0% found this document useful (0 votes)
2 views

Book1

The document outlines the specifications for plastering walls with a cement mortar ratio of 1:5 at a thickness of 12mm, detailing various areas within Blocks 2, 3, and 4 that require plastering. It includes measurements for different rooms, windows, doors, and other architectural features, along with total quantities for plastering. The total plastering area amounts to 16,167.78 m² across the specified blocks.

Uploaded by

tcellestimate
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2 views

Book1

The document outlines the specifications for plastering walls with a cement mortar ratio of 1:5 at a thickness of 12mm, detailing various areas within Blocks 2, 3, and 4 that require plastering. It includes measurements for different rooms, windows, doors, and other architectural features, along with total quantities for plastering. The total plastering area amounts to 16,167.78 m² across the specified blocks.

Uploaded by

tcellestimate
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

Agt No 30) Plastering the walls with cement mortar 1:5,(One of cement and five of sand) 12mm thick

including provid
curing etc., Complete in all respects as directed by the departmental officers

Block 2 BW Foundation and basement


Room inner plastering work
Description Nos L(m)
Block 2 GF&FF inner plastering work
GF & FF Wall plastering Block 2,3,4
Hall alround 1 80 12.10
d/f open kitchen -1 80 0.75
d/f open passage -1 80 0.76
d/f bed -1 80 0.91
d/f bed window -1 80 1.22
Bedroom alround 1 80 10.80
d/f bed door -1 80 0.91
d/f bed window -1 80 1.22
kitchen alround 1 80 7.26
d/f kitchen open -1 80 0.75
d/f kit window -1 80 0.91
Bathroom alround 1 80 5.90
d/f ventilator -1 80 0.61
D/F doors -1 80 0.76
Toilet alround 1 80 3.92
d/f ventilator -1 80 0.61
D/F doors -1 80 0.76
Passage alround 1 80 3.86
D/F doors -1 2 80 0.76
Bedroom loft top 1 1 80 3.00
Loft front face 1 1 80 3.00
cupboard wall sides 1 4 80 0.30
cupboard wall front 1 2 80 0.08
Hearth slab top 1 1 80 1.82
Hearth slab sink ded -1 1 80 0.60
Hearth slab front face 1 1 80 1.82
Hearth slab pillar side(3 pillars)(2pillar arrested by wall 1 4 80 0.60
and one center pillar)
Hearth slab pillar front face 1 3 80 0.07
Jambs door D1 1 1 80 5.78
Jambs door D1 1 1 80 5.78
Jambs door D2 1 2 80 5.48
Jambs OPENING 1 2 80 5.46
Jambs UPVC 1 1 80 4.88
Jambs UPVC 1 1 80 4.26
Jambs VENTILATOR 1 2 80 2.44
Block 2 Outer plastering
Building alround from basement to parapet top 1 1 224.74
d/f Bed window -1 32 1 1.22
d/f kichen window -1 32 1 0.91
d/f ventilator -1 32 2 0.61
ss top bed 1 32 1.68
ss sides kw and bed win 1 32 4
ss top hall 1 32 1.22
ss top kitchen 1 32 1.37
Staircase portion inner "ப" shape alround 1 4 12.28
D/F mid landing open -1 4 2 1.20
D/F mid landing open -1 1 2 1.82
GF to FF 1st flight bottom 1 4 3.10
Gf to FF 2nd flight bottom 1 4 2.80
GF to FF 1st flight handrail both side 1 4 2 3.10
Gf to FF 2nd flight handrail both side 1 4 2 2.80
GF to FF 1st flight handrail top 1 4 3.10
Gf to FF 2nd flight handrail top 1 4 2.80
FF to SF 1st flight bottom 1 1 3.10
FF to SF 2nd flight bottom 1 1 2.80
FF to SF 1st flight handrail both side 1 1 2 3.10
FF to SF 2nd flight handrail both side 1 1 2 2.80
FF to SF 1st flight handrail top 1 1 3.10
FF to SF 2nd flight handrail top 1 1 2.80
Mid landing bottom 1 4 2 2.45
Midlanding parapet inner portion 1 4 1 2.45
Midlanding parapet top portion 1 4 1 2.45
D/F mid landing open -1 4 2.45
Headroom outer alround 1 1 13.71
D/F open -1 1 2 2.45
D/F Door open -1 1 2 0.91
Headroom inner alround 1 1 13.25
ss top 1 1 1.68
ss sides 1 1 1
Headroom slab and beam alround 1 1 16.62
Headroom slab parapet inner 1 1 6.09
Headroom slab parapet top (c/c) 1 1 6.78
Terrace parapet wall inner(c/c)(from A2 grid) 1 1 219.62
Terrace parapet wall top(c/c)(from A2 grid) 1 1 219.62

Block 3,4 Outer plastering


Building alround from basement to parapet top 2 1 166.24
d/f Bed window -2 24 1 1.22
d/f kichen window -2 24 1 0.91
d/f ventilator -2 24 2 0.61
ss top bed 2 24 1.68
ss sides kw and bed win 2 24 4
ss top hall 2 24 1.22
ss top kitchen 2 24 1.37
Staircase portion inner "ப" shape alround 2 3 12.28
D/F mid landing open -2 3 2 1.20
D/F mid landing open -2 1 2 1.82
GF to FF 1st flight bottom 2 3 3.10
Gf to FF 2nd flight bottom 2 3 2.80
GF to FF 1st flight handrail both side 2 3 2 3.10
Gf to FF 2nd flight handrail both side 2 3 2 2.80
GF to FF 1st flight handrail top 2 3 3.10
Gf to FF 2nd flight handrail top 2 3 2.80
FF to SF 1st flight bottom 2 1 3.10
FF to SF 2nd flight bottom 2 1 2.80
FF to SF 1st flight handrail both side 2 1 2 3.10
FF to SF 2nd flight handrail both side 2 1 2 2.80
FF to SF 1st flight handrail top 2 1 3.10
FF to SF 2nd flight handrail top 2 1 2.80
Mid landing bottom 2 3 2 2.45
Midlanding parapet inner portion 2 3 1 2.45
Midlanding parapet top portion 2 3 1 2.45
D/F mid landing open -2 3 2.45
Headroom outer alround 2 1 13.71
D/F open -2 1 2 2.45
D/F Door open -2 1 2 0.91
Headroom inner alround 2 1 13.25
ss top 2 1 1.68
ss sides 2 1 1
Headroom slab and beam alround 2 1 16.62
Headroom slab parapet inner 2 1 6.09
Headroom slab parapet top (c/c) 2 1 6.78
Terrace parapet wall inner(c/c)(from A2 grid) 2 1 219.62
Terrace parapet wall top(c/c)(from A2 grid) 2 1 219.62

Total plastering 1:5 = 16167.78 m2


m thick including providing band cornice
ntal officers

B(m) D(m) Qty(m2)

2.93 2831.40
1.98 -118.80
1.98 -120.38
1.98 -144.14
1.22 -119.07
2.93 2527.20
1.98 -144.14
1.98 -193.25
2.93 1698.84
1.98 -118.80
1.22 -88.82
2.93 1380.60
0.61 -29.77
1.98 -120.38
2.93 917.28
0.61 -29.77
1.98 -120.38
2.93 903.24 3.86
1.98 -240.77
0.60 144.00
0.05 12.00
1.98 190.08
1.98 23.76
0.60 87.36
0.60 -28.80
0.05 7.28

0.76 145.92

0.76 12.77
0.15 69.36
0.15 69.36
0.12 105.22
0.12 104.83
0.23 89.79
0.23 78.38
0.23 89.79
Total qty 9871.18 m2

8.36 1878.83 235.74


1.22 -47.63 222.58
1.22 -35.53 222.58
0.61 -23.81 222.58
0.60 32.26
0.60 0.0625 4.80
0.60 23.42
0.60 26.30
6.55 321.74 13.71
0.15 -1.44 6.40
0.15 -0.55 6.40
1.20
1.20
0.80 19.84
0.80 17.92
0.08 0.93
0.08 0.84 5.4
1.20
1.20
0.80 4.96
0.80 4.48
0.08 0.23 3.35
0.08 0.21
1.50 29.40
0.90 8.82 15.7
0.12 1.18
6.40 -62.72 6.40 0
1.98 27.15 1.82
0.98 -4.80 6.40 0
1.98 -3.60 6.40 0
1.98 26.24 13.25
0.60 1.01
0.60 0.0625 0.04
0.38 6.32 13.71
0.30 1.83
0.23 1.56
0.76 166.91
0.23 50.51
Total qty 2477.63 m2 6194.0645

8.36 2779.53 235.74


1.22 -71.44 222.58
1.22 -53.29 222.58
0.61 -35.72 222.58
0.60 48.38
0.60 0.0625 7.20
0.60 35.14
0.60 39.46
6.55 482.60 13.71
0.15 -2.16 6.40
0.15 -1.09 6.40
1.20
1.20
0.80 29.76
0.80 26.88
0.08 1.40
0.08 1.26 5.4
1.20
1.20
0.80 9.92 20597.5
0.80 8.96 12008 21014
0.08 0.46 3.35
0.08 0.42
1.50 44.10
0.90 13.23 15.7
0.12 1.76
6.40 -94.08 6.40 0
1.98 54.29 1.82
0.98 -9.60 6.40 0
1.98 -7.21 6.40 0
1.98 52.47 13.25
0.60 2.02
0.60 0.0625 0.08
0.38 12.63 13.71
0.30 3.65
0.23 3.12
0.76 333.82
0.23 101.03
Total qty 3818.97 m2 9547.4335

You might also like