CSR Matrix
CSR Matrix
Customer Specific Requirement Matrix CSR/I/001, Rev No “21” Date: 04.10.2024 Legend When any New customer specific requirements released customer manual directly can be used at plant site till next 1 month until the CSR matrix updation. Update frequency Once /Annum or when changes by customer within one month of released. Additional review monthly and if changes update immediately.
Customer Specific requirements Applicability {Put tick(√) mark for Applicability, N/A for Not applicable} & Ref.Manual Socre card Socre card Socre card PPM, DeliveryPPM, DeliverySocre cardSocre card PPM & Delivery
Socreperformace
card Socre card PPM & Delivery
Socreperformace
card Socre card Socre card Socre card Socre card Socre card Score performace
PPM & Delivery card PPM & Delivery performace
Score card PPM & Delivery performace
Daimler India Honda SMGPL
IATF Hyundai Greaves Hero India Imperial Triumph Honda Dellorto India
Mercedes Benz Group Commercial FIAT India SML Maruti Suzuki India Limited Toyota Piaggio, Volvo Piaggio Bajaj DAF / Cars (Suzuki
Force Borgwar Stellantis Royal HSI All Internal
International Motors LLC Mahindra & Mahindra Auto Motorcycles & Hyzon Motors TVS Motor Company Commercial
CLAUSE ISO9001 & IATF 16949:2016 REQUIREMENTS GMI Automobiles VW Renault Group isuzu Tata Motors Limited Tata Cummins Ltd. Cummins Vehicles Ashok Leyland Motor Motor Cotton moto Simpson Ford Motors Voss Yamaha Industries motor Brembo Atul Auto MG Motor India Pvt. Ltd. SCANIA Aston Martin Automotive Volvo UFI Filters and external
(Mercedes AMG) Vehicles Pvt (Formerly NAVISTAR) Mahindra Vehicles (MSIL) India India Eicher Auto PACCAR India Gujarat Pvt. Motors ner (Ex PSA) Enfield Scooters India USA Inc.
pvt. Limited
Limited Vehicle Pvt.
stake holders
No Pvt Ltd Pvt Ltd India Limited corp Motors limited cycles Pvt. Ltd. Ltd
Ltd. Limited Ltd)
Yamaha Supplier Quality Manual, Royal Enfield SCANIA STD3868
Mahindra PACCARinc
Daimler Supplier Supplier Hero Moto Global Version -6 Doc Reference Supplier STANDARD
General Motors IATF 16949 COMMERCIAL VEHICLE STANDARD supplier Supplier Quality Supplier Quality "No Manual" Ford motor company Customer specific requirements Quality and Environment Aston Martin Volvo Group Supplier
Imperial Ref. Customer Specific
Quality Manual
IATF 16949: RENAULT GROUP MAN Truck & Bus SE / Scania CV AB / evaluation
assurance Supplier Quality Assurance manual CV, Tata Motors, Version General Supplier Manual, Procedure No Quality
"No Manual"
supplier code of
Corp Ltd
Supplier
No manual
IATF 16949:2016, Effective 01-Mar-2024 quality Reference : - RE-IMS- Quality
Specifications for Brembo Rev Date -28/11/2018, GI-0008 Supplier
Customer Specific Requirements of Released Aug 2020. Supplier General requirements Supplier 5 Star audit Supplier General 01276_15_00082 v6 EN Assurance Supplier Quality RASIC Chart General terms Lagonda Limited Quality Assurance Manual
Doc. Requirements. Customer-Specific- Customer-Specific Navistar Inc./ Volkswagen Truck & Bus standard, First
Mahindra manual.
Quality 3.3 Revised on Date 09. Jan 2024. Cummins Incorporated Cummins Incorporated conditions of Quality general_term SSC/001, Origin date manual, quality Assurance conduct Quality Ford Motor Company Customer-Specific Borgwarner Assurance Supplier COM-SQ- Supplies. May 2013 Edition. General Manual July 31, LOI
Issue 29, COMMERCIAL
and conditions Production
General T&C of Supplier Quality Assurance
Sixth Edition 2022.
quality
Mercedes-Benz AG Daimler India No Manual supplier 7th Purchasing adherence Quality purchase terms General Manual June 18, 2021 SQM-01 Manual VEHICLE STANDARD, purchase Manual Rev No "3" Date 27 Supplier Quality assurance
Posted Date: December 01, Requirements (CSRs) Requirements for use of Edition May Vendor Quality Assurance manual Fbd- I20310 Supplier Handbook Supplier Handbook contract for Manual s_of_purchas 30th April,2024, Issue Business 01.04.2022 and Assurance Requirements For use with PPAP Fourth Edition Supplier Quality Rev "02", Date 08.05.2013. purchasing
Assurance Customer manual Rev 2019, (Based on General Purchase for purchase of purchasing terms
Customer Specific Requirements and Vendor 2020
February 2022 commercial vehicles General purchasing of Volkswagen Group IATF 16949:2016 3rd CVS10- TRATON Customer Specific 2012.
evaluation Edition 4th Edition May 2023. Fbd- I20315 (Customer-Specific Requirements) (Customer-Specific Requirements) the supply of e_november_
terms &
Date 03rd May.2024. Vertical
requirements.
whistle blower
manual,
Manual
& conditions
Service PPAP First Edition, Effective 01-Jul-2023. manual, 3rd
terms and Rev 03, manual
FCA US LLC Supplier (SQAM001)
Procurement speciications Feb terms and CVS 10, Release Date HSI Automotive Nov 2023 Manual Rev 004, requirements,
terms & conditions standard, First Issued Manual, Conditions . specific 3, 22 Oct "Other terms and Rev “ 02” applicable. conditions Date- 06 Customer-Specific Quality Revision E – Global Honda agreement T &C 2020-03. goods. & conditions PARMA code India-56850
Effective Date: December 15, March 2022 Edition Nov 2023. Rud- I20313 Publication Date: Jan 11, 2023 Publication Date: Jan 11, 2023 works or 5th Edition 2022_edition Faridabad 3rd Edition Jan policy. Rev 1, Jan July 2019 Rev No “ 12” 2017, conditions. pvt. Limited – Date 20.12.2018 Rev “07”
code of Imperial Auto Industries Limited 2020
MBST 2021 DICV Faridabad
8AG3
Requirements Quality Assurance
Edition May Date: 30th I036, I149, I371, I250 Version 3.2 Lko -I20311 FBD-I000912 services. March 2019
02.04.2024
720094 requirements 2013. 2020.
conditions
Faridabad code
Effective
2017 HJMEA -Plot No 83 / sec 25-closed Dec 2019 Date
Requirements
Manual,
Revision Date:
APQP Guidelines April 2015 01.04.2022 SQM 2019) IATF 16949 Customer- 2022 PARMA code Bawal Plant -
Requirement for Purchased Parts & Faridabad 21472 27.10.2020.
. plants- 15659774 700454 2012. April 2023 . Released date 01.04.2021 " Date 01 01.04.2022 01.04.2021 for IATF 16949:2016 10 November 100435-Sanand, VEN-001131 (AMLPPTC2022) 57913
Plant II -650266385 / 00268377 Suppliers, Release date 2024-08 DI005, Nighojhe San-I66300 JSR-I0009 64446 IN0000I005 Chennai 137210105 650566115 Chennai - 30.06.2023 Version A, Edition Specific-Requirements 188138 VE000465
MERCEDES AMG - 15313588 DI 005 TM 00017 100079 08/31/2020. 5I10 June 2014. Publication Date: August 2017. 5FF0003I26 Ahmedabad Plant PARMA code IMT
Plant III- 00I02036 Pune DI005A, JSR -I30214 IN000PI061 112654 7205535 I250 Chennai code V009059G HJMEG -Plot No 14/6 2S35, Rev "04" Chennai-360006 100184 (CSRs) of Volkswagen V02471
DICV Chennai plant- 1908- TDWX I146 5, 2020 V2903 Faridabad Plant - 57810
Plant VII (42/28)-650317071 40921 -New code yet to release. Rudrapur Rudrapur -7201016 BI0003C Greater Dated Pune-350133 Group March 2022.
15687861 3217 89166 V10093 TMC 0101
DI005BX Noida- 01/08/2024
A00BYI02
√ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
4 4 context of the organization CSR/I/001 4 √ √ √
Evaluate the
The organization shall monitor and review context & risks
information about these external and mfg, infra
internal issues. equipments
NOTE 1
Issues can include positive and negative
factors or conditions for consideration.
NOTE 2
Suppliers shall determine and implement action(s)
Suppliers shall determine and implement action(s) to
to eliminate the causes of potential
eliminate the causes of potential
nonconformities in order to prevent their
nonconformities in order to prevent their occurrence.
occurrence. Preventive actions shall be appropriate
Preventive actions shall be appropriate to the
to the
severity of the potential issues.
severity of the potential issues.
Understanding the external context can The supplier shall establish a process to lessen the
The supplier shall establish a process to lessen the
be facilitated by considering issues arising impact of negative effects of risk including the
impact of negative effects of risk including the
following:
from legal, technological, competitive, following:
a) Determining potential nonconformities and their
market, cultural, social and economic a) Determining potential nonconformities and their
causes;b) Evaluating the need for action to prevent
causes;b) Evaluating the need for action to prevent
environments, whether international, occurrence of nonconformities;
occurrence of nonconformities;
national, regional or local. c) Determining and implementing action needed;
c) Determining and implementing action needed;
d) Documented information of action taken;
d) Documented information of action taken;
e) Reviewing the effectiveness of the preventive
e) Reviewing the effectiveness of the preventive
action taken;
action taken;
f) Utilizing lessons learned to prevent recurrence in
f) Utilizing lessons learned to prevent recurrence in
similar processes.
similar processes.
NOTE 3
Understanding the internal context can be
facilitated by considering issues related to
value, culture. Knowledge and
performance of the organization.
4.2 understanding the needs and √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
4.2 4.2 MBST 2021 √ √ √
expectations of interested parties CSR/I/001
The current product
portfolio of the
supplier
IATF 16949:2016
b) Potential of the
ISO 14001:2015
ISO 45001:2018 supplier for meeting
TVSM’s current and
1. TRATON Customer future requirements
IATF 16949:2016 or Certiifcation IATF 16949:2016 APQP, PPAP
Requirements CVS10 Requirements. c) Organization
Due to their effect or potential effect on IATF 16949:2016 Deviations / ISO 9001:2015, IATF 16949 IATF 16949:2016
2. VW Formel Q series when PSA Achieve >80% or 60-80% conditionally approved.
Sustainability strength
(Waiver s) Mercedes-Benz Special Terms IATF 16949:2016 ISO 14001:2015
the organization’s ability to consistently Or ganizations r equesting IATF from referred to. WCSQ. Suppliers ISO 9001 aiming towards IATF 16949 d) Technical strength,
2021, & MBST 2020. IATF Follow CSR Manual of MSIL. NSA (New Supplier Certification, ISO including
provide products and services that meet deviations (waiver s) for recognized 3. IATF16949 / ISO 9001 Zero defect approach delivering fully confirmed parts / Assessment part of QIP
IATF 16949:2016 Certification productsOn time delivery Rigorous adherence to
14001:2015 Certification VDA 6.3 Process competence of
customer and applicable statutory and certification body standard) qualify
Cer tification must contact IATF 16949. Mau , Items are those approved processes and requirements, and ISO 45001:2018 Audit employees
regulatory requirements, the organization their Renault ASES IATF Certification. ISO 14001 & ISO Quality Systems Basics
MBST 13,14&15-2021 Zero defect Quality characteristic of part, Pro-active risk management. Pass-Thru Characteristic (PTC) – (a.k.a. customer Pass-Thru Characteristic (PTC) – (a.k.a. customer Plus (QSB+)- Must be Certification Requirements. e) Financial strength
shall determine: GM SQE and complete the Certification Min 45001 Certification.
GM 1927 70 SQ IATF 16949 VDA 2, VDA-RGA/ MLA Zero Incident which if defective, could touch point) A part characteristic which is touch point) A part characteristic which is QSB+ certified by PSA. APQP, PPAP, Formula Q series f) Quality
C rank Information to TML for change in IATF New, registration, Process Control Plan Audit Management Systems
a) the interested parties that are Cer tification Waiver IAI shall ensure that the Zero disruption result in incidents of not controlled or functionally tested in the not controlled or functionally tested in the Cummins Sustainability and other VW
CSR VDA 6.3 Process audit Min Grade suspension, revocation, change of CB, etc. (PCPA)- Shpuld be green in IATF 16949:2016 g) Statutory and
relevant to the quality management r equest and obtain GM stipulated ppm On time personal injury or fatality by Cummins assembly process where any issue would assembly process where any issue would first be every Phase. Refer Clause requirements standards as
Supplier Quality Leader ship ISO 14001 & B. regulatory
system; failure rates are reduced to less responsiviness if causing loss of vehicles Supplier shall inform Tata Motors about changes in their first be discovered by the Cummins Customer. May discovered by the Cummins Customer. May be 3.2.4 Pre-evaluation-Good & neceaasry.
appr oval. The completed OHSAS 18001 GP-12 Requirment compliance relating
b) The requirements of these interested and appr oved IATF 16949 than the specification limit any issue. control or fire. QMS registration status, such as new be represented using this symbol represented using this symbol process development to establishment,
ISO 26000 Special Product Group (SPG) certificate, suspension, revocation or switchover to adressed as per PSA
Cer tification Waiver (ultimate objective is 0 ppm/a). New Supplier Some parts with both Maru IATF 16949:2016 system, Quality Technical environment
parties that are relevant to the quality r equest will be stor ed in evaluation. suppliers to conduct NSA, VDA 6.3 another certification body. Tata Motors Certification
Requirements. Refer
On site as well as regulatory denotes Clause No.- 2.4.12 & managemet, Production Information and occupational
management system. GM’s Supplier Cer tification Supply Zero NC Min B Score>85%,. Annual supplier expects its Tier 1 suppliers to manage the quality of
Management System (SCMS) Upload IATF Certificate in site- Assessment Maru A & Regulatory their supplier base. Tier 1 suppliers should
Commitment letter and & Logistics, Sub-supplier Library (TIL) and health & safety
The organization shall monitor and review parts to Renault self assessment submit to Navistar. Single point of Procedure for GP12 PSA
under the pace.suppier.dailmer.com. Also where Maru A +Process also ensure that their supplier base meets Tata Motors contact after PPAP
management. on the VW B2B h) Tier-2 and Tier-3
(01272_16_00012).
information about these interested parties r equesting Or ganization’s and Regulatory denotes Maru requirements Deployment supplier platform supplier capabilities
Plant VW Group Assessment VDA Supplier Quality &
DUNS
A /AR - requirements SEA (Supplier Development Processes www.vwgroupsy i) Controls over out-
Assessment can be waive-off Evaluation Audit) and Measurements sourced processes,
pply.com.
initial Min 70% each Procedure – GP5+'.It etc.
category overall & should be followed. Refer Pre-evaluation audit
Next assessment Clause 3.2.5 APQP, PPAP (SPS/QSR Score Min
Over all 80% all Requirements. 7.50) as per TVS
categories. Sustainability Requirement.
√ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
Pandemic situation in the region
1. Health effects of employees.
2. Health effects of visitors.
3. Business stop due to pandemic
outbreak risk and legal notification. √ √ √
4. Customer line stoppage.
5. Supplier pandemic out break causes
supply of materials risk.
6. Plant long shut down quality affected.
4.3 determining the scope of the √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
4.3 4.3 √ √ √
quality management system QM/IAI/02
The structure of this document aligns with the
requirements with the applicable sections of IATF
The organization shall determine the 16949. Several section headers are followed by the
boundaries and applicability of the quality statement “No Ford Customer-Specific Requirement for
this section” to verify that there is no auditable Ford-
management system to establish its scope
specific requirement for
When determining this scope the this section.
organization shall consider: The presence of this statement does not mean that no
other commercial or technical
a) the internal and external issues are requirements exist for the subject addressed in the
referred to in 4.1; section, or that this statement supersedes existing
commercial or technical requirements.
b) the requirements of relevant Tooling & Equipment suppliers to Ford Motor Company
interested parties referred to in 4.2; are not eligible for certification to IATF 16949.
c) The product and services of the
organization.
Third-Party Registration
To achieve Q1 (refer to
The organization shall apply all the https://web.qpr.ford.com/sta/Q1.html), Production
requirements of this international and Service Part
organizations supplying product to Ford shall be third-
standard if they are applicable within the party registered to IATF 16949 through an IATF-
scope of its quality managements system. recognized Certification Body. The official list of IATF-
recognized Certification Bodies is available through
https://www.iatfglobaloversight.org/
Vendor Top Management
A sub-tier supplier hired by the organization to perform
(CEO) shall submit the below services not directly related to a Ford
signed acknowledgement Motor Company contract (e.g. floor cleaning or grass
document to cutting) is not impacted in any way by the sub-tier
MSIL (refer Format-1.1). supplier development or other sub-tier supplier
Vendor Acknowledgement: requirements stated in IATF 16949.
We hereby undertake, declare Evidence of IATF 16949 Certification Verification
Organizations shall record evidence of their certification
and confirm:
to IATF 16949 in GSDB Online available through Ford
• That we have read and Supplier Portal
understood the Vendor https://web.gsdb2.ford.com/GSDBeans/servlet/gsdbe
The scope of the organization’s quality Quality Assurance Manual ans.web.lib.GSDB
management system shall be available and (VQM) and agree Notification of IATF 16949 Registration Status Change
to meet the requirements Organizations shall notify Ford of any change in their
be maintained as documented IATF 16949 registration status via updating their
MBST Chapters applicable for : mentioned therein and to
information. The scope shall state the new product development, deliver Quality products to
certification information in GSDB Online.Such changes
include, but are not limited to:
types of products and services and provide product Maruti Suzuki • Initial certification.
justification for any requirements of this change, production process India Limited (“MSIL”); • Recertification.
modification, change of • That the contents of VQM are • Transfer of certification to a new Certification Body
international standard that the
production site, transfer, subject to change without • Certificate withdrawal.
organization determines is not applicable replacement and reform prior notice and thus we shall • Certificate cancellation without replacement.Page 11
to the scope the quality management at of 44 2024
of the tooling. ; regarding an
Copyright © 2024 Ford Motor Company.IATF 16949
system. inactive item for more than one all times, agree to refer only to
Certification WaiverFord may, at its option, fully waive
year; in discrepancy correction; the latest version of the VQM certain organizations from IATF 16949 certification.
changing the which is available at MSIL This waiver generally applies to those organizations
subcontractor (tiers) and / or in Vendor Portal (Extranet whose quality management system is acceptable
other situations where MBBras Portal); without certification to IATF 16949, but Ford still
deems it necessary to resubmit • That we shall ensure requires the suppliers to maintain their quality,
compliance with the VQM in delivery, and warranty performance level at no less
the
than an 80 point score in SIM
sample approval process (First all our dealings with MSIL and
while meeting Q1MSA requirements.
Sample Exam Report / Release of shall also Identification of candidate organizations for waiver
Production Process and ensure compliance of VQM by from IATF 16949 certification is the responsibility of
Product). our sub-vendor’s and sub- Ford. Verification and maintenance of waiver status is
Unless specifically exempted by Navistar
Director of Supplier Warranty, Supplier is
required to comply with the Navistar
Conformity to this international standard Supplier Warranty Requirements
(Document IW-001-SWR) for
may only be claimed if the requirements
the Product in effect at the time of Organizations shall record evidence of their certification
determined as not being applicable do not Supplier RFQ. Existing or separately to IATF 16949 in GSDB Online
affect the organization’s ability or concluded Supplier warranty available through Ford Supplier Portal
terms that contradict Navistar Supplier https://web.gsdb2.ford.com/GSDBeans/servlet/gsdbe
responsibility to ensure the conformity of ans.web.lib.GSDB
Conduct active parts re- Warranty Requirements (Document IW-
its products and services and 001-SWR) published as of the date of
vallidation if required must be
enhancement of customer satisfaction completed. Tooling return after
Supplier RFQ do not apply. Supplier
understands and agrees it is required to
life and where imperial tool be capable of fulfilling Navistar’s supplier
customer should approved warranty requirements for the Product
4.3.1 Determining the scope of the √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
4.3.1 quality management system- 4.3.1 √ √ √
supplemental QM/IAI/02
Supporting functions, whether on-site or
remote (such as design centers, corporate
headquarters, distribution centers), shall Such changes include, but are not
be included in the scope of the Quality limited to:
Management System (QMS). • Initial certification.
The only permitted exclusion for this • Recertification.
automotive QMS standard relates to the • Transfer of certification to a new
Certification Body
product design and development
• Certificate withdrawal.
requirements within ISO 9001, Section
• Certificate cancellation without
8.3. The exclusion shall be justified and replacement
maintained as documented information
(see ISO 9001, section 7.5)
Permitted exclusions do not include
4.3.2 4.3.2 customer-specific requirements CSR/I/001 4.3.2 √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
POTENTIAL
SUPPLIERS MUST
COMPLETE THE
Cp≥ 1.67
VOLVO GROUP
Cpk ≥1.33
SEM WITH AN
Monthly submission for Maru
“APPROVED”
MBST 2021 A parts decided parameter.
SCORE TO BE
When not feasible conduct Quality, Delivery and warranty score CONSIDERED FOR
Older version MBST 2020 as 100% Inspection. Min 80 point in SIM maintaining Q1
Safety and regulatory THE AWARDED
applicable in IATF OEM Cpk ≥1.67 Cpk ≥1.67 Certification.
Cpk ≥1.67 IATF 16949:2016 Certification and parts VOLVO GROUP
Requirements. The journey to Zero Defect Ppk≥ 1.33 Ppk≥ 1.33
Ppk≥ 1.33 Inform Tata Motors about changes in their QMS PPM ≤ 500, BIS/OEM-0 or < 5 update in Ford portal GSDB on-line.. Cp ≥1.67 BUSINESS
Customer-specific requirements shall PPM ≤ 40
will require high level of
registration status, such as new
PPM ≤ 500, BIS/OEM-0 or < 5
ISO 14001:2015 Certification Cpk≥ 1.67
Quality-related processes teamwork, commitment and MNC (Major Non conformity)-0 MNC (Major Non conformity)-0 Aston
be evaluated and included in the scope Cpk ≥1.67 When not feasible conduct 100% certificate, suspension, revocation or Cpk ≥1.33 requirements. The CSR audit is an
agreed upon with the Supplier, engagement and support in switchover to another certification body.
Martin
of the organization’s quality Ppk≥ 1.33 Inspection. Ppk≥ 1.67 Functional / Assy and onsite evaluation
based on the VDA RGA/MLA this endeavour by ensuring Ensure that their supplier base meets Tata IATF 16949:2016 or ISO 9001:2015 Certification IATF 16949:2016 or ISO 9001:2015 Certification Ford requires the suppliers to Score Cards
Important of supplier’s
management system. called “ Validation of Maturity
DCPA Assessment and report to
100 percent adherence to the Motors requirements ISO 14001:2015 Certification ISO 14001:2015 Certification maintain characteristics capability to meet
Level of New Parts" (VDA-RGA) requirements MSIL manual. Follow AIAG -APQP, SPC, PPAP, FMEA and MSA Follow AIAG -APQP, SPC, PPAP, FMEA and MSA their quality, delivery, and warranty
navistar VDA 6.3 P5-P7 assessment. Cp ≥1.33 Volvo Group’s
as described in this MBST. The requirements. requirements. performance level at no less than an 80
point score in SIM Cpk≥ 1.33 Supplier Code of
supplier must comply with these Maru A -Safety part
while meeting Q1MSA requirements. Conduct. The audit
processes throughout the
is designated to
project or series Maru A +Regulatory R
analyze
the risk of
Maru A +Process safety +
supplier’s activity
Regulatory R
with regards to
people, planet and
profit.
4.4 quality management system and √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
4.4 4.4 √ √ √
its processes QM/IAI/02
4.4.1 4.4.1 4.4.1 √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
Daimler India Honda SMGPL
IATF Hyundai Greaves Hero India Imperial Triumph Honda Dellorto India
Mercedes Benz Group Commercial FIAT India SML Maruti Suzuki India Limited Toyota Piaggio, Volvo Piaggio Bajaj DAF / Cars (Suzuki
Force Borgwar Stellantis Royal HSI All Internal
International Motors LLC Mahindra & Mahindra Auto Motorcycles & Hyzon Motors TVS Motor Company Commercial
CLAUSE ISO9001 & IATF 16949:2016 REQUIREMENTS GMI Automobiles VW Renault Group isuzu Tata Motors Limited Tata Cummins Ltd. Cummins Vehicles Ashok Leyland Motor Motor Cotton moto Simpson Ford Motors Voss Yamaha Industries motor Brembo Atul Auto MG Motor India Pvt. Ltd. SCANIA Aston Martin Automotive Volvo UFI Filters and external
(Mercedes AMG) Vehicles Pvt (Formerly NAVISTAR) Mahindra Vehicles (MSIL) India India Eicher Auto PACCAR India Gujarat Pvt. Motors ner (Ex PSA) Enfield Scooters India USA Inc.
pvt. Limited
Limited Vehicle Pvt.
stake holders
No Pvt Ltd Pvt Ltd India Limited corp Motors limited cycles Pvt. Ltd. Ltd
Ltd. Limited Ltd)
Yamaha Supplier Quality Manual, Royal Enfield SCANIA STD3868
Mahindra PACCARinc
Daimler Supplier Supplier Hero Moto Global Version -6 Doc Reference Supplier STANDARD
General Motors IATF 16949 COMMERCIAL VEHICLE STANDARD supplier Supplier Quality Supplier Quality "No Manual" Ford motor company Customer specific requirements Quality and Environment Aston Martin Volvo Group Supplier
Imperial Ref. Customer Specific
Quality Manual
IATF 16949: RENAULT GROUP MAN Truck & Bus SE / Scania CV AB / evaluation
assurance Supplier Quality Assurance manual CV, Tata Motors, Version General Supplier Manual, Procedure No Quality
"No Manual"
supplier code of
Corp Ltd
Supplier
No manual
IATF 16949:2016, Effective 01-Mar-2024 quality Reference : - RE-IMS- Quality
Specifications for Brembo Rev Date -28/11/2018, GI-0008 Supplier
Customer Specific Requirements of Released Aug 2020. Supplier General requirements Supplier 5 Star audit Supplier General 01276_15_00082 v6 EN Assurance Supplier Quality RASIC Chart General terms Lagonda Limited Quality Assurance Manual
Doc. Requirements. Customer-Specific- Customer-Specific Navistar Inc./ Volkswagen Truck & Bus standard, First
Mahindra manual.
Quality 3.3 Revised on Date 09. Jan 2024. Cummins Incorporated Cummins Incorporated conditions of Quality general_term SSC/001, Origin date manual, quality Assurance conduct Quality Ford Motor Company Customer-Specific Borgwarner Assurance Supplier COM-SQ- Supplies. May 2013 Edition. General Manual July 31, LOI
Issue 29, COMMERCIAL
and conditions Production
General T&C of Supplier Quality Assurance
Sixth Edition 2022.
quality
Mercedes-Benz AG Daimler India No Manual supplier 7th Purchasing adherence Quality purchase terms General Manual June 18, 2021 SQM-01 Manual VEHICLE STANDARD, purchase Manual Rev No "3" Date 27 Supplier Quality assurance
Posted Date: December 01, Requirements (CSRs) Requirements for use of Edition May Vendor Quality Assurance manual Fbd- I20310 Supplier Handbook Supplier Handbook contract for Manual s_of_purchas 30th April,2024, Issue Business 01.04.2022 and Assurance Requirements For use with PPAP Fourth Edition Supplier Quality Rev "02", Date 08.05.2013. purchasing
Assurance Customer manual Rev 2019, (Based on General Purchase for purchase of purchasing terms
Customer Specific Requirements and Vendor 2020
February 2022 commercial vehicles General purchasing of Volkswagen Group IATF 16949:2016 3rd CVS10- TRATON Customer Specific 2012.
evaluation Edition 4th Edition May 2023. Fbd- I20315 (Customer-Specific Requirements) (Customer-Specific Requirements) the supply of e_november_
terms &
Date 03rd May.2024. Vertical
requirements.
whistle blower
manual,
Manual
& conditions
Service PPAP First Edition, Effective 01-Jul-2023. manual, 3rd
terms and Rev 03, manual
FCA US LLC Supplier (SQAM001)
Procurement speciications Feb terms and CVS 10, Release Date HSI Automotive Nov 2023 Manual Rev 004, requirements,
terms & conditions standard, First Issued Manual, Conditions . specific 3, 22 Oct "Other terms and Rev “ 02” applicable. conditions Date- 06 Customer-Specific Quality Revision E – Global Honda agreement T &C 2020-03. goods. & conditions PARMA code India-56850
Effective Date: December 15, March 2022 Edition Nov 2023. Rud- I20313 Publication Date: Jan 11, 2023 Publication Date: Jan 11, 2023 works or 5th Edition 2022_edition Faridabad 3rd Edition Jan policy. Rev 1, Jan July 2019 Rev No “ 12” 2017, conditions. pvt. Limited – Date 20.12.2018 Rev “07”
code of Imperial Auto Industries Limited 2020
MBST 2021 DICV Faridabad
8AG3
Requirements Quality Assurance
Edition May Date: 30th I036, I149, I371, I250 Version 3.2 Lko -I20311 FBD-I000912 services. March 2019
02.04.2024
720094 requirements 2013. 2020.
conditions
Faridabad code
Effective
2017 HJMEA -Plot No 83 / sec 25-closed Dec 2019 Date
Requirements
Manual,
Revision Date:
APQP Guidelines April 2015 01.04.2022 SQM 2019) IATF 16949 Customer- 2022 PARMA code Bawal Plant -
Requirement for Purchased Parts & Faridabad 21472 27.10.2020.
. plants- 15659774 700454 2012. April 2023 . Released date 01.04.2021 " Date 01 01.04.2022 01.04.2021 for IATF 16949:2016 10 November 100435-Sanand, VEN-001131 (AMLPPTC2022) 57913
Plant II -650266385 / 00268377 Suppliers, Release date 2024-08 DI005, Nighojhe San-I66300 JSR-I0009 64446 IN0000I005 Chennai 137210105 650566115 Chennai - 30.06.2023 Version A, Edition Specific-Requirements 188138 VE000465
MERCEDES AMG - 15313588 DI 005 TM 00017 100079 08/31/2020. 5I10 June 2014. Publication Date: August 2017. 5FF0003I26 Ahmedabad Plant PARMA code IMT
Plant III- 00I02036 Pune DI005A, JSR -I30214 IN000PI061 112654 7205535 I250 Chennai code V009059G HJMEG -Plot No 14/6 2S35, Rev "04" Chennai-360006 100184 (CSRs) of Volkswagen V02471
DICV Chennai plant- 1908- TDWX I146 5, 2020 V2903 Faridabad Plant - 57810
Plant VII (42/28)-650317071 40921 -New code yet to release. Rudrapur Rudrapur -7201016 BI0003C Greater Dated Pune-350133 Group March 2022.
15687861 3217 89166 V10093 TMC 0101
DI005BX Noida- 01/08/2024
A00BYI02
would cause the most damage to Navistar The scorecard is a
brand, if they tool
failed, are classified as Special Product
for monitoring
Group (SPG) suppliers. These suppliers are
subject to supplier
these additional requirements: performance. The
a.) Special Product Group suppliers are scorecard
expected to achieve an ìAî green or ìBî is made available
yellow
to
classification utilizing VDA 6.3, before
The organization shall establish, award of business. suppliers to allow
implement, maintain and continually b.) Special Product Group Suppliers are Safety parts Economic and Legal them to
expected to achieve an ìAî green or ìrobust General terms and be proactive in
improve a quality management system, Special characteristics
Bî yellow classification (85% or higher) Testing Classification of critical characteristics (C of C): conditions of purchase:
addressing
including the processes needed and their Purpose to regulate EDI for E/E Classification of critical characteristics (C of C): 'GTC' (Direct Material –
utilizing VDA 6.3, before serial production. Special handling Classification of Characteristics is intended to serve production quality
data1( electronic form, For Classification of Characteristics is intended to serve General Terms And
interaction, in accordance with the Customer-specific requirements may include as a guide for the development of Conditions); issues.
executed by the Parties) and grades below A rating, supplier must as a guide for the development of
requirements of this international but not be limited to the following: supplier process quality plans - not to relieve Purchase contracts:
The scorecard can
the CAx/EDM (- Computer provide an improvement action plan to
Quality management systems supplier process quality plans - not to relieve "Purchase Contract";
standard. Navistar. suppliers of the responsibility to produce all also assist
Aided Processes Engineering Process techniques and process controls suppliers of the responsibility to produce all features Warranty Terms, after
The organization shall determine the c.) Special Product Group Suppliers are features Commercial Allocation of in reviewing
Data Management) process Identification and processing of critical parts to specification
processes needed for quality management
required to conduct annual VDA 6.3 self- to specification the Carmaker's Products; performance for
assessments and submit the results to and features RFQ specifications and
system and their application throughout Navistar. Beginning calendar 2022, Certification economic constraints.
negative quality
the organization, shall: submissions trends.
must be uploaded into Ivalua supplier
portal by June of each calendar year.
Exceptions
The information in
to be approved by the Navistar Supplier
Quality Director. the scorecard
d.) Special Product Group suppliers are provides a picture
required to submit critical product and of how Volvo
process Group views the
characteristics, SPC data, and other
supplier ability and
quality data requested by Navistar, into
capability. The
a) Determine the inputs required and the EDI / Quality standard / Design
outputs expected from these processes; data creation and routed
through IAI and Supplier.
b) Determine the sequence and
interaction of these processes;
A SUPPLIER CAN BE
PLACED IN A
SUPPLIER
c) Determine and apply the criteria and IMPROVEMENT
methods (including monitoring, The recommendations of VDA – PROGRAM BASED
ON PERFORMANCE
measurements and related performance VDA 4961/2, VDA 4950, VDA
FOR AN INDIVIDUAL
indicators) needed to ensure the effective 4951 and VDA 4955 are binding PART NUMBER,
operation and control of these processes; to the MULTIPLE PART
communication processing and NUMBER BASES OR
validation processes between ORGANIZATIONAL
supplier and MBBras PERFORMANCE.
Make processes -After
consultation, generation of CAD
data missing scopes or rework
performed by
supplier or any third-party it The goal of all
may have contracted, at Volvo
supplier´s account; and/or Group supplier
After consultation, generation of improvement
CAD data missing scopes or Suppliers with internal or programs are to
rework performed by initiate and drive
outsourced ìspecial processes,î as
third-party contracted by
identified by the Automotive improvement
MBBras, at supplier´s account.
Supplier liability before MBBras Industry Action Group (AIAG), are activities with
for losses and damage it may required to conform with relevant suppliers who are
cause MBBras due to AIAG Special Process documents performing below
nonperformance, in whole or in and assure minimum once / expectations.
part, of contractual obligations, annum (Audit) : CQI-9 Heat Treat
d) Determine the resources needed for
or failure to comply with Systems Assessment, CQI-11 Plating
these processes and ensure their term agreed upon in the
Systems Assessment, CQI-12
availability contract.
Coating Systems Assessment, CQI-
e) Assign the responsibilities and 15 Welding Systems
authorities for these processes; Assessment, CQI-17 Soldering
f) Address the risks and opportunities as Systems Assessment, CQI-23,
determined in accordance with the Molding System
requirement of 6.1; Assessment, CQI-27 Casting System
Assessment, and CQI-29 Brazing
Minimum CAx/EDI standard System
(hereinafter referred to as Assessment. In addition, CQI-19 Sub-
g) Evaluate these processes and "Standard Regulation”) is Tier Supplier Management Process
implement any changes needed to ensure defined in the Guidelines and CQI-28 Traceability
that these processes achieve their CAD handbook, module CS048. Guidelines or other standards
intended results Improve the processes The Standard Regulation is and/or guidelines specified on
and the quality management system. binding as long as no other product drawings / specifications or
specifications are required other contractual provisions must
within the obligations be met.
handbooks
4.4.1.1 Conformance of products and Procedure for 4.4.1.1
√ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
4.4.1.1 √ √ √
processes containment
ELV
Conflict Mineral
compliances
1.1.4.1 Restricted substances in delivered
parts and components / Reporting of part INGREDIENTS DISCLOSURE;
material composition SPECIAL WARNINGS AND
Suppliers are responsible, and shall have INSTRUCTIONS:
a documented routine, for monitoring the Declaration to Seller shall promptly furnish to
changes in the comply legal Buyer in such form and detail as
list of substances (GADSL-Global requirements. Buyer may direct from time to
Automotive Declarable Substance List), Country specific time: (a) a list of all ingredients Scania standard
according with CVS55. regulations to in the goods; (b) the amount of STD4400
The organization shall ensure The Suppliers are responsible for follow. all
RoHS, Conflict Mineral compliances “Prohibited and
conformance of all products and collecting Material Data Sheet (MDS)
RoHS, RoHS, RoHS, IMDS RoHS, RoHS, RoHS, RoHS, RoHS, RoHS, RoHS, RoHS, RoHS, RoHS, RoHS, RoHS, RoHS, RoHS, RoHS, IMDS RoHS, RoHS,
ingredients; and (c) information
restricted RoHS, RoHS, RoHS, WHEN REPORTING RoHS, RoHS, RoHS,
declarations from Suppliers RoHS, Conflict concerningany changes in or
processes, including service parts and REACH, RoHS RoHS, RoHS,
RoHS, Conflict RoHS, Conflict RoHS, Conflict even when Customer assigned/directed Conflict Conflict Conflict Conflict Conflict Conflict Conflict RoHS, Conflict Conflict Conflict Conflict Conflict Conflict Conflict Conflict Conflict Conflict Conflict Conflict Requirements. Conflict Conflict Mineral additions to such ingredients. substances in Conflict Conflict Conflict IN IMDS THE ONLY Conflict Conflict Conflict
RoHS, Conflict Mineral WEEE, Conflict Conflict RoHS, Conflict Mineral Conflict RoHS, Conflict Mineral Prior to and with the shipment Put data in IMDS
those that are outsourced, to all compliances Mineral
Mineral Mineral Mineral parts are involved.
Mineral
Mineral Mineral
compliances
Mineral Declarations on use of Persistent Organic RoHS, Conflict Mineral compliances RoHS, Conflict Mineral compliances Mineral Mineral Mineral Mineral Mineral Mineral Mineral Mineral Mineral
Mineral
Mineral Mineral Mineral RoHS, Conflict Mineral compliances Mineral Mineral Mineral Mineral Refer Clause 2.1 Mineral Mineral
compliances
compliances
of the goods, Seller agrees to
Scania products” - Mineral Mineral Mineral
(RoHS)
VOLVO GROUP ID Mineral Mineral Mineral
compliances compliances compliances MAN: The corresponding IMDS standard is compliance complia complian Pollutants (POPs) as per Stockholm Convention - complian complian complian complian compliances complianc complian complianc compliance complia complian complianc complian complian complian complian complianc compliance Upload in GADSL compliance compliance compliance NUMBER 46569 compliance compliance compliance
applicable customer, statutory, and compliances M 3212 and MAN 239. compliances compliances Honda Chemical
furnish to
s nces ces Current Imperial does not use Organic ces ces ces ces es ces es s nces ces es ces ces ces ces ELV Requirements es s Buyer, sufficiently in advance & REACH. s s s SHALL BE USED. s s s
regulatory requirements (See section Scania: A submission of the latest
pollutants.
substance of Shipment, sufficient warning RoHS, Conflict
accepted MDS by the Customer is required management
8.4.2.2) with each PPAP/PQA standard
and notice in writing (including
appropriate labels on the
Mineral
request. The corresponding IMDS standard (Motorcycles) goods, containers and packing) compliances
is STD4352 and CVS55. HES A 3056, of any
VWTB: The corresponding IMDS standard define symbol hazardous material that is an
is according to VDA 2 Chapter 8. HN, HR, etc) ingredient or a part of any of
Navistar: MPAPS B-50 Restricted Chemical the goods, together with such
substance applies, follow document SQ- special handling instructions as
011-PR. may be necessary to advise
Conflict Mineral compliances carriers,
Buyer, and their respective
SP/I/PU/012 employees of how to exercise
SP/I/DT/007S that measure of care and
P/I/RI/001 precaution that will best
VOLVO GROUP
Timing & MUST BE
handling through
NOTIFIED
k) Transfer of requirements with 2-4 Sub supp QA,
IMMEDIATELY IN
3-1 Stage control
regard to product safety throughout Apply the characteristics , 3-2 Process THE EVENT A NON-
Child part drawing as
the supply chain, including customer- required.
in D FMEA(If applicable), design, 3-9 CONFORMANCE
PFMEA, CP. Transition to OR POTENTIAL
designated sources (see section mass Prod., 4-1
CUSTOMER
8.4.3.1); Early mass Prod.
RISK IS IDENTIFIED
Quality Control
stages. Such as FMEA,
Control plan.
Lesson Learnt
should be maintain
m) Lessons learned for new product & matrix to be
introduction. made for
proeject. Refer
Clause 3.8.
6.2. Event Class 2 (Immobility)
If damage occurs, the vehicle
can be brought to a controlled
stop. An unplanned workshop
visit is
required due to immobility. (Not take sample size
possible to drive to workshop n=100 A Critical
unassisted.) minimum of 30 characteristics
6.3. Event Class 3 (Emergency data sets.
level Cpk >= 1.67
NOTE: Special approval is an additional Operation)
Process
A damage event requires that the Required SPC
approval by the function (typically the vehicle be brought into the Study Cpk >= 1.33 appropriate
customer) that is responsible to workshop. Unscheduled but or P=0.01 as checking frequency
unassisted trip to the workshop. mimimum On-going
approve such documents with safety-
6.4. Event Class 4 (Reduced Statistical Process
related content. Comfort, Minor Functional Further control
Control (SPC)
safety
Impairment Ppk analysis
characteristics
A damage event results only in a
section 5.1 of every 6 months
minor functional impairment. manual
The complaint is rectified during
a
scheduled workshop visit
(maintenance)/self-repair.
5 5 Leadership QM/IAI/02 5 √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
5.1 5.1 Leadership and commitment QM/IAI/02 5.1 √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
5.1.1 5.1.1 General QM/IAI/02 5.1.1 √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
Appointment of the
management
representative
accountable for
quality and quality
Top management shall demonstrate control managers in
charge for the
leadership and commitment with respect implementation of
to the quality management system by: specific quality
assurance
activities under the
management
representative
responsible for quality
a) Taking accountability for the
effectiveness of the quality management
system;
b) Ensuring that the quality policy and
quality objectives are established for the
quality management system and are
compatible with the context and strategic
direction of the organization;
c) Ensuring the integrative of the quality
management system requirements into
the organization’s business processes;
d) Promoting the use of the process
approach and risk-based thinking ;
e) Ensuring that the resources needed for
the quality management system are
available;
f) Communicating the importance of
effective quality management and of
conforming to the quality management
system requirements
g) Ensuring that the quality management
system achieves its intended results ;
Work
a) Identify and evaluate internal and Instruction for The organization shall communicate the
external risks to all manufacturing Contingency Should have Contingency Plan Cummins has a BRM process and suppliers are Cummins has a BRM process and suppliers are nature of
to handle risks. expected to participate in that expected to participate in that the problem to Ford and take immediate
processes and infrastructure Planning Ref.
actions to assure supply of product to Ford.
WI process. Please refer to Cummins Supplier Portal process. Please refer to Cummins Supplier Portal
equipment essential to maintain WI / V / PR / Refer Risk Assessment https://supplier.cummins.com for https://supplier.cummins.com for Note: Production interruption is defined as an
production output and to ensure that 007 Rev No chapter 30 information related to BRM process. information related to BRM process. inability to meet the Ford specified production
"01" Date capacity volume.
customer requirements are met;
10.08.2017
c) transportation resources;
Daimler India Honda SMGPL
IATF Hyundai Greaves Hero India Imperial Triumph Honda Dellorto India
Mercedes Benz Group Commercial FIAT India SML Maruti Suzuki India Limited Toyota Piaggio, Volvo Piaggio Bajaj DAF / Cars (Suzuki
Force Borgwar Stellantis Royal HSI All Internal
International Motors LLC Mahindra & Mahindra Auto Motorcycles & Hyzon Motors TVS Motor Company Commercial
CLAUSE ISO9001 & IATF 16949:2016 REQUIREMENTS GMI Automobiles VW Renault Group isuzu Tata Motors Limited Tata Cummins Ltd. Cummins Vehicles Ashok Leyland Motor Motor Cotton moto Simpson Ford Motors Voss Yamaha Industries motor Brembo Atul Auto MG Motor India Pvt. Ltd. SCANIA Aston Martin Automotive Volvo UFI Filters and external
(Mercedes AMG) Vehicles Pvt (Formerly NAVISTAR) Mahindra Vehicles (MSIL) India India Eicher Auto PACCAR India Gujarat Pvt. Motors ner (Ex PSA) Enfield Scooters India USA Inc.
pvt. Limited
Limited Vehicle Pvt.
stake holders
No Pvt Ltd Pvt Ltd India Limited corp Motors limited cycles Pvt. Ltd. Ltd
Ltd. Limited Ltd)
Yamaha Supplier Quality Manual, Royal Enfield SCANIA STD3868
Mahindra PACCARinc
Daimler Supplier Supplier Hero Moto Global Version -6 Doc Reference Supplier STANDARD
General Motors IATF 16949 COMMERCIAL VEHICLE STANDARD supplier Supplier Quality Supplier Quality "No Manual" Ford motor company Customer specific requirements Quality and Environment Aston Martin Volvo Group Supplier
Imperial Ref. Customer Specific
Quality Manual
IATF 16949: RENAULT GROUP MAN Truck & Bus SE / Scania CV AB / evaluation
assurance Supplier Quality Assurance manual CV, Tata Motors, Version General Supplier Manual, Procedure No Quality
"No Manual"
supplier code of
Corp Ltd
Supplier
No manual
IATF 16949:2016, Effective 01-Mar-2024 quality Reference : - RE-IMS- Quality
Specifications for Brembo Rev Date -28/11/2018, GI-0008 Supplier
Customer Specific Requirements of Released Aug 2020. Supplier General requirements Supplier 5 Star audit Supplier General 01276_15_00082 v6 EN Assurance Supplier Quality RASIC Chart General terms Lagonda Limited Quality Assurance Manual
Doc. Requirements. Customer-Specific- Customer-Specific Navistar Inc./ Volkswagen Truck & Bus standard, First
Mahindra manual.
Quality 3.3 Revised on Date 09. Jan 2024. Cummins Incorporated Cummins Incorporated conditions of Quality general_term SSC/001, Origin date manual, quality Assurance conduct Quality Ford Motor Company Customer-Specific Borgwarner Assurance Supplier COM-SQ- Supplies. May 2013 Edition. General Manual July 31, LOI
Issue 29, COMMERCIAL
and conditions Production
General T&C of Supplier Quality Assurance
Sixth Edition 2022.
quality
Mercedes-Benz AG Daimler India No Manual supplier 7th Purchasing adherence Quality purchase terms General Manual June 18, 2021 SQM-01 Manual VEHICLE STANDARD, purchase Manual Rev No "3" Date 27 Supplier Quality assurance
Posted Date: December 01, Requirements (CSRs) Requirements for use of Edition May Vendor Quality Assurance manual Fbd- I20310 Supplier Handbook Supplier Handbook contract for Manual s_of_purchas 30th April,2024, Issue Business 01.04.2022 and Assurance Requirements For use with PPAP Fourth Edition Supplier Quality Rev "02", Date 08.05.2013. purchasing
Assurance Customer manual Rev 2019, (Based on General Purchase for purchase of purchasing terms
Customer Specific Requirements and Vendor 2020
February 2022 commercial vehicles General purchasing of Volkswagen Group IATF 16949:2016 3rd CVS10- TRATON Customer Specific 2012.
evaluation Edition 4th Edition May 2023. Fbd- I20315 (Customer-Specific Requirements) (Customer-Specific Requirements) the supply of e_november_
terms &
Date 03rd May.2024. Vertical
requirements.
whistle blower
manual,
Manual
& conditions
Service PPAP First Edition, Effective 01-Jul-2023. manual, 3rd
terms and Rev 03, manual
FCA US LLC Supplier (SQAM001)
Procurement speciications Feb terms and CVS 10, Release Date HSI Automotive Nov 2023 Manual Rev 004, requirements,
terms & conditions standard, First Issued Manual, Conditions . specific 3, 22 Oct "Other terms and Rev “ 02” applicable. conditions Date- 06 Customer-Specific Quality Revision E – Global Honda agreement T &C 2020-03. goods. & conditions PARMA code India-56850
Effective Date: December 15, March 2022 Edition Nov 2023. Rud- I20313 Publication Date: Jan 11, 2023 Publication Date: Jan 11, 2023 works or 5th Edition 2022_edition Faridabad 3rd Edition Jan policy. Rev 1, Jan July 2019 Rev No “ 12” 2017, conditions. pvt. Limited – Date 20.12.2018 Rev “07”
code of Imperial Auto Industries Limited 2020
MBST 2021 DICV Faridabad
8AG3
Requirements Quality Assurance
Edition May Date: 30th I036, I149, I371, I250 Version 3.2 Lko -I20311 FBD-I000912 services. March 2019
02.04.2024
720094 requirements 2013. 2020.
conditions
Faridabad code
Effective
2017 HJMEA -Plot No 83 / sec 25-closed Dec 2019 Date
Requirements
Manual,
Revision Date:
APQP Guidelines April 2015 01.04.2022 SQM 2019) IATF 16949 Customer- 2022 PARMA code Bawal Plant -
Requirement for Purchased Parts & Faridabad 21472 27.10.2020.
. plants- 15659774 700454 2012. April 2023 . Released date 01.04.2021 " Date 01 01.04.2022 01.04.2021 for IATF 16949:2016 10 November 100435-Sanand, VEN-001131 (AMLPPTC2022) 57913
Plant II -650266385 / 00268377 Suppliers, Release date 2024-08 DI005, Nighojhe San-I66300 JSR-I0009 64446 IN0000I005 Chennai 137210105 650566115 Chennai - 30.06.2023 Version A, Edition Specific-Requirements 188138 VE000465
MERCEDES AMG - 15313588 DI 005 TM 00017 100079 08/31/2020. 5I10 June 2014. Publication Date: August 2017. 5FF0003I26 Ahmedabad Plant PARMA code IMT
Plant III- 00I02036 Pune DI005A, JSR -I30214 IN000PI061 112654 7205535 I250 Chennai code V009059G HJMEG -Plot No 14/6 2S35, Rev "04" Chennai-360006 100184 (CSRs) of Volkswagen V02471
DICV Chennai plant- 1908- TDWX I146 5, 2020 V2903 Faridabad Plant - 57810
Plant VII (42/28)-650317071 40921 -New code yet to release. Rudrapur Rudrapur -7201016 BI0003C Greater Dated Pune-350133 Group March 2022.
15687861 3217 89166 V10093 TMC 0101
DI005BX Noida- 01/08/2024
A00BYI02
As defined in RGPQP:
Measurement Systems Analysis (MSA) is required Measurement Systems Analysis (MSA) is required All gauges used for checking Ford components/parts
Statistical studies shall be conducted The gauge must be for any measuring equipment for any measuring equipment per the control plan shall have a gauge
to analyses the variation present in the confirmed by the used to inspect the special characteristics identified used to inspect the special characteristics identified R&R performed in accordance with the appropriate
Measurement
methods described by the latest AIAG
supplier for Bias/ on the Cummins drawing or as defined by the on the Cummins drawing or as defined by the
results of each type of inspection, Linearity/ Cummins SQE. The Anova method, as detailed in Cummins SQE. The Anova method, as detailed in
Measurement Systems Analysis Manual (MSA) to systems capability
MSA Most current version. determine measurement system variability. (according to
measurement, and test equipment Repeatability/Repro
MSA 4th edition is the preferred method for MSA 4th edition is the preferred method for The Gauge R&R is to be completed using Ford parts.
ducibility and/or 01446_18_01691)
system identified in the control plan. R&R Study acceptance other methods as submittal to Cummins. MSA acceptance limits shall submittal to Cummins. MSA acceptance limits shall The control plan identifies which gauges are used for
each measurement. This capability is
Procedure for be as follows: be as follows:
The analytical methods and New measuring systems required and Any measurement equipment not meeting the MSA measured through
statistical RR ≤ 20% -Approved, >20% not detailed on the % Tol Ratio (Precision to Tolerance) % Tol Ratio (Precision to Tolerance) guidelines must be approved by STA.
acceptance criteria used shall conform Gauge
R&R reports
study approved P/T Ratio is less than 10% is acceptable P/T Ratio is less than 10% is acceptable Family of gauges
(Repeatability
to those in reference manuals on Specification Sheet.
The supporting
P/T Ratio between 10 and 30% is marginally P/T Ratio between 10 and 30% is marginally Where multiple gauges of the same make, model,
size, method of use and application (including and
Used measuring systems RR ≤ 30% -
measurement system analysis. Other Accepted >30%-Not approved.
documentation acceptable acceptable range of use) are implemented for the same part, use Reproducibility).
should be submitted P/T Ratio greater than 30% is unacceptable. P/T Ratio greater than 30% is unacceptable. of a single gauge R&R covering those
analytical methods and acceptance multiple gauges (family of gauges) requires STA
Refer PPAP
with the Gauge % R&R (Repeatability and Reproducibility) % R&R (Repeatability and Reproducibility) Requirments
criteria may be used if approved by the Approval Sheet to R&R less than 10% is acceptable R&R less than 10% is acceptable
approval.
Groupe Renault- Parts and operators for Gauge R&R studies
customer. Nissan on request
R&R between 10% and 30% is marginally R&R between 10% and 30% is marginally At a minimum:
acceptable acceptable Variable gauge studies should utilize a minimum of 10
parts, 3 operators and 3 trials.
R&R greater than 30% is unacceptable R&R greater than 30% is unacceptable Attribute gauge studies should utilize a minimum of 50
Suppliers must assure PPAP
Records of customer acceptance of approved processes are not
parts, 3 operators, 3 trials.
See the Ford PPAP customer specifics for details on
alternative methods shall be retained changed, or bypassed, due to attribute gauge measurement systems
analysis requirements
along with results from alternative equipment malfunction, or any https://web.qpr.ford.com/sta/Ford_Specifics_for_PPA
measurement systems analysis (see other reason. If such need arises, P.pdf
an effective alternate process must
section 9.1.1.1). be established and qualified
NOTE
Prioritization of MSA studies should
focus on critical or special product or WI MSA Study MSA study
process characteristics.
Calibration √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
7.1.5.2 7.1.5.2 Measurement traceability procedure 7.1.5.2 √ √ √
SPDD003
The Supplier shall have a documented process for The Supplier shall have a documented process for
managing calibration/verification records. Records managing calibration/verification records. Records
a) calibrated or verified, or both, at specified of the calibration/verification activity for all gauges of the calibration/verification activity for all gauges
intervals, or prior to use, against and measuring and test equipment (including and measuring and test equipment (including
measurement standards traceable to employee-owned equipment relevant for employee-owned equipment relevant for
international or national measurement measuring, Cummins-owned equipment, or on-site measuring, Cummins-owned equipment, or on-site
standards; when no such standards exist, the supplier owned equipment) needed to provide supplier owned equipment) needed to provide
basis used for calibration or verification shall evidence of conformity to internal requirements, evidence of conformity to internal requirements,
be retained as documented information; legislative and legislative and
regulatory requirements, and Cummins-defined regulatory requirements, and Cummins-defined
requirements shall be retained. requirements shall be retained.
7.5.3.2 √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
7.5.3.2.2 Engineering specifications 7.5.3.2.2 √ √ √
.2
The organization shall have a
documented process describing the
review, distribution, and
SP/I/DD/004 The basic Quality
implementation of all customer specifications of the parts
engineering standards/specifications Suppliers are required to ensure
purchased by MSIL from
compliance to Federal Motor FETE Sheet should
and related revisions based on Vehicle Safety Standards (FMVSS)
vendors shall be defined
be filled. Refer
customer schedules, as required. through one or more of the
requirements at the time of PPAP Clause No. 3.4
following documents:
When an engineering a) Standards, Drawings,
standard/specification change results Specifications, Mutually
in a product design change, refer to the agreed standards, in
accordance with this
requirements in ISO 9001, section manual and / or any other
8.3.6. When an engineering DVP&R report document made by MSIL and
standard/specification change results provided to the vendors.
SP/I/DD/004 b) Drawings, specifications
in a product realization process FMVSS related characteristics in
the Design Verification Plan (DVP) and documents made in
change, refer to the requirements in accordance with this manual
and control plan (CP).
section 8.5.6.1. The organization shall and other
retain a record of the date on which documents made by the
vendors and approved by
each change is implemented in MSIL.
production. Implementation shall c) National or International
include updated documents. standards such as IS, JIS,
JASO, SAE etc. which are
Review should be completed within 10
mutually
working days of receipt of notification acceptable to the vendors
of engineering SP/I/DD/009 Variable Characteristics Cpk Study. and MSIL (in such cases
standards/specifications changes. SP/I/DD/010 Attribute when asked by customer. where items mentioned in a
& b) are not
NOTE A change in these available but National /
standards/specifications may require International standards are
an updated record of customer available).
production part approval when these Results of the test plan must be Follow steps preparation and
specifications are referenced on the reviewed with Navistar Engineering control of drawing in Chapter
design record or if they affect when tests are complete. The 4.
documents of the production part completed DVP&R test summary
must be signed by Navistar
approval process, such as control plan, SP/I/DD/009 Engineering to indicate awareness
risk analysis (such as FMEAs), etc. SP/I/DD/010 and acceptance of the test results.
8 8 operation 8 √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
8.1 Operational planning and control- √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
8.1 8.1 √ √ √
supplemental
Implementation of
Statement of Work APQP, plan PPAP requireents
Appropriate to the organization’s communication and of Imperial and
Notifiation to
APQP responsibilities, the organization shall monitoring Suppliers with
Certification meet the requirements
PFEP IMDS by the
bodies in-case of of the Statement of Work(s). There may
The organization shall plan, implement and Feasibility Ensure SQD-QFOR, supplier after the
poor be an Engineering Statement of Work
PDP monitor and notify serial order
control the processes (see 4.4) needed to performance like (available from
Design negative results affect was received and
meet the requirements for the provision of serious quality the Ford Product Development
Development Engineer), an Assembly Statement of Development. latest 4 weeks
product and services and to implement the problem, quality
Product / Work, a Manufacturing prior to the PPAP
actions determined in clause 6, by: alarm not met
Process Statement of Work or other types Implement the PFC, request date and
(PPM, Ranking)
IAI shall keep the test validation available from the appropriate Ford including PPAP -FMEA, according to
weak ASES result, organization. See the
plan/DVP&R up-to-date during Product Launch CP, DVPR, R@R, MSA, Scania
etc. Global Product Development System
the development, series SPC, Sub-supplier level 3 IMDS Reporting
(GPDS) for specific timing. documents, Process
preparation Standard
SP/I/RI/002 and series production phases. audit as required, STD4352,
APQP
The External Supplier APQP/PPAP Readiness
Assessment (Schedule A) is available through
https://web.qpr.ford.com/sta/APQP.html
The organization shall submit completed
Schedule A’s as specified in the Schedule A
notification letter for each program (monthly
and after any significant change in APQP
status).
This applies to priority and non-priority
Ensure packing
suppliers, see Supplier Engagement Process specification.
a) determining the requirements for the on Mass production
products and services; https://web.qpr.ford.com/sta/GPDSSupplierEn control,
gagement.html
Even if the organization has not received a
Schedule A notification letter for a program
but has
New Tooled End Items (NTEIs) for a Ford
program launch, the organization is still
required to
complete a Schedule A for each program
milestone for all NTEIs and retain the final
SP/I/QA/001 Schedule A
SP/I/QA/002 in the PPAP file for the life of part (production
c) determining the resources needed to obtains approval on the results from the Ford
achieve conformity to the product and PD
Engineer with confirmed acceptance of parts.
services requirements; If prototype parts are not fully compliant to
specification, Ford PD Engineering can
d) implementing control of the processes in approve use of the part with a WERS Alert.
accordance with the criteria; The organization should use the APQP/PPAP
Evidence Workbook to record prototype part
e) determining, maintaining and retaining data
documented information to the extent for Ford PD review. The APQP/PPAP Evidence
Workbook is available through
necessary: https://web.qpr.ford.com/sta/APQP.html .
Prototype Tooling
1) to have confidence that the processes To dispose of Prototype Tooling, the
have been carried out as planned; organization must contact Global Asset
Management
(GAM) within 30 days after PPAP2 completion
2) To demonstrate the conformity of and request a Prototype Tooling Disposal
products and services to their requirements. form.
The organization submits the completed form
to the Ford PD Engineering supervisor for
The output of this planning shall be suitable approval and the approved form is to be
for the organization’s operations. returned to GAM for disposal authorization
and scrap
The organization shall control planned Validate the processing.
changes and review the consequences of change before Organization(s) must contact GAM via email:
[email protected]
unintended changes, taking action to mitigate implementation. (Organizations with Tooling in Europe, contact
GAM at [email protected])
The organization shall ensure that outsourced
processes are controlled (see 8.4). SP/I/RI/001
SP/I/PU/011
8.1.1 Operational planning and √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
8.1.1 8.1.1 √ √ √
control-supplemental
When planning for product realization, Follow TML APQP requirements
Follow the AIAG APQP
manual
the following topics shall be included: 5 Phases as per customer
manual 2.2 APQP for 5
2 days stock at
a) Customer product requirements phases.
Scania and at
and technical specifications; A) Phase 1: RFQ. Plan and Imperial
define program
B) Phase 2:
The STD4172
Product/Process “Scania Logistic
development Manual” defines
C) Phase 3: Creation of all requirements
specific tools and
production of the first off- and procedures
b) Logistics requirements; tool parts. related to
D) Phase 4: the handling of
Product/process try out.
E) Phase 5: Ramp-up
forecast-, call off
information and
delivery of goods
to Scania.
SP/I/DT/001
APQP
c) Manufacturing feasibility; SP/I/DD/009
Feasibility
SP/I/DD/010
d) Project planning (refer to ISO 9001,
section 8.3.2);
e) Acceptance criteria.
The resources identified in ISO 9001,
section 8.1 c), refer to the required
verification, validation, monitoring, SP/I/QA/001
measurement, inspection, and test SP/I/QA/002
activities specific to the product and
the criteria for product acceptance.
8.1.2 8.1.2 Confidentiality 8.1.2 √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
The organization shall ensure the
confidentiality of customer-contracted SP/I/DD/004
products and projects under & Customer
development, including related product Contracts
information.
8.2 requirements for products and √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
8.2 8.2 √ √ √
services
8.2.1 8.2.1 Customer communication SP/I/SA/001 8.2.1 √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
8.2.3.2
The organization shall retain documented 8.2.3.2
√
√
√
√ √
√ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
information as applicable
8.2.3.2 The organization shall retain
documented information as applicable:
a) On the results of the review;
b) On any new requirements for the
products and services.
SP/I/DT/001 √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
8.2.4 Changes to requirements for the
8.2.4 SP/I/DD/009 8.2.4 √ √ √
product and services SP/I/DD/010
b) the required process stages, including First Sample Submission -PIST PPAP
Closure of IRMR from supplier side considered as PIST
applicable design and development reviews;
PPAP, Customer touch points & performance
c) the required design and development parameters are verified. Inspection report generated
verification and validation activities; with supplier sign off. Note: PIST acceptance
guideline is100 % score for bought parts & 80 % for
Daimler India Honda SMGPL
IATF Hyundai Greaves Hero India Imperial Triumph Honda Dellorto India
Mercedes Benz Group Commercial FIAT India SML Maruti Suzuki India Limited Toyota Piaggio, Volvo Piaggio Bajaj DAF / Cars (Suzuki
Force Borgwar Stellantis Royal HSI All Internal
International Motors LLC Mahindra & Mahindra Auto Motorcycles & Hyzon Motors TVS Motor Company Commercial
CLAUSE ISO9001 & IATF 16949:2016 REQUIREMENTS GMI Automobiles VW Renault Group isuzu Tata Motors Limited Tata Cummins Ltd. Cummins Vehicles Ashok Leyland Motor Motor Cotton moto Simpson Ford Motors Voss Yamaha Industries motor Brembo Atul Auto MG Motor India Pvt. Ltd. SCANIA Aston Martin Automotive Volvo UFI Filters and external
(Mercedes AMG) Vehicles Pvt (Formerly NAVISTAR) Mahindra Vehicles (MSIL) India India Eicher Auto PACCAR India Gujarat Pvt. Motors ner (Ex PSA) Enfield Scooters India USA Inc.
pvt. Limited
Limited Vehicle Pvt.
stake holders
No Pvt Ltd Pvt Ltd India Limited corp Motors limited cycles Pvt. Ltd. Ltd
Ltd. Limited Ltd)
Yamaha Supplier Quality Manual, Royal Enfield SCANIA STD3868
Mahindra PACCARinc
Daimler Supplier Supplier Hero Moto Global Version -6 Doc Reference Supplier STANDARD
General Motors IATF 16949 COMMERCIAL VEHICLE STANDARD supplier Supplier Quality Supplier Quality "No Manual" Ford motor company Customer specific requirements Quality and Environment Aston Martin Volvo Group Supplier
Imperial Ref. Customer Specific
Quality Manual
IATF 16949: RENAULT GROUP MAN Truck & Bus SE / Scania CV AB / evaluation
assurance Supplier Quality Assurance manual CV, Tata Motors, Version General Supplier Manual, Procedure No Quality
"No Manual"
supplier code of
Corp Ltd
Supplier
No manual
IATF 16949:2016, Effective 01-Mar-2024 quality Reference : - RE-IMS- Quality
Specifications for Brembo Rev Date -28/11/2018, GI-0008 Supplier
Customer Specific Requirements of Released Aug 2020. Supplier General requirements Supplier 5 Star audit Supplier General 01276_15_00082 v6 EN Assurance Supplier Quality RASIC Chart General terms Lagonda Limited Quality Assurance Manual
Doc. Requirements. Customer-Specific- Customer-Specific Navistar Inc./ Volkswagen Truck & Bus standard, First
Mahindra manual.
Quality 3.3 Revised on Date 09. Jan 2024. Cummins Incorporated Cummins Incorporated conditions of Quality general_term SSC/001, Origin date manual, quality Assurance conduct Quality Ford Motor Company Customer-Specific Borgwarner Assurance Supplier COM-SQ- Supplies. May 2013 Edition. General Manual July 31, LOI
Issue 29, COMMERCIAL
and conditions Production
General T&C of Supplier Quality Assurance
Sixth Edition 2022.
quality
Mercedes-Benz AG Daimler India No Manual supplier 7th Purchasing adherence Quality purchase terms General Manual June 18, 2021 SQM-01 Manual VEHICLE STANDARD, purchase Manual Rev No "3" Date 27 Supplier Quality assurance
Posted Date: December 01, Requirements (CSRs) Requirements for use of Edition May Vendor Quality Assurance manual Fbd- I20310 Supplier Handbook Supplier Handbook contract for Manual s_of_purchas 30th April,2024, Issue Business 01.04.2022 and Assurance Requirements For use with PPAP Fourth Edition Supplier Quality Rev "02", Date 08.05.2013. purchasing
Assurance Customer manual Rev 2019, (Based on General Purchase for purchase of purchasing terms
Customer Specific Requirements and Vendor 2020
February 2022 commercial vehicles General purchasing of Volkswagen Group IATF 16949:2016 3rd CVS10- TRATON Customer Specific 2012.
evaluation Edition 4th Edition May 2023. Fbd- I20315 (Customer-Specific Requirements) (Customer-Specific Requirements) the supply of e_november_
terms &
Date 03rd May.2024. Vertical
requirements.
whistle blower
manual,
Manual
& conditions
Service PPAP First Edition, Effective 01-Jul-2023. manual, 3rd
terms and Rev 03, manual
FCA US LLC Supplier (SQAM001)
Procurement speciications Feb terms and CVS 10, Release Date HSI Automotive Nov 2023 Manual Rev 004, requirements,
terms & conditions standard, First Issued Manual, Conditions . specific 3, 22 Oct "Other terms and Rev “ 02” applicable. conditions Date- 06 Customer-Specific Quality Revision E – Global Honda agreement T &C 2020-03. goods. & conditions PARMA code India-56850
Effective Date: December 15, March 2022 Edition Nov 2023. Rud- I20313 Publication Date: Jan 11, 2023 Publication Date: Jan 11, 2023 works or 5th Edition 2022_edition Faridabad 3rd Edition Jan policy. Rev 1, Jan July 2019 Rev No “ 12” 2017, conditions. pvt. Limited – Date 20.12.2018 Rev “07”
code of Imperial Auto Industries Limited 2020
MBST 2021 DICV Faridabad
8AG3
Requirements Quality Assurance
Edition May Date: 30th I036, I149, I371, I250 Version 3.2 Lko -I20311 FBD-I000912 services. March 2019
02.04.2024
720094 requirements 2013. 2020.
conditions
Faridabad code
Effective
2017 HJMEA -Plot No 83 / sec 25-closed Dec 2019 Date
Requirements
Manual,
Revision Date:
APQP Guidelines April 2015 01.04.2022 SQM 2019) IATF 16949 Customer- 2022 PARMA code Bawal Plant -
Requirement for Purchased Parts & Faridabad 21472 27.10.2020.
. plants- 15659774 700454 2012. April 2023 . Released date 01.04.2021 " Date 01 01.04.2022 01.04.2021 for IATF 16949:2016 10 November 100435-Sanand, VEN-001131 (AMLPPTC2022) 57913
Plant II -650266385 / 00268377 Suppliers, Release date 2024-08 DI005, Nighojhe San-I66300 JSR-I0009 64446 IN0000I005 Chennai 137210105 650566115 Chennai - 30.06.2023 Version A, Edition Specific-Requirements 188138 VE000465
MERCEDES AMG - 15313588 DI 005 TM 00017 100079 08/31/2020. 5I10 June 2014. Publication Date: August 2017. 5FF0003I26 Ahmedabad Plant PARMA code IMT
Plant III- 00I02036 Pune DI005A, JSR -I30214 IN000PI061 112654 7205535 I250 Chennai code V009059G HJMEG -Plot No 14/6 2S35, Rev "04" Chennai-360006 100184 (CSRs) of Volkswagen V02471
DICV Chennai plant- 1908- TDWX I146 5, 2020 V2903 Faridabad Plant - 57810
Plant VII (42/28)-650317071 40921 -New code yet to release. Rudrapur Rudrapur -7201016 BI0003C Greater Dated Pune-350133 Group March 2022.
15687861 3217 89166 V10093 TMC 0101
DI005BX Noida- 01/08/2024
A00BYI02
Supplier must have advanced guideline is100 % score for bought parts & 80 % for
frame assembly
APQP or VDA RGA / MLA quality
d) the responsibilities and authorities Final samples submission -PIPC PPAP
planning, following all stages of These parts are made from off tool off process as per
involved in the design and developments
the project agreed PFD. Process capability for CTQ
process;
until the release of the product parameters to be initiated on production intended
for series production. tool/process. Process capability study & Inspection
report (IR) to be submitted by supplier.
e) the internal and external resources needs Provide PPAP process improvement actions initiated after
for the design and developments of products resources for process visit.
and services project. Production Trial Run
The supplier should perform production readiness
f) the need for involvements for subsequent reviews and trials internally prior to the start of
provision of product and services; production for a minimum of two hours for all purchased
parts or as required by Tata Motors. The
g) the need to control interfaces between production trial run must meet overall efficiency, scrap,
persons involved in the design and and downtime targets.
Production trial run will ensure that process controls,
developments process; machine checklists, cycle times, work standards,
h) the requirements for subsequent inspection standards, capacity, downtime, consumable
provision of products and services; tooling, spare parts, SPC capabilities,
i) the level of control expected for the changeover procedures and instructions,
subcomponent PPAP approvals and inspections,
design and development process by gauging,
customers and other relevant interested corrective actions for downtime, scrap & efficiency, and
parties; packaging requirements are in place. The
The documented information needed to APQP may supplier must resolve all non-conformances found
during PTR prior to start of production. The supplier
demonstrate that design and development monitor in DICV will coordinate with Tata Motors to allow to witness the
requirements have been met. portal subject trials if requested by Tata Motors.
SP/I/DT/001 √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
8.3.2.1 Design and development
8.3.2.1 SP/I/DD/009 8.3.2.1 √ √ √
planning — supplemental SP/I/DD/010
FMEA and Control Plan Development
FMEAs and Controls Plans shall ensure
that the manufacturing process
complies with Critical to
Quality process requirements as
specified in the Supplier
Manufacturing Health Charts located
at
8.3.2.1 Design https://web.qpr.ford.com/sta/Supplier
and _Manufacturing_Health_Charts.html .
The organization shall ensure that development Acceptance required for Inverted Ensure subsupplier APQP
design and development planning planning – Delta parts as follows
supplemental Process FMEA(s) and Control plan(s) for
include all affected stakeholder within VWAG requires
Provide inverted delta component(s) require planning;
the organization and as appropriate, its all Suppliers to Ford Engineering
resource for - requirement re-
supply chain. Example of areas for implement the & STA acceptance.
New Projects. examination;
Maturity Level For all parts where the organization is
using such as multidisciplinary Assurance
- feasibility verification;
Design Responsible - audits/re-examinations
approach include but are not limited to process (QPN-I) Design FMEA(s) prepared by design - validations
the following: See: Formel-Q- responsible organizations requires
konkret Ford Engineering
(Chapter 3.1) acceptance.
Acceptance of revisions to these
documents after initial acceptance per
the above is also
required. Ford reserves the right to
require acceptance of FMEA and/or
control plans for any
part from any organization.
Advanced APQP
or
VDA RGA / MLA quality planning DFMEA inputs must include warranty
At the time the PPAP is
issues, customer concerns, lessons
approved by Brembo, QFOR
Penalty $3000.00 for the delays and learned, and address past Global 8D
audits the Supplier's
disapproval of the samples VWAG requires concerns. The DFMEA must be reviewed APQP PSA audit for
production process
with Navistar to ensure completeness and The activity has the following 10 key elements
AIAG APQP all Suppliers to 1. Quick Response Teams
carrying out a process audit
Retention requirements and accuracy of content. A single DFMEA may
manual, truck implement the Refer using a dedicated checklist
submission levels will be performed be acceptable for a family of parts when a. Quick Response Process
(M.W – 217 “Supplier Process
Industry Maturity Level b. Problem Solving 8.3.2.1 Design and development
a) Project management (for example, according to risk analysis and risk approved by the Navistar Supplier Quality
Audit”),
rating specific Assurance ANPQP Representative. c. Lessons Learned planning — supplemental assessing the following
APQP or VDA-RGA); (“A” - high risk, “B” - medium risk and requirement, process (QPN-I) 2. Control of Non-Conforming Product Page No 21-24 in ford manual points:
“C” - low risk), according to VDA 2, CCs/SCs, safety, and regulatory 3. Quality Gate
APQP process See: Formel-Q- 4. Standardized Operations
• sub-Supplier management;
which determine which characteristics must be identified by
and follow, konkret • control of supplies;
documents, reports, notes and appropriate symbols. These 5. Standardized Operator Training
• management of technical
samples should be sent MBBras for (Chapter 3.1) characteristics and identifications must 6. Error Proofing
Customer documentation;
the release of the production and flow to the PFMEA, control plan, work 7. Layered Process Audits
• FMEA and Control Plans;
product process, as well as informing instructions, and flow down to the sub-tier 8. RPN Risk Reduction (Reverse FMEA)
• process documentation;
the need for inspection of support suppliers, as appropriate. 9. Contamination Control
• personnel training and
data at supplier (ANNEX 1 -samples 10. Supply Chain Management
qualification;
Submission level as per VDA 2
• working conditions;
Defined and measurable *Classification of
• product and process
Characteristics (CTQ)
control;
* Appearance, performance and material testing
• management of
specifications
performance indicators;
* Geometric Dimensioning & Tolerance (GD&T)
• identification of product,
b) Product and manufacturing process FIFO and traceability;
• maintenance management;
design activities(for example, DFM or • managing non conformities;
DFA) • managing measurement
instruments;
Such as consideration of the use of • qualification of internal
alternative designs and manufacturing processes.
process;
c) Development and review of
product designs risk analysis (FMEAs),
including actions to reduce potential PFMEA Do risk Analysis
risks; DFMEA (If applicable) FMEA
following: frequencies
during the safe launch timeframe
frequencies
during the safe launch timeframe
Supplier shall notify Cummins of any changes within Supplier shall notify Cummins of any changes within
their management structure within two weeks their management structure within two weeks
The organizations shall apply controls to the APQP of changes taking effect. This includes changes in of changes taking effect. This includes changes in
design and development process to ensure Change ownership as well as any changes to contacts ownership as well as any changes to contacts
that: management related to doing business with Cummins. related to doing business with Cummins.
The organization shall ensure that externally IAI must ensure the capacity of
the subcontractors (tiers) to
provided processes, products and services do
meet the deadlines
not adversely affect the organization’s ability for development and delivery of
to consistently deliver conforming product lots, production capacity and ISO 9001 / IATF 16949,
and services to its customers. quality assurance. Implement ISO 14001
requirements.
The organization shall:
a) ensure that externally the provided
processes remain within the control for its
quality managements system;
b) define both the controls that it intends to
apply to an external provider and those
intends to apply to the resulting output;
c) take into consideration
1) the potentials impact of the externally
Suppliers must require APQP from
provided processes, products and services on
their sub-contractors and have the
the organization’s ability to consistently meet
records available for
customer and applicable statutory and review by Navistar.
regulatory requirements;
2) the effectiveness of the controls applied
by the external provider;
Approval of PPAP.
d) determine the verification, or other Procurement
Review, and disposition sub-tier
activities, necessary to ensure that the specification as per
submitted APQP /PPAP documents,
externally provided processes, products and customer product needs
and ensure all Navistar
services met requirements. and fulfilment.
requirements are met.
8.4.2.1 Type and extent of control- SP/I/PU/003
√ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
8.4.2.1 8.4.2.1 √ √ √
supplemental SP/I/PU/011
The organization shall have a
documented process to identify
outsourced processes and to select the
types and extent of controls used to
verify conformity of externally
provided products, processes, and
service to internal (organizational) and
external customer requirements.
The process shall include the criteria
and actions to escalate or reduce the
types and extent of controls and
development activities based on
supplier performance and assessment
of product, material, or service risks.
8.4.2.2 Statutory and regulatory SP/I/DT009
√ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
8.4.2.2 8.4.2.2 √ √ √
requirements SP/I/DT010
Daimler India Honda SMGPL
IATF Hyundai Greaves Hero India Imperial Triumph Honda Dellorto India
Mercedes Benz Group Commercial FIAT India SML Maruti Suzuki India Limited Toyota Piaggio, Volvo Piaggio Bajaj DAF / Cars (Suzuki
Force Borgwar Stellantis Royal HSI All Internal
International Motors LLC Mahindra & Mahindra Auto Motorcycles & Hyzon Motors TVS Motor Company Commercial
CLAUSE ISO9001 & IATF 16949:2016 REQUIREMENTS GMI Automobiles VW Renault Group isuzu Tata Motors Limited Tata Cummins Ltd. Cummins Vehicles Ashok Leyland Motor Motor Cotton moto Simpson Ford Motors Voss Yamaha Industries motor Brembo Atul Auto MG Motor India Pvt. Ltd. SCANIA Aston Martin Automotive Volvo UFI Filters and external
(Mercedes AMG) Vehicles Pvt (Formerly NAVISTAR) Mahindra Vehicles (MSIL) India India Eicher Auto PACCAR India Gujarat Pvt. Motors ner (Ex PSA) Enfield Scooters India USA Inc.
pvt. Limited
Limited Vehicle Pvt.
stake holders
No Pvt Ltd Pvt Ltd India Limited corp Motors limited cycles Pvt. Ltd. Ltd
Ltd. Limited Ltd)
Yamaha Supplier Quality Manual, Royal Enfield SCANIA STD3868
Mahindra PACCARinc
Daimler Supplier Supplier Hero Moto Global Version -6 Doc Reference Supplier STANDARD
General Motors IATF 16949 COMMERCIAL VEHICLE STANDARD supplier Supplier Quality Supplier Quality "No Manual" Ford motor company Customer specific requirements Quality and Environment Aston Martin Volvo Group Supplier
Imperial Ref. Customer Specific
Quality Manual
IATF 16949: RENAULT GROUP MAN Truck & Bus SE / Scania CV AB / evaluation
assurance Supplier Quality Assurance manual CV, Tata Motors, Version General Supplier Manual, Procedure No Quality
"No Manual"
supplier code of
Corp Ltd
Supplier
No manual
IATF 16949:2016, Effective 01-Mar-2024 quality Reference : - RE-IMS- Quality
Specifications for Brembo Rev Date -28/11/2018, GI-0008 Supplier
Customer Specific Requirements of Released Aug 2020. Supplier General requirements Supplier 5 Star audit Supplier General 01276_15_00082 v6 EN Assurance Supplier Quality RASIC Chart General terms Lagonda Limited Quality Assurance Manual
Doc. Requirements. Customer-Specific- Customer-Specific Navistar Inc./ Volkswagen Truck & Bus standard, First
Mahindra manual.
Quality 3.3 Revised on Date 09. Jan 2024. Cummins Incorporated Cummins Incorporated conditions of Quality general_term SSC/001, Origin date manual, quality Assurance conduct Quality Ford Motor Company Customer-Specific Borgwarner Assurance Supplier COM-SQ- Supplies. May 2013 Edition. General Manual July 31, LOI
Issue 29, COMMERCIAL
and conditions Production
General T&C of Supplier Quality Assurance
Sixth Edition 2022.
quality
Mercedes-Benz AG Daimler India No Manual supplier 7th Purchasing adherence Quality purchase terms General Manual June 18, 2021 SQM-01 Manual VEHICLE STANDARD, purchase Manual Rev No "3" Date 27 Supplier Quality assurance
Posted Date: December 01, Requirements (CSRs) Requirements for use of Edition May Vendor Quality Assurance manual Fbd- I20310 Supplier Handbook Supplier Handbook contract for Manual s_of_purchas 30th April,2024, Issue Business 01.04.2022 and Assurance Requirements For use with PPAP Fourth Edition Supplier Quality Rev "02", Date 08.05.2013. purchasing
Assurance Customer manual Rev 2019, (Based on General Purchase for purchase of purchasing terms
Customer Specific Requirements and Vendor 2020
February 2022 commercial vehicles General purchasing of Volkswagen Group IATF 16949:2016 3rd CVS10- TRATON Customer Specific 2012.
evaluation Edition 4th Edition May 2023. Fbd- I20315 (Customer-Specific Requirements) (Customer-Specific Requirements) the supply of e_november_
terms &
Date 03rd May.2024. Vertical
requirements.
whistle blower
manual,
Manual
& conditions
Service PPAP First Edition, Effective 01-Jul-2023. manual, 3rd
terms and Rev 03, manual
FCA US LLC Supplier (SQAM001)
Procurement speciications Feb terms and CVS 10, Release Date HSI Automotive Nov 2023 Manual Rev 004, requirements,
terms & conditions standard, First Issued Manual, Conditions . specific 3, 22 Oct "Other terms and Rev “ 02” applicable. conditions Date- 06 Customer-Specific Quality Revision E – Global Honda agreement T &C 2020-03. goods. & conditions PARMA code India-56850
Effective Date: December 15, March 2022 Edition Nov 2023. Rud- I20313 Publication Date: Jan 11, 2023 Publication Date: Jan 11, 2023 works or 5th Edition 2022_edition Faridabad 3rd Edition Jan policy. Rev 1, Jan July 2019 Rev No “ 12” 2017, conditions. pvt. Limited – Date 20.12.2018 Rev “07”
code of Imperial Auto Industries Limited 2020
MBST 2021 DICV Faridabad
8AG3
Requirements Quality Assurance
Edition May Date: 30th I036, I149, I371, I250 Version 3.2 Lko -I20311 FBD-I000912 services. March 2019
02.04.2024
720094 requirements 2013. 2020.
conditions
Faridabad code
Effective
2017 HJMEA -Plot No 83 / sec 25-closed Dec 2019 Date
Requirements
Manual,
Revision Date:
APQP Guidelines April 2015 01.04.2022 SQM 2019) IATF 16949 Customer- 2022 PARMA code Bawal Plant -
Requirement for Purchased Parts & Faridabad 21472 27.10.2020.
. plants- 15659774 700454 2012. April 2023 . Released date 01.04.2021 " Date 01 01.04.2022 01.04.2021 for IATF 16949:2016 10 November 100435-Sanand, VEN-001131 (AMLPPTC2022) 57913
Plant II -650266385 / 00268377 Suppliers, Release date 2024-08 DI005, Nighojhe San-I66300 JSR-I0009 64446 IN0000I005 Chennai 137210105 650566115 Chennai - 30.06.2023 Version A, Edition Specific-Requirements 188138 VE000465
MERCEDES AMG - 15313588 DI 005 TM 00017 100079 08/31/2020. 5I10 June 2014. Publication Date: August 2017. 5FF0003I26 Ahmedabad Plant PARMA code IMT
Plant III- 00I02036 Pune DI005A, JSR -I30214 IN000PI061 112654 7205535 I250 Chennai code V009059G HJMEG -Plot No 14/6 2S35, Rev "04" Chennai-360006 100184 (CSRs) of Volkswagen V02471
DICV Chennai plant- 1908- TDWX I146 5, 2020 V2903 Faridabad Plant - 57810
Plant VII (42/28)-650317071 40921 -New code yet to release. Rudrapur Rudrapur -7201016 BI0003C Greater Dated Pune-350133 Group March 2022.
15687861 3217 89166 V10093 TMC 0101
DI005BX Noida- 01/08/2024
A00BYI02
IATF 16949 certified Suppliers of components with IATF 16949 certified Suppliers of components with
embedded software Automotive product-related embedded software Automotive product-related
software or automotive products with embedded software or automotive products with embedded
software shall be in software shall be in
The organization shall require their conformance with IATF 16949 8.3.2.3. Cummins conformance with IATF 16949 8.3.2.3. Cummins
recommends the use of Capability Maturity Model recommends the use of Capability Maturity Model
suppliers of automotive product-
Integration (CMMI), Automotive SPICE or Integration (CMMI), Automotive SPICE or
related software, or automotive equivalent. Evidence of compliance will be equivalent. Evidence of compliance will be
products with embedded software, to submitted as an APQP element, when applicable. submitted as an APQP element, when applicable.
implement and maintain a process for Suppliers of product-related software or products Suppliers of product-related software or products
with embedded software shall complete Supplier with embedded software shall complete Supplier
software quality assurance for their Defeat Device Awareness and Prevention training Defeat Device Awareness and Prevention training
products. on the Supplier Portal on the Supplier Portal
https://public.cummins.com/sites/CSP/Pages/PCRA- https://public.cummins.com/sites/CSP/Pages/PCRA-
Training---Supplier-Defeat-Device-course Training---Supplier-Defeat-Device-course
overview.aspx. Suppliers shall disclose all Auxiliary overview.aspx. Suppliers shall disclose all Auxiliary
Emissions Control Devices / Strategies Emissions Control Devices / Strategies
(AECD/AES) to Cummins Inc. (AECD/AES) to Cummins Inc.
A software development assessment
methodology shall be utilized to assess
the suppliers’ software development
process. Using prioritization based on
risk and potential impact to the
customer, the organization shall
require the supplier to retain
documented information of a
software development capability self-
assessment.
8.4.2.4 8.4.2.4 Supplier monitoring SP/I/PU/003 8.4.2.4 √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
The organization shall have a
documented process and criteria to
evaluate supplier performance in order Sub Vendor (Tier 2 or lower
to ensure conformity of externally suppliers) control refer In support of Ford's expectation of
provided products, processes, and chapter 29 100% on-time delivery, the
organization shall also require 100%
services to internal and external on-time delivery from sub-tier
customer requirements. suppliers.
At a minimum, the following supplier Responsibility of tier 1
performance indicators shall be supplier to ensure the tier
monitored: suppliers improvement.
Monitor
a) Delivered product conformity to MSIL can assess the tier 1
Supplier quality
requirements; supplier.
performance
Second-par ty auditor s
per for ming QMS audits
must meet the r equir ements
in clause 7.2.4 Second-Par ty
Auditor Compliance in
IATF16949:2016 plus meet CQI-9 Heat Treat Systems
these additional Assessment, CQI-11 Plating Systems
r equir ements: Supplier audit Assessment, CQI-12 Coating
1. The or ganization (2nd
The organization shall include a second- par ty) must be
Min Once Second party Systems Assessment, CQI-15
/annum and auditor Welding Systems Assessment, CQI-
party audit process in their supplier IATF16949:2016 cer tified
and not on pr obation or records competency / 17 Soldering Systems Assessment,
management approach second-party suspension. evidenced can Second party CQI-23, Molding System
2. The or ganization (2nd
audits may be used for the following: par ty) must utilize a be asked by audits Assessment, CQI-27 Casting System
qualified ISO Lead Auditor , customer Assessment. In addition, CQI-28
or a qualified inter nal Traceability Guidelines.
auditor with evidence of
their successful completion
freq once / annum.
of tr aining, and a minimum
of five inter nal
ISO/TS16949:2009 and/or
IATF16949:2016 audits
under the super vision of a
qualified lead auditor .
The or ganization (2nd
par ty) must audit annually
each qualifying supplier and
maintain r ecor ds of the
audit. Qualifying supplier is
a) Supplier risk assessment; defined by those supplier s
deter mined to need second-
Evidences of test
& synthesis
results should
preserved defined Pre-approve by
storage period customer for all
and evidences to special process
customer when
before off-load
8.5 8.5 production and service provision SP/I/PR/005 8.5 √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
8.5.1 Control of production and √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
8.5.1 8.5.1 √ √ √
service provision
The organization shall implement production
and services provision under controlled The control plan shall include: The control plan shall include:
conditions. Controlled conditions shall a) First off/last off part validation, as applicable a) First off/last off part validation, as applicable
include, as applicable:
a) the availability of documented
information that defines:
1) the characteristics of the products t b
produced , the services to be provided, or the
activities to be performed;
2) the results to be achieved;
b) the availability and use of suitable
monitoring and measuring resources;
c) the implement of monitoring and
measurement activities at appropriate stage t
verify that criteria for control of processes or
outputs, and acceptance criteria for products
and services have been met;
The organization shall use an inventory Supplier will maintain at least thirty
(30) days’ supply of goods within
management system to optimize the NAFTA Region to support
inventory requirements unless otherwise
agreed to in writing by Navistar.
The organization shall ensure that
obsolete product is controlled in a
manner similar to that of
nonconforming product.
Organizations shall comply with
preservation, packaging, shipping, and Suppliers are required to follow D-
13 Packing and Shipping Standard,
labeling requirements as provided by located on
their customers. www.navistarsupplier.com.
SP/I/SA/005 √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
8.5.5 8.5.5 post-delivery activities SP/I/SA/007
8.5.5 √ √ √
AQ -acceptance
The organization shall meet requirements for
Supply of spares upto 10 years rate max 50
post-delivery activities associated with the
after the serial life. parts/annum/
products and services. family of parts
8.5.6 / 8.3.6.1 Process/ Product Supplier Change Control (including Embedded Software Process/ Product Supplier Change Control (including Embedded Software
Control of Changes changes) changes)
/ 8.3.6.1/8.5.6 a. The supplier shall notify the Cummins SQE of any proposed process or a. The supplier shall notify the Cummins SQE of any proposed process or
Design and product changes as described in the AIAG PPAP manual. product changes as described in the AIAG PPAP manual.
development b. The supplier shall obtain approval for all process and product change b. The supplier shall obtain approval for all process and product change
changes – requests from their Cummins SQE prior to implementing a change. requests from their Cummins SQE prior to implementing a change.
The organization shall review and control supplemental Proposed changes shall be approved using the Cummins Supplier Change Proposed changes shall be approved using the Cummins Supplier Change
changes for production or services provision, VWAG requires its
Request Process (SCR). Informed decisions are then made on the impact Request Process (SCR). Informed decisions are then made on the impact
of the changes and whether a full, partial, or no PPAP submission is of the changes and whether a full, partial, or no PPAP submission is
to the extent necessary to ensure continuing suppliers to obtain
required. It is the supplier’s responsibility to ensure that Cummins has required. It is the supplier’s responsibility to ensure that Cummins has
documented
with requirements. The organization shall approved the PPAP before any parts are shipped to a manufacturing approved the PPAP before any parts are shipped to a manufacturing
approval, or a location. location.
retain documented information describing the documented c. Changes to the supplier’s direct material supply base require the c. Changes to the supplier’s direct material supply base require the
results of the review of changes, the person waiver, prior to supplier to submit a Supplier Change Request (SCR). Upon approval of the supplier to submit a Supplier Change Request (SCR). Upon approval of the
(s) authorization the change, and any production, See Supplier Change Request the supplier may be required to submit a PPAP Supplier Change Request the supplier may be required to submit a PPAP
Formel-Q-konkret, by the Cummins SQE. by the Cummins SQE.
necessary actions arising from the review.
(Chapter 4.6) - d. The supplier shall gain approval from the Cummins SQE using the d. The supplier shall gain approval from the Cummins SQE using the
Change Supplier Change Request process when any alternate process is to be Supplier Change Request process when any alternate process is to be
management and used.i. NOTE: An alternate process is one that is different than the used.i. NOTE: An alternate process is one that is different than the process
Volkswagen process used during PPAP used during PPAP
Standard VW ii. NOTE: Rework or Salvage processes not approved during the initial ii. NOTE: Rework or Salvage processes not approved during the initial
01155 PPAP process PPAP process
shall be treated as a process change. shall be treated as a process change.
e. Products produced on alternate processes may be subject to increased e. Products produced on alternate processes may be subject to increased
inspection and test requirements as agreed with the SQE inspection and test requirements as agreed with the SQE
√ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
MBST MBST 13/19, section
5, paragraph 7
8.7.1.1 customer authorization for
8.7.1.1 Procedure for 8.7.1.1 √ √ √
concession
Control of NC
products'/I/Q
A/003
The organization shall obtain a
customer concession or deviation
permit prior to further processing WERS (Worldwise engineering release
whenever the product or system)
manufacturing process is different
from that which is currently approved.
The organization shall obtain customer
authorization prior to further Follow rework as per chapter
24
processing for “use as is” and rework
The WERS help desk can provide
dispositions of nonconforming Ensure the re-work and information on WERS via email:
Refer SQM 4-5-1
for repair parts -
product. If sub-components are reused No reworked/repaired product may customer authorization. [email protected] N/A for Imperial
in the manufacturing process, that sub- be shipped without Navistar WERS training is available through Auto as on date.
authorization, except as allowed by No re-work for safety(Maru Ford Supplier Learning Institute (FSLI)
component reuse shall be clearly A), regulatory-R processes /
the standard rework processes that through
communicated to the customer in the are documented as part of the parts. https://fsp.portal.covisint.com/web/p
concession or deviation permit. PPAP approval process. ortal/home
The organization shall maintain a
record of the expiration date or
quantity authorized under concession.
The organization shall also ensure
compliance with the original or
superseding specifications and
requirements when the authorization
expires. Material shipped under
concession shall be properly identified
on each shipping container (this applies
equally to purchased product). The
organization shall approve any
requests from suppliers before
submission to the customer.
Procedure for √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
8.7.1.2 control of nonconforming Control of NC
8.7.1.2 8.7.1.2 √ √ √
product-customer-specified process products
SP/I/QA/003
NC products
Identified and
controlled
prevent
The organization shall comply with unintended use
applicable customer-specified controls or delivery.
for nonconforming products. Review process
FMEA using
reverse FMEA
tool on shop
floor.
Procedure for √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
Control of NC
8.7.1.3 8.7.1.3 control of suspect product products
8.7.1.3 √ √ √
SP/I/QA/003
The organization shall ensure that
product with unidentified or suspect
status is classified and controlled as
nonconforming product. The
organization shall ensure that all
appropriate manufacturing personnel
receiving training for containment of
suspect and nonconforming product.
Procedure for √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
8.7.1.4 8.7.1.4 control of reworked product Rework 8.7.1.4 √ √ √
SP/I/PR/007
The organization shall utilize risk
analysis (such as FMEA) methodology
to assess risks in the rework process
prior to a decision to rework the
product. If required by the customer, No rework allowed
the organization shall obtain approval for any process.
Refer 2.4.11 &
from the customer prior to Commitment
commencing rework of the product. letter
Daimler India Honda SMGPL
IATF Hyundai Greaves Hero India Imperial Triumph Honda Dellorto India
Mercedes Benz Group Commercial FIAT India SML Maruti Suzuki India Limited Toyota Piaggio, Volvo Piaggio Bajaj DAF / Cars (Suzuki
Force Borgwar Stellantis Royal HSI All Internal
International Motors LLC Mahindra & Mahindra Auto Motorcycles & Hyzon Motors TVS Motor Company Commercial
CLAUSE ISO9001 & IATF 16949:2016 REQUIREMENTS GMI Automobiles VW Renault Group isuzu Tata Motors Limited Tata Cummins Ltd. Cummins Vehicles Ashok Leyland Motor Motor Cotton moto Simpson Ford Motors Voss Yamaha Industries motor Brembo Atul Auto MG Motor India Pvt. Ltd. SCANIA Aston Martin Automotive Volvo UFI Filters and external
(Mercedes AMG) Vehicles Pvt (Formerly NAVISTAR) Mahindra Vehicles (MSIL) India India Eicher Auto PACCAR India Gujarat Pvt. Motors ner (Ex PSA) Enfield Scooters India USA Inc.
pvt. Limited
Limited Vehicle Pvt.
stake holders
No Pvt Ltd Pvt Ltd India Limited corp Motors limited cycles Pvt. Ltd. Ltd
Ltd. Limited Ltd)
Yamaha Supplier Quality Manual, Royal Enfield SCANIA STD3868
Mahindra PACCARinc
Daimler Supplier Supplier Hero Moto Global Version -6 Doc Reference Supplier STANDARD
General Motors IATF 16949 COMMERCIAL VEHICLE STANDARD supplier Supplier Quality Supplier Quality "No Manual" Ford motor company Customer specific requirements Quality and Environment Aston Martin Volvo Group Supplier
Imperial Ref. Customer Specific
Quality Manual
IATF 16949: RENAULT GROUP MAN Truck & Bus SE / Scania CV AB / evaluation
assurance Supplier Quality Assurance manual CV, Tata Motors, Version General Supplier Manual, Procedure No Quality
"No Manual"
supplier code of
Corp Ltd
Supplier
No manual
IATF 16949:2016, Effective 01-Mar-2024 quality Reference : - RE-IMS- Quality
Specifications for Brembo Rev Date -28/11/2018, GI-0008 Supplier
Customer Specific Requirements of Released Aug 2020. Supplier General requirements Supplier 5 Star audit Supplier General 01276_15_00082 v6 EN Assurance Supplier Quality RASIC Chart General terms Lagonda Limited Quality Assurance Manual
Doc. Requirements. Customer-Specific- Customer-Specific Navistar Inc./ Volkswagen Truck & Bus standard, First
Mahindra manual.
Quality 3.3 Revised on Date 09. Jan 2024. Cummins Incorporated Cummins Incorporated conditions of Quality general_term SSC/001, Origin date manual, quality Assurance conduct Quality Ford Motor Company Customer-Specific Borgwarner Assurance Supplier COM-SQ- Supplies. May 2013 Edition. General Manual July 31, LOI
Issue 29, COMMERCIAL
and conditions Production
General T&C of Supplier Quality Assurance
Sixth Edition 2022.
quality
Mercedes-Benz AG Daimler India No Manual supplier 7th Purchasing adherence Quality purchase terms General Manual June 18, 2021 SQM-01 Manual VEHICLE STANDARD, purchase Manual Rev No "3" Date 27 Supplier Quality assurance
Posted Date: December 01, Requirements (CSRs) Requirements for use of Edition May Vendor Quality Assurance manual Fbd- I20310 Supplier Handbook Supplier Handbook contract for Manual s_of_purchas 30th April,2024, Issue Business 01.04.2022 and Assurance Requirements For use with PPAP Fourth Edition Supplier Quality Rev "02", Date 08.05.2013. purchasing
Assurance Customer manual Rev 2019, (Based on General Purchase for purchase of purchasing terms
Customer Specific Requirements and Vendor 2020
February 2022 commercial vehicles General purchasing of Volkswagen Group IATF 16949:2016 3rd CVS10- TRATON Customer Specific 2012.
evaluation Edition 4th Edition May 2023. Fbd- I20315 (Customer-Specific Requirements) (Customer-Specific Requirements) the supply of e_november_
terms &
Date 03rd May.2024. Vertical
requirements.
whistle blower
manual,
Manual
& conditions
Service PPAP First Edition, Effective 01-Jul-2023. manual, 3rd
terms and Rev 03, manual
FCA US LLC Supplier (SQAM001)
Procurement speciications Feb terms and CVS 10, Release Date HSI Automotive Nov 2023 Manual Rev 004, requirements,
terms & conditions standard, First Issued Manual, Conditions . specific 3, 22 Oct "Other terms and Rev “ 02” applicable. conditions Date- 06 Customer-Specific Quality Revision E – Global Honda agreement T &C 2020-03. goods. & conditions PARMA code India-56850
Effective Date: December 15, March 2022 Edition Nov 2023. Rud- I20313 Publication Date: Jan 11, 2023 Publication Date: Jan 11, 2023 works or 5th Edition 2022_edition Faridabad 3rd Edition Jan policy. Rev 1, Jan July 2019 Rev No “ 12” 2017, conditions. pvt. Limited – Date 20.12.2018 Rev “07”
code of Imperial Auto Industries Limited 2020
MBST 2021 DICV Faridabad
8AG3
Requirements Quality Assurance
Edition May Date: 30th I036, I149, I371, I250 Version 3.2 Lko -I20311 FBD-I000912 services. March 2019
02.04.2024
720094 requirements 2013. 2020.
conditions
Faridabad code
Effective
2017 HJMEA -Plot No 83 / sec 25-closed Dec 2019 Date
Requirements
Manual,
Revision Date:
APQP Guidelines April 2015 01.04.2022 SQM 2019) IATF 16949 Customer- 2022 PARMA code Bawal Plant -
Requirement for Purchased Parts & Faridabad 21472 27.10.2020.
. plants- 15659774 700454 2012. April 2023 . Released date 01.04.2021 " Date 01 01.04.2022 01.04.2021 for IATF 16949:2016 10 November 100435-Sanand, VEN-001131 (AMLPPTC2022) 57913
Plant II -650266385 / 00268377 Suppliers, Release date 2024-08 DI005, Nighojhe San-I66300 JSR-I0009 64446 IN0000I005 Chennai 137210105 650566115 Chennai - 30.06.2023 Version A, Edition Specific-Requirements 188138 VE000465
MERCEDES AMG - 15313588 DI 005 TM 00017 100079 08/31/2020. 5I10 June 2014. Publication Date: August 2017. 5FF0003I26 Ahmedabad Plant PARMA code IMT
Plant III- 00I02036 Pune DI005A, JSR -I30214 IN000PI061 112654 7205535 I250 Chennai code V009059G HJMEG -Plot No 14/6 2S35, Rev "04" Chennai-360006 100184 (CSRs) of Volkswagen V02471
DICV Chennai plant- 1908- TDWX I146 5, 2020 V2903 Faridabad Plant - 57810
Plant VII (42/28)-650317071 40921 -New code yet to release. Rudrapur Rudrapur -7201016 BI0003C Greater Dated Pune-350133 Group March 2022.
15687861 3217 89166 V10093 TMC 0101
DI005BX Noida- 01/08/2024
A00BYI02
Procedure for √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
9.1.2 9.1.2 customer satisfaction customer 9.1.2 √ √ √
satisfaction
In case of repeated
and\or recurring
unsatisfactory
performance of the
Supplier, Renault Group Supplier Relationship Management Scorecard Supplier Relationship Management Scorecard
may issue Cummins Inc. Purchasing and Supplier Quality use the Cummins Inc. Purchasing and Supplier Quality use the Supplier
Performance Complaints Supplier Balanced Scorecard to evaluate Balanced Scorecard to evaluate
through the IATF customer satisfaction with selected external production and customer satisfaction with selected external production and
The organization shall monitor customers’
Complaint Management service suppliers. Cummins Inc. stores, analyzes and reports service suppliers. Cummins Inc. stores, analyzes and reports
perceptions f the degree to which their needs System (IATF CMS). organization performance data collected from other sources organization performance data collected from other sources
and expectations have been fulfilled. The This might be driven by within Cummins Inc. within Cummins Inc. The organization shall monitor
organization shall determine the methods for L3 / L4 RSSC, SHC / ASES The Supplier Relationship Management Scorecard reports The Supplier Relationship Management Scorecard reports performance and customer
/ OSA poor level, Trust
obtaining, monitoring and reviewing this performance in five categories: performance in five categories: satisfaction metrics (as defined by Q1)
Disruption, or Plant
• Quality Management • Quality Management and updates to Ford requirements on
information. Blockage/ recall
• End Customer Quality • End Customer Quality
campaigns. Ford Supplier Portal (FSP)
• Delivery • Delivery
The supplier is requested https://fsp.covisint.com.
to actively cooperate • Technology & Innovation • Technology & Innovation
with its IATF certification • Sustainability • Sustainability It is recommended that the
body to manage the organization review their performance
Complaint in a timely status on Supplier Improvement
and effective manner.
Metrics (SIM) at least weekly.
QMS failure
deviation and
actions as per
following
1. Focus on
remote &support Controlled Shipping Controlled Shipping
processes Cummins Inc. may, at its discretion, require the organization to Cummins Inc. may, at its discretion, require the organization to participate
2.Interface participate in Controlled in Controlled
remote support & Shipping/Consequential Management activities. This may include third Shipping/Consequential Management activities. This may include third
NOTE Example of monitoring customer party party
specific site.
perceptions can include customer surveys, containment/component certification processes that are provided at the containment/component certification processes that are provided at the
3. Identification supplier’s expense. These supplier’s expense. These
customer feedback on delivery products and of similar Supplier to attend the warranty analysis
actions will be implemented at the direction of Cummins Inc. Purchasing actions will be implemented at the direction of Cummins Inc. Purchasing
services, meetings with customers, market- failures remote meeting as per schedule. Supplier Quality Leader. Supplier Quality Leader.
share analysis, compliments, warranty claims support & These activities will be monitored at a senior level at Cummins Inc. and These activities will be monitored at a senior level at Cummins Inc. and
specific plant require the active require the active
and deader reports. participation of senior management at the supplier. participation of senior management at the supplier.
4.Ensure
If a supplier is placed on Controlled Shipping Level 2, they are required to If a supplier is placed on Controlled Shipping Level 2, they are required to
permanent
notify their Certification notify their Certification
corrective action Registrar as part of the containment process. Registrar as part of the containment process.
5.Ensure the
senior magmt
driving culture.
Certification Body
to decide the
Procedure for √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
9.1.2.1 customer satisfaction-
9.1.2.1 customer 9.1.2.1 √ √ √
supplemental satisfaction
Delivery requirements If Seller’s acts or omissions
result in Seller’s failure to meet
Customer satisfaction with the Geeral T&C Refer 5 &7 Buyer’sdelivery requirements
Supplier Cockpit of brembo - Horizon
organization shall be monitored Quality Status Blocked period, Binding
and Buyer requires a more
expeditious method of
through continual evaluation of (Volkswagen The organization shall notify its forecase & Non binding transportation for the
goods than the transportation
internal and external performance Group B2B Certification Body of record in writing forecast. method originally specified by
indicators to ensure compliance to the “ONE - SCQ”): within five (5) working days if Ford Buyer, Seller shall under the
Status of Motor Company places the site in instructions from Buyer, shipthe
product and process specifications and incidents, ppm. special status condition of Q1 goods as expeditiously as
possible at
other customer requirements. Revocation indicated by the receipt of Seller’s sole expense and
a Q1 revocation letter. responsibility.
9.2.1 9.2.1 √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
9.2.1 and 9.2.2 √ √ √
9.2.2 9.2.2
9.2.1 The organization shall conduct √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
internal audits at planned intervals to provide
9.2.1 9.2.1 √ √ √
information on whether the quality
management system.
a) Conforms to:
1) The organization’s own requirements f its
quality management system;
2) The requirements of this international
standard;
b) Is effectively implemented and
maintained.
9.2.2 9.2.2 the organization shall: 9.2.2 √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
Conduct MRM
Top management shall review the suitability to
improve
organization’s quality management system, at
Customer
planned intervals, to ensure its continuing
satisfaction &
suitability, adequacy, effectiveness and Top Mgmt
alignment with the strategic direction of the Availablility when
organization. performance
review bt
customer
Daimler India Honda SMGPL
IATF Hyundai Greaves Hero India Imperial Triumph Honda Dellorto India
Mercedes Benz Group Commercial FIAT India SML Maruti Suzuki India Limited Toyota Piaggio, Volvo Piaggio Bajaj DAF / Cars (Suzuki
Force Borgwar Stellantis Royal HSI All Internal
International Motors LLC Mahindra & Mahindra Auto Motorcycles & Hyzon Motors TVS Motor Company Commercial
CLAUSE ISO9001 & IATF 16949:2016 REQUIREMENTS GMI Automobiles VW Renault Group isuzu Tata Motors Limited Tata Cummins Ltd. Cummins Vehicles Ashok Leyland Motor Motor Cotton moto Simpson Ford Motors Voss Yamaha Industries motor Brembo Atul Auto MG Motor India Pvt. Ltd. SCANIA Aston Martin Automotive Volvo UFI Filters and external
(Mercedes AMG) Vehicles Pvt (Formerly NAVISTAR) Mahindra Vehicles (MSIL) India India Eicher Auto PACCAR India Gujarat Pvt. Motors ner (Ex PSA) Enfield Scooters India USA Inc.
pvt. Limited
Limited Vehicle Pvt.
stake holders
No Pvt Ltd Pvt Ltd India Limited corp Motors limited cycles Pvt. Ltd. Ltd
Ltd. Limited Ltd)
Yamaha Supplier Quality Manual, Royal Enfield SCANIA STD3868
Mahindra PACCARinc
Daimler Supplier Supplier Hero Moto Global Version -6 Doc Reference Supplier STANDARD
General Motors IATF 16949 COMMERCIAL VEHICLE STANDARD supplier Supplier Quality Supplier Quality "No Manual" Ford motor company Customer specific requirements Quality and Environment Aston Martin Volvo Group Supplier
Imperial Ref. Customer Specific
Quality Manual
IATF 16949: RENAULT GROUP MAN Truck & Bus SE / Scania CV AB / evaluation
assurance Supplier Quality Assurance manual CV, Tata Motors, Version General Supplier Manual, Procedure No Quality
"No Manual"
supplier code of
Corp Ltd
Supplier
No manual
IATF 16949:2016, Effective 01-Mar-2024 quality Reference : - RE-IMS- Quality
Specifications for Brembo Rev Date -28/11/2018, GI-0008 Supplier
Customer Specific Requirements of Released Aug 2020. Supplier General requirements Supplier 5 Star audit Supplier General 01276_15_00082 v6 EN Assurance Supplier Quality RASIC Chart General terms Lagonda Limited Quality Assurance Manual
Doc. Requirements. Customer-Specific- Customer-Specific Navistar Inc./ Volkswagen Truck & Bus standard, First
Mahindra manual.
Quality 3.3 Revised on Date 09. Jan 2024. Cummins Incorporated Cummins Incorporated conditions of Quality general_term SSC/001, Origin date manual, quality Assurance conduct Quality Ford Motor Company Customer-Specific Borgwarner Assurance Supplier COM-SQ- Supplies. May 2013 Edition. General Manual July 31, LOI
Issue 29, COMMERCIAL
and conditions Production
General T&C of Supplier Quality Assurance
Sixth Edition 2022.
quality
Mercedes-Benz AG Daimler India No Manual supplier 7th Purchasing adherence Quality purchase terms General Manual June 18, 2021 SQM-01 Manual VEHICLE STANDARD, purchase Manual Rev No "3" Date 27 Supplier Quality assurance
Posted Date: December 01, Requirements (CSRs) Requirements for use of Edition May Vendor Quality Assurance manual Fbd- I20310 Supplier Handbook Supplier Handbook contract for Manual s_of_purchas 30th April,2024, Issue Business 01.04.2022 and Assurance Requirements For use with PPAP Fourth Edition Supplier Quality Rev "02", Date 08.05.2013. purchasing
Assurance Customer manual Rev 2019, (Based on General Purchase for purchase of purchasing terms
Customer Specific Requirements and Vendor 2020
February 2022 commercial vehicles General purchasing of Volkswagen Group IATF 16949:2016 3rd CVS10- TRATON Customer Specific 2012.
evaluation Edition 4th Edition May 2023. Fbd- I20315 (Customer-Specific Requirements) (Customer-Specific Requirements) the supply of e_november_
terms &
Date 03rd May.2024. Vertical
requirements.
whistle blower
manual,
Manual
& conditions
Service PPAP First Edition, Effective 01-Jul-2023. manual, 3rd
terms and Rev 03, manual
FCA US LLC Supplier (SQAM001)
Procurement speciications Feb terms and CVS 10, Release Date HSI Automotive Nov 2023 Manual Rev 004, requirements,
terms & conditions standard, First Issued Manual, Conditions . specific 3, 22 Oct "Other terms and Rev “ 02” applicable. conditions Date- 06 Customer-Specific Quality Revision E – Global Honda agreement T &C 2020-03. goods. & conditions PARMA code India-56850
Effective Date: December 15, March 2022 Edition Nov 2023. Rud- I20313 Publication Date: Jan 11, 2023 Publication Date: Jan 11, 2023 works or 5th Edition 2022_edition Faridabad 3rd Edition Jan policy. Rev 1, Jan July 2019 Rev No “ 12” 2017, conditions. pvt. Limited – Date 20.12.2018 Rev “07”
code of Imperial Auto Industries Limited 2020
MBST 2021 DICV Faridabad
8AG3
Requirements Quality Assurance
Edition May Date: 30th I036, I149, I371, I250 Version 3.2 Lko -I20311 FBD-I000912 services. March 2019
02.04.2024
720094 requirements 2013. 2020.
conditions
Faridabad code
Effective
2017 HJMEA -Plot No 83 / sec 25-closed Dec 2019 Date
Requirements
Manual,
Revision Date:
APQP Guidelines April 2015 01.04.2022 SQM 2019) IATF 16949 Customer- 2022 PARMA code Bawal Plant -
Requirement for Purchased Parts & Faridabad 21472 27.10.2020.
. plants- 15659774 700454 2012. April 2023 . Released date 01.04.2021 " Date 01 01.04.2022 01.04.2021 for IATF 16949:2016 10 November 100435-Sanand, VEN-001131 (AMLPPTC2022) 57913
Plant II -650266385 / 00268377 Suppliers, Release date 2024-08 DI005, Nighojhe San-I66300 JSR-I0009 64446 IN0000I005 Chennai 137210105 650566115 Chennai - 30.06.2023 Version A, Edition Specific-Requirements 188138 VE000465
MERCEDES AMG - 15313588 DI 005 TM 00017 100079 08/31/2020. 5I10 June 2014. Publication Date: August 2017. 5FF0003I26 Ahmedabad Plant PARMA code IMT
Plant III- 00I02036 Pune DI005A, JSR -I30214 IN000PI061 112654 7205535 I250 Chennai code V009059G HJMEG -Plot No 14/6 2S35, Rev "04" Chennai-360006 100184 (CSRs) of Volkswagen V02471
DICV Chennai plant- 1908- TDWX I146 5, 2020 V2903 Faridabad Plant - 57810
Plant VII (42/28)-650317071 40921 -New code yet to release. Rudrapur Rudrapur -7201016 BI0003C Greater Dated Pune-350133 Group March 2022.
15687861 3217 89166 V10093 TMC 0101
DI005BX Noida- 01/08/2024
A00BYI02
Procedure for √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
9.3.1.1 management review-
9.3.1.1 Management 9.3.1.1 √ √ √
supplemental Review
Procedure for √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
10.3 10.3 continual improvement Continual 10.3 √ √ √
Improvement
The organization shall continually improve
the suitability, adequacy and effectiveness f
the quality management system.
Procedure for √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
10.3.1 continual improvement-
10.3.1 Continual 10.3.1 √ √ √
supplemental Improvement
The organization
shall inform the
relevant contact
in Renault Group
: Product
The or ganization shall have a Engineering,
pr ocess for effective r eview SAM in Renault
of PFMEA of all Group
manufactur ing par ts and
pr ocesses to occur annually Procurement and
at a minimum. This r eview the relevant
shall consider , at a Supplier Quality
minimum, cr itical, safety,
The organization shall have a and high r isk items. The
contact about
change proposal
documented process for continual or ganization shall
incor por ate tools such as using the formats
improvement. The organization shall r ever se PFMEA or other Design Change
similar method to assist in
include in this process the following: the PFMEA r eview. PFMEA Request or
r eview output shall include Process/Facility
an updated PFMEA, r ecor d Change Request.
of the changes made (or
r ecor d that no changes wer e
available in
made), and identification of RGPQP
the team involved in the The organization
r eview. shall get
feedback from
Groupe Renault
prior to start
change
implementation.
Conduct reverse
FMEA
c) Risk analysis (such as FMEA). Apply the same
for Suppliers Also.
Daimler India Honda SMGPL
IATF Hyundai Greaves Hero India Imperial Triumph Honda Dellorto India
Mercedes Benz Group Commercial FIAT India SML Maruti Suzuki India Limited Toyota Piaggio, Volvo Piaggio Bajaj DAF / Cars (Suzuki
Force Borgwar Stellantis Royal HSI All Internal
International Motors LLC Mahindra & Mahindra Auto Motorcycles & Hyzon Motors TVS Motor Company Commercial
CLAUSE ISO9001 & IATF 16949:2016 REQUIREMENTS GMI Automobiles VW Renault Group isuzu Tata Motors Limited Tata Cummins Ltd. Cummins Vehicles Ashok Leyland Motor Motor Cotton moto Simpson Ford Motors Voss Yamaha Industries motor Brembo Atul Auto MG Motor India Pvt. Ltd. SCANIA Aston Martin Automotive Volvo UFI Filters and external
(Mercedes AMG) Vehicles Pvt (Formerly NAVISTAR) Mahindra Vehicles (MSIL) India India Eicher Auto PACCAR India Gujarat Pvt. Motors ner (Ex PSA) Enfield Scooters India USA Inc.
pvt. Limited
Limited Vehicle Pvt.
stake holders
No Pvt Ltd Pvt Ltd India Limited corp Motors limited cycles Pvt. Ltd. Ltd
Ltd. Limited Ltd)
Yamaha Supplier Quality Manual, Royal Enfield SCANIA STD3868
Mahindra PACCARinc
Daimler Supplier Supplier Hero Moto Global Version -6 Doc Reference Supplier STANDARD
General Motors IATF 16949 COMMERCIAL VEHICLE STANDARD supplier Supplier Quality Supplier Quality "No Manual" Ford motor company Customer specific requirements Quality and Environment Aston Martin Volvo Group Supplier
Imperial Ref. Customer Specific
Quality Manual
IATF 16949: RENAULT GROUP MAN Truck & Bus SE / Scania CV AB / evaluation
assurance Supplier Quality Assurance manual CV, Tata Motors, Version General Supplier Manual, Procedure No Quality
"No Manual"
supplier code of
Corp Ltd
Supplier
No manual
IATF 16949:2016, Effective 01-Mar-2024 quality Reference : - RE-IMS- Quality
Specifications for Brembo Rev Date -28/11/2018, GI-0008 Supplier
Customer Specific Requirements of Released Aug 2020. Supplier General requirements Supplier 5 Star audit Supplier General 01276_15_00082 v6 EN Assurance Supplier Quality RASIC Chart General terms Lagonda Limited Quality Assurance Manual
Doc. Requirements. Customer-Specific- Customer-Specific Navistar Inc./ Volkswagen Truck & Bus standard, First
Mahindra manual.
Quality 3.3 Revised on Date 09. Jan 2024. Cummins Incorporated Cummins Incorporated conditions of Quality general_term SSC/001, Origin date manual, quality Assurance conduct Quality Ford Motor Company Customer-Specific Borgwarner Assurance Supplier COM-SQ- Supplies. May 2013 Edition. General Manual July 31, LOI
Issue 29, COMMERCIAL
and conditions Production
General T&C of Supplier Quality Assurance
Sixth Edition 2022.
quality
Mercedes-Benz AG Daimler India No Manual supplier 7th Purchasing adherence Quality purchase terms General Manual June 18, 2021 SQM-01 Manual VEHICLE STANDARD, purchase Manual Rev No "3" Date 27 Supplier Quality assurance
Posted Date: December 01, Requirements (CSRs) Requirements for use of Edition May Vendor Quality Assurance manual Fbd- I20310 Supplier Handbook Supplier Handbook contract for Manual s_of_purchas 30th April,2024, Issue Business 01.04.2022 and Assurance Requirements For use with PPAP Fourth Edition Supplier Quality Rev "02", Date 08.05.2013. purchasing
Assurance Customer manual Rev 2019, (Based on General Purchase for purchase of purchasing terms
Customer Specific Requirements and Vendor 2020
February 2022 commercial vehicles General purchasing of Volkswagen Group IATF 16949:2016 3rd CVS10- TRATON Customer Specific 2012.
evaluation Edition 4th Edition May 2023. Fbd- I20315 (Customer-Specific Requirements) (Customer-Specific Requirements) the supply of e_november_
terms &
Date 03rd May.2024. Vertical
requirements.
whistle blower
manual,
Manual
& conditions
Service PPAP First Edition, Effective 01-Jul-2023. manual, 3rd
terms and Rev 03, manual
FCA US LLC Supplier (SQAM001)
Procurement speciications Feb terms and CVS 10, Release Date HSI Automotive Nov 2023 Manual Rev 004, requirements,
terms & conditions standard, First Issued Manual, Conditions . specific 3, 22 Oct "Other terms and Rev “ 02” applicable. conditions Date- 06 Customer-Specific Quality Revision E – Global Honda agreement T &C 2020-03. goods. & conditions PARMA code India-56850
Effective Date: December 15, March 2022 Edition Nov 2023. Rud- I20313 Publication Date: Jan 11, 2023 Publication Date: Jan 11, 2023 works or 5th Edition 2022_edition Faridabad 3rd Edition Jan policy. Rev 1, Jan July 2019 Rev No “ 12” 2017, conditions. pvt. Limited – Date 20.12.2018 Rev “07”
code of Imperial Auto Industries Limited 2020
MBST 2021 DICV Faridabad
8AG3
Requirements Quality Assurance
Edition May Date: 30th I036, I149, I371, I250 Version 3.2 Lko -I20311 FBD-I000912 services. March 2019
02.04.2024
720094 requirements 2013. 2020.
conditions
Faridabad code
Effective
2017 HJMEA -Plot No 83 / sec 25-closed Dec 2019 Date
Requirements
Manual,
Revision Date:
APQP Guidelines April 2015 01.04.2022 SQM 2019) IATF 16949 Customer- 2022 PARMA code Bawal Plant -
Requirement for Purchased Parts & Faridabad 21472 27.10.2020.
. plants- 15659774 700454 2012. April 2023 . Released date 01.04.2021 " Date 01 01.04.2022 01.04.2021 for IATF 16949:2016 10 November 100435-Sanand, VEN-001131 (AMLPPTC2022) 57913
Plant II -650266385 / 00268377 Suppliers, Release date 2024-08 DI005, Nighojhe San-I66300 JSR-I0009 64446 IN0000I005 Chennai 137210105 650566115 Chennai - 30.06.2023 Version A, Edition Specific-Requirements 188138 VE000465
MERCEDES AMG - 15313588 DI 005 TM 00017 100079 08/31/2020. 5I10 June 2014. Publication Date: August 2017. 5FF0003I26 Ahmedabad Plant PARMA code IMT
Plant III- 00I02036 Pune DI005A, JSR -I30214 IN000PI061 112654 7205535 I250 Chennai code V009059G HJMEG -Plot No 14/6 2S35, Rev "04" Chennai-360006 100184 (CSRs) of Volkswagen V02471
DICV Chennai plant- 1908- TDWX I146 5, 2020 V2903 Faridabad Plant - 57810
Plant VII (42/28)-650317071 40921 -New code yet to release. Rudrapur Rudrapur -7201016 BI0003C Greater Dated Pune-350133 Group March 2022.
15687861 3217 89166 V10093 TMC 0101
DI005BX Noida- 01/08/2024
A00BYI02
Country of Origin Certificate submission to 3rd Party and communication to customer OCT- DEC every Year
c ertific ate to GM
"03" Addition of CSR and revision of CSR Greaves cotton limited. 29.06.2018
"02" Addition of CSR and revision of CSR Navistar. 05.03.2018
"01" Addition of CSR Renault and VW 20.11.2017
"00" Initial released 10.08.2017
Rev No Details of Revision Date Remark