dpr format
dpr format
4.5
3.5
2.5
1.5
0.5
0
9 10 11 13
1 2 3 4 5 6 7 8 B 11 12 C 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
A Technical Staff
1 Sr Site agent(Shibu) Coordinating project works 1
2 Site agent (Jithesh) Managing Quality tests 0
3 Site agent (mustafa) BBS and Bill 1
4 Mechanical (Alex) Controlling all mechanical works at site 0
5 Safetyofficer(Sam kurien) safety supervising 1
6 QC Engineer(Arun) Managing Quality tests 0
7 MEP Engineer (Vijesh V) Controlling all MEP works at site 0
8 Engineer (Jayakrishnan) Site supervising 0
9 QS(Arya Suresh ) BBS and Bill 1
10 Engineer Trainee (Jithu ) Site supervising 1
C Skilled
14 Painting workers painting works 0
15 Bar benders Bar bending &Shuttering 0
1 Generator Nos 1
2 Welding Set Nos 1
3 3 HP Water Pump Nos 1
4 Compression testing Machine Nos 0
5 Barbending machine Nos 1
6 Cutting torch Nos 1
7 Plate compactor Nos 0
8 1.5 HP pump Nos 1
9 1.5 HP pump Nos 1
10 Sany 35 Excavator Nos 1
DATE: MIPL GC KMRL
SIGNATURE
NAME Sudheesh Divan
Month and year AUG 2022
KOCHI WATER METRO PROJECT Agreement No KMW-C-11
Package 1 Report No 0
(PHASE1; STAGE- 1A) Location VYTTILA
Date 7/4/2022
SL NOBOQ ITEM NO. WORK EXECUTED / ACTIVITIES PERFORMED LOCATION UNIT QUANTITY PREVIOUS CUM.QTY TOTAL CUM.QTY REMARKS
7
Excavation works
8
Water Proofing
SIGNATURE
KMRL
NAME
Sudheesh Divan
…………………………………………………………………………
………………………………………………………………………………………………………………………………………………………….
Month and year AUG 2022
KOCHI WATER METRO PROJECT Agreement No KMW-C-11
Package 1 Report No 0
(PHASE1; STAGE- 1A) Location VYTTILA
Date 7/4/2022
DAILY MATERIAL DELIVERY REPORT
Covid 19
DATE : MIPL GC KMRL
SIGNATURE
NAME Sam Kurian
Month and year AUG 2022
KOCHI WATER METRO PROJECT Agreement No KMW-C-11
Package 1 Report No 0
(PHASE1; STAGE- 1A) Location VYTTILA
Date 7/4/2022
HINDRANCES
DELAYED
Sl No. START END DAYS/
DESCRIPTION DATE DATE HOURS REMARKS
1 RA 1 payment pending 2/1/2020 7/4/2022 884
SITE PHOTOS