Tributary Area (Green) – 10 Yr Design Storm

August 27, 2024 29


West Tributary Area (Green) – 50 Yr Design Storm

August 27, 2024 30


North Tributary Area (Blue)
• 109 Acres

• Central portion of the


campus - North Campus
Student Center, Anderson
School, Ackerman Union,
Pauley Pavilion, etc.

• 66” storm drain main that


conveys the upstream
offsite runoff.
August 27, 2024 31
North Tributary Area (Blue) – 2 Yr Design Storm

August 27, 2024 32


North Tributary Area (Blue) – 5 Yr Design Storm

August 27, 2024 33


North Tributary Area (Blue) – 10 Yr Design Storm

August 27, 2024 34


East Tributary Area (Blue) – 100 Yr Design Storm

August 27, 2024 35


East Tributary Area (Purple)
• 75 Acres

• Parking Structure 3, School


of Theater, School of Law,
Young and Hershey
Halls,and Botany Garden.

• Two parallel storm drain


mains merge into single
36” SD near PS2.

August 27, 2024 36


East Tributary Area (Purple) – 2 Yr Design Storm

August 27, 2024 37


East Tributary Area (Purple) – 5 Yr Design Storm

August 27, 2024 38


East Tributary Area (Purple) – 10 Yr Design Storm

August 27, 2024 39


East Tributary Area (Purple) – 100 Yr Design Storm

August 27, 2024 40


South Tributary Area (Brown)
• 52 Acres

• Engineering, Math and Life


Sciences Buildings, as well
as the UCLA Medical Plaza.

• 24” SD main begins at the


intersection of Charles E
Young Drive South and
Westwood Plaza, then
connects to 30” main.
August 27, 2024 41
South Tributary Area (Brown) – 2 Yr Design Storm

August 27, 2024 42


South Tributary Area (Brown) – 5 Yr Design Storm

August 27, 2024 43


South Tributary Area (Brown) – 10 Yr Design Storm

August 27, 2024 44


South Tributary Area (Brown) – 100 Yr Design Storm

August 27, 2024 45


Site Design Considerations
• Slope away from the building entrances.

• Maximize the pervious area. Incorporate


stormwater basins into the landscape design.

• Incorporate detention system to match the


pre-construction condition.

• Consider drywells as the stormwater


treatment strategy if feasible.

August 27, 2024 46


Structural Engineering at UCLA:
Evolving Standards for Seismic Evaluations and
Retrofits

August 27, 2024 47


“A Campus at Risk”: 1980s

August 27, 2024 48


Northridge Earthquake

August 27, 2024 49


Post-Northridge Seismic Retrofit

August 27, 2024 50


1990s Era Seismic Ratings

August 27, 2024 51


Advancements in Understanding

1988 2007 2017

August 27, 2024 52


Current UC Seismic Policy (2021)
SPL Rough Equivalent
I New OSHPD construction
II Recent OSHPD construction meeting SPC 5
III Current code construction (Non-OSHPD)
IV Recent construction or retrofit
V Substandard, similar to SPC 2– May not be
occupied after 2030
VI Substandard, similar to SPC 1 – Immediate
corrections required
VII Immediate safety hazard – evacuation
required

August 27, 2024 53


2018 UCOP Guidelines Update
• Updating Seismic Risk
Model
• Ratings determined prior
to 2006 must be
reevaluated
• Retrofits designed prior to
2000 must be reevaluated

August 27, 2024 54


Evolving Earthquake Design Standards
ASCE 41-17 Seismic Force Levels vs. Historical Standard and
Actual Northridge Earthquake Intensity Measured at UCLA
SPL III (LS)

SPL IV (LS)

Minimum standard under 2018 UCOP Guidelines


1991 UBC*

SPL V (LS)

Northridge Actual

0 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6

* 1991 UBC Base Shear normalized to an ASCE 41-13 equivalent for shear mechanism in wall piers, considering load factors, reduction factors, and expected material strength
factors that are relevant to each code at the Life Safety performance objective. Ductility inherent in elements designed to 1991 UBC standards is likely to rate higher in a
displacement-based analysis (Method B).

August 27, 2024 55


Seismic Improvements
Framing the Problem

August 27, 2024 56


Seismic Upgrade, The Problem

August 27, 2024 57


Traditional Approach

August 27, 2024 58


Seismic Upgrade, The Problem

August 27, 2024 59


Seismic Upgrade, The Problem

August 27, 2024 60


Case Studies

August 27, 2024 61


Luskin Public Affairs Building
Leading the next generation of projects

August 27, 2024 62


Luskin Public Affairs

• Originally Business School


• Constructed 1957
• Department master plan project
with CO Architects
• First reevaluation of a 1990s retrofit
• Formerly rated as SPL III/GOOD due to
retrofit
• Reevaluated as SPL V
• Construction complete, rated SPL III

August 27, 2024 63


Northridge Earthquake

August 27, 2024 64


Buttress Retrofit 1995

August 27, 2024 65


Conventional Analysis Results

August 27, 2024 66


Nonlinear Analysis Results

STAIR WALL

BUTTRESS CONNECTION

STAIR WALL

August 27, 2024 67


Initial Retrofit Scheme

August 27, 2024 68


Reducing the Interior Disruptions

August 27, 2024 69


Refined Retrofit Scheme

August 27, 2024 70


Completed Retrofit

August 27, 2024 71


UCLA Wooden Center
Innovation & Testing New Ideas

August 27, 2024 72


UCLA Wooden Center Seismic Upgrade

August 27, 2024 73


UCLA Wooden Center Seismic Upgrade

August 27, 2024 74


UCLA Wooden Center Seismic Upgrade

August 27, 2024 75


UCLA Wooden Center Seismic Upgrade
Test 1: Control Test 2: FRP Test 3: FRP Test 4: FRP

~1 k/ft ~9 k/ft ~8 k/ft ~7 k/ft

August 27, 2024 76


UCLA Wooden Center Seismic Upgrade

August 27, 2024 77


UCLA Wooden Center Seismic Upgrade

August 27, 2024 78


UCLA Wooden Center Seismic Upgrade

August 27, 2024 79


UCLA Wooden Center Seismic Upgrade

August 27, 2024 80


Additional Campus Seismic
Projects

August 27, 2024 81


Additional Campus Seismic Projects

Pritzker Hall Tower


• Late first-generation
project, SPL V
• Tested mockups of load-
bearing façade in lab to
determine seismic
performance
• Incorporated viscous
dampers
• Retrofit complete, SPL III
August 27, 2024 82
Additional Campus Seismic Projects

Dentistry Building
• Late first-generation
project, SPL V
• Reclassified North Wing
to SPL IV through
enhanced analysis
• Minimal retrofit to
upgrade South Wing
• Retrofit complete, SPL IV
August 27, 2024 83
Additional Campus Seismic Projects

La Kretz Botany Building


• Full renovation project
with CO Architects
• Updated seismic
evaluation, SPL V
• Retrofit complete, SPL IV

August 27, 2024 84


Additional Campus Seismic Projects

School of Law
• Program update and
expansion study with MRY
• Updated seismic
evaluation, SPL V
• Further study
recommended
• Next steps TBD
August 27, 2024 85
Additional Campus Seismic Projects

Kerckhoff + Ackerman
• Updated seismic
evaluations, SPL V
• Further study
recommended
• Next steps TBD

August 27, 2024 86


Additional Campus Seismic Projects

CoGen
• Updated seismic
evaluation, SPL V
• Further study
recommended
• OSHPD CUP design
pending with NBBJ
• Next steps for CoGen TBD
August 27, 2024 87
Additional Campus Seismic Projects
40+ Tier 1 Seismic Evaluations
• Driven by UCOP reporting
requirements
• On and off campus locations
• Roughly one-half rated as
SPL V
• Many will improve with Tier 2
or 3 evaluations

August 27, 2024 88


Thank you

August 27, 2024 89