The document outlines the ceiling installation project for Nara Residences by Rockwell PH1, detailing the work activities, inspection criteria, and acceptance components for various installation phases. It specifies the required standards for frame and board installation, including tolerances and approvals needed from consultants. The document concludes with a recommendation for approval by the Project Engineer, ensuring compliance with plans and specifications.

Uploaded by

johaina
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
22 views

Copy of CEILING INSTALLATION

The document outlines the ceiling installation project for Nara Residences by Rockwell PH1, detailing the work activities, inspection criteria, and acceptance components for various installation phases. It specifies the required standards for frame and board installation, including tolerances and approvals needed from consultants. The document concludes with a recommendation for approval by the Project Engineer, ensuring compliance with plans and specifications.

Uploaded by

johaina
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

CEILING INSTALLATION

PROJECT: NARA RESIDENCES BY ROCKWELL PH1 DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :
LOCATION: GM Cordova Ave., Buri Road, Bacolod City
REQUESTED BY :

(Contractor) (Name/Designation) (Signature)


WORK ACTIVITY : AREA/LEVEL : GRIDLINE/STRUCTURE: INSPECTION DATE/TIME :
Exterior Dryworks (Please enclose key plan)

Masonry Finishing
Wetworks
CEILING FRAME REFERENCE PREPARED BY: INSPECTED BY: DATE START
INSTALLATION CONTRACTOR RLC INSP DATE FINISHED

ACCEPTED
COMPONENTS KPI
YES NO N/A
1.0 Checking of reference elevation No deviation is allowed Zero tolerance from
Motherpoint(Hallway) to Units to T&bs
2.0 Bulkhead frame and Wall angle must be properly installed No deviation is allowed unless approved by consultant
3.0 Bulkhead frame and Wall Angle Levelness and Alignment Maximum 2mm deviation of Wall Angle height from 1m
reference elevation
PREPARED BY: INSPECTED BY: DATE START
FRAME INSTALLATION
CONTRACTOR RLC INSP DATE FINISHED

ACCEPTED
COMPONENTS KPI
YES NO N/A
1.0 Concealed Wall gap and MEPF Sealants must be installed properly The PIC must have a copy of materials approval
The PIC must have the copy of the installers accreditations
The PIC must have a copy of methodology approval
2.0 Concealed wall gap sealant must be continuous No lapse allowed
Depth must be 20 mm, 5 mm deviation
3.0 Layout for the shadow groove and ceiling elevation must be comprehendable No deviation is allowed unless approved by consultant
4.0 Ceiling Frame must be as per plan No deviation is allowed unless approved by consultant
5.0 Ceiling Frame support for Exhaust Fan, FCU bracket, ceiling light No deviation is allowed unless approved by consultant
Sprinklerhead layout
6.0 2nd fix MEPFS works must be completed Mechanical works
7.0 Installation methodology must be epproved by the consultant The PIC must have a copy of the Consultants approval
8.0 Framing levelness Maximum of 5 mm deviation for whole height
9.0 Framing squareness (Carry over from Squareness of Walls Framing must pass 1' x 1' L square
10.0 Carrying channel spacing 1.2m spacing between carrying channel
11.0 Quality of materials installed Frames should be free from rust and dents
BOARD INSTALLATION WITH PREPARED BY: INSPECTED BY: DATE START
INSULATION CONTRACTOR RLC INSP DATE FINISHED

ACCEPTED
COMPONENTS KPI
YES NO N/A
1.0 Electrical box setting must be as per plan Maximum of 5 mm deviation on elevation, level and location
2.0 CDP riser must be installed as per plan No deviation is allowed unless approved by consultant
Plumbness deviation maximum of 1 cm for whole height
3.0 CDP riser must be properly insulated No deviation is allowed unless approved by consultant
4.0 CDP support on wall must be as per specs No deviation is allowed unless approved by consultant
5.0 Installation of electrical conduits must be as per plan No deviation is allowed unless approved by consultant
6.0 First Board enclosure must be as per specs Maximum plumbness deviation of 5 mm for the whole height
Squareness must pass 1' x 1' L square for non cabinet areas
Squareness must pass 3' x 3' L square for non cabinet areas
7.0 All wires must pass continuity and megger tests No deviation is allowed
8.0 Proper installation of insulation must be as per consultant's approval No deviation is allowed unless approved by consultant
9.0 Termination of wires to the panel board must be as per cosultant's approval. No deviation is allowed unless approved by consultant
10.0 Second Board enclosure must be as per specs Maximum plumbness deviation of 5 mm for the whole height
Squareness must pass 1' x 1' L square for non cabinet areas
Squareness must pass 3' x 3' L square for non cabinet areas
CIVIL / STRUCTURAL PLUMBING/SANITARY ELECTRICAL / AUX FIREPRO/MECH ARCHITECTURAL SAFETY

RLC Coordinator RLC Coordinator RLC Coordinator RLC Coordinator RLC Coordinator SAFETY OFFICER
PERMITTING: Based on the recommendations of the above personnel, having verified and certified that other works in the area will not conflict with the work
specifications, the Project Engineer in charge of said Activity/Work Item hereby recommends approval of this request and that shop drawings and materials
comply with the latest approved plans and specifications, the Project Engineer in charge of said Activity/Work Item hereby recommends approval of this request.

APPROVED BY : NOTED BY :

Construction Manager RLC Project Manager


DISTRIBUTION : Contractor QC Project Documentation Form 91-S-002 (Jan 2020)