Standard Quotation
Standard Quotation
Sub: Quotation for Planning & Construction of G+4 Building at Plot No- ,
Action Area- , Premises No- , Newtown, Kolkata (Area of Plot is SqM).
Firstly, we like to thank you for allowing us to discuss about our possibilities to participate in the Construction
work and we do hereby confirm that we are capable of performing the scope of work and highly interested on this
project. We believe we would be a great fit on this project as we can satisfy your main concern i.e best quality
work at the most reasonable and competitive price, which is possible because of our large scale of existing and
ongoing construction work in Newtown (more than 75+ Co-Op & Individual Buildings and 15 lacs sqft
Construction experience in Newtown).
With reference to our recent telephonic conversation this expression of interest to participate in Construction
Tender based on latest inputs and specifications provided to us. Of course, if there are any changes please let us
know and we will quickly rework our bid to give you more accurate price.
SL Description Quoted Rate Proposed Remarks
Including GST and all Timeline
other Charges / Taxes
Part-I: Pre-Constructional Activities
1 Soil Testing
Validity of the Rate: 45 (Fourty Five) Days from the date of Quotation.
We have provided a brief of our Company Profile along with the list of Existing and Ongoing Projects, General
Specification, Scope of Work and Terms of Payment Schedule and hope, that you will visit our respective sites
for getting detailed idea about our working. We hope to serve you the best.
Thanking You,
Warm Regards,
On behalf of Newtown Nirman.
PAYMENT SCHEDULE
------------------------------ -----------------------------
Employer Contractor
Witness By Witness By
1. 1.
2. 2.
Annexure-1
GENERAL SPECIFICATIONS FOR THE CONSTRUCTION OF THE PROPOSED G+4
STORIED RESIDENTIAL BUILDING
Sl. Brand /
Scope of Work Specification of materials
No. Manufacturer
1. Foundation Foundation – …. Nos. of Pile Steel
upto plinth Pile : …..mm.Dia & …….mt. in depth TATA /RINL /
(with pile) SAIL
Cement
Lafarge/
Ambuja/
Ultratech
2. Foundation up a) Strip / Raft / Isolated foundation with M- Steel
to plinth 25 grade concrete and Fe-500 grade TATA /RINL /
(without pile) steel. SAIL
b) Depth 1500 mm from Ground level (as per
drawing) Cement
c) Plinth 300 mm above ground level. Lafarge/
d) Brick soling below foundation over 500 Ambuja/
micron polythen sheet Ultratech
e) 100 thik PCC with Jhama Brick bats
(1:3:6)
f) 250 th. Brick works.
All works as per structural drawings
submitted
3. Superstructure a) R.C.C. structure with M-20 grade Steel
(Roof Casting) concrete and Fe-500 grade steel. TATA /RINL /
b) Floor ht. – As per sanctioned drawing. SAIL
c) Caretaker room, toilet etc. with parking
arrangement. Cement
Lafarge/
Ambuja/
Ultratech
4. Stair Head Roof a) R.C.C structure with M-20 grade Steel
concrete and roof height as per drawing.
TATA /RINL /
SAIL
Cement
Lafarge/
Ambuja/
Ultratech
5. Brick Work a) 250 th. External brick works Cement
b) 125/75 th. Internal brick works Lafarge/
c) Lift machine room / stair overhead room Ambuja/
as per drawings. Ultratech
d) Elevation decorative as per submitted
view.
6. Boundary Wall Masonry boundary wall 125mm thick with
intermediate pillars (upto 1.83 mt ht. from
GL) complete with plaster and painting.
7. Plaster a) 12mm thick internal plaster (1:6) Cement
b) 15mm thick external plaster (1:5) Lafarge/
Ambuja/
Ultratech
8. Doors a) 100 x 62.5 Malaysia Sal wood door Malaysia Sal
frames.
b) Main Door (Height/Breadth) – 35 mm –
20 mm panel CP Teak wood shutter
c) Internal doors (Height/Breadth) – 32
mm water proof phenol bonded flushdoor
with teak venner finish on both sides.
d) Toilet door frame and shutter – PVC door
( Heavy ) Sintex
e) Balcony door – 35 mm Gamari wood
paneled shutter. ( Seasoned )
a) Godrej night latch ( Rs. 700/-) Godrej
b) 1 pair decorative Brass Handle ( Rs.
600/- each )
c) 1 No. 250 mm Capsule tower bolt S.S.
( Rs. 250/-)
d) 1 No. 150 mm Capsule tower bolt S.S.
(Rs. 150/-)
e) 3 No. Door Hinge – 125mm long 12G SS
(Royal)
h) 1 No. Buffer
Passages
Concrete pavement
10. Sanitary a) Concealed PVC high density pipes for HDPE / CPVC
& external and internal water lines withhot Supreme
Plumbing and cold facilities in all toilets in each
Works flat.
b) High density (HDPE) P. V. C. pipes for Supreme
waste and soil lines
c) PVC - 100 mm dia rain water down pipe. Supreme
d) 1 EPWC(white) with PVC flushing cistern Parryware/
e) 1 wash basin (white) – 22” X 16” Hindware
f) 1 Shower rose (CP), 1 wall mixer (3 way), 1
bibcock (2 way) with commode shower, 1
Piller cock (CP),
g) Mirror with Tray, Soap holder and Towel All CP fittings
rod (CP) by Essco
h) 1 Pedestal Wash Basin (white) and sillar
cock (CP) in Dining space.
i) S. S. Sink (400 x 600 size) with long body
(swing type) tap (CP) and one bibcock
with sink cock with extra tap point at
kitchen.
j) Water purifier point, washing machine
point and dinning basin point to be
providedat suitable location.
k) Standard fittings for servants / caretaker
toilet.
l) 6" dia S. W. line with necessary
Manholes and master tarp etc.
11. Aluminum a) Anodized aluminum sliding window Hindal co.
Windows (frame 1.20mm thick) with 5mm white
figured glass as per sanctioned building
plan.
12. Grills # MS integrated grill with glass pane for
stair openings.
&
Gates # MS railing (1' 6" height up to 2 Kg/sq. ft.)
for stairs with wooden hand rail ( Pine /
Debdaru)
Kitchen
2 No. Light point
1 No. Exhaust fan point.
1 No. 5Amp plug socket on main switch
board.
1 No. 5 Amp plug socket on main switch
board.
1 No. 15 Amp plug socket.
1 No. Chimney Point.
1 No. Water Purifier Point.
1 No. Micro Wave Point.
Toilet :
2 No. Light Point
1 No. Exhaust Fan Point
1 No. 5A Plug Socket on main switch
board.
1 No. 15A plug socket for Geyser.
Balcony
1 No. Light Point
1 no. 5A plug Point
Others :
1 No. Calling Bell point for each flat on
from Gr. Floor.
Staircase :
1 No. Light point in each landing with 2
way switch.
1 No. light point in each floor stair lobby
Roof :
4 Nos. light point.
2 Nos. 5Amp. Plug Point.
Note: The specification for items of work & materials may be substituted with higher
grades on request of the owner. In such case prior intimation has to be given before
execution of the particular item of work and the difference of cost involved for such
substitution has to be borne by the owner.