0% found this document useful (0 votes)
15 views13 pages

dpr format

The document contains daily reports for the Kochi Water Metro Project, detailing manpower, machinery, materials, safety statistics, and hindrances for the month of August 2022. It includes specific information about technical and non-technical staff, equipment used, work executed, and any delays encountered. The reports are signed by Sudheesh Divan and provide a comprehensive overview of the project's status and challenges.

Uploaded by

JITHESH K G GVR
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
15 views13 pages

dpr format

The document contains daily reports for the Kochi Water Metro Project, detailing manpower, machinery, materials, safety statistics, and hindrances for the month of August 2022. It includes specific information about technical and non-technical staff, equipment used, work executed, and any delays encountered. The reports are signed by Sudheesh Divan and provide a comprehensive overview of the project's status and challenges.

Uploaded by

JITHESH K G GVR
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 13

Chart Title

4.5

3.5

2.5

1.5

0.5

0
9 10 11 13
1 2 3 4 5 6 7 8 B 11 12 C 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33

MZUZU CITY ROADS

DESCRIPTION Technical Staff

WORK DETIALS Min Temp: 13degree celcius DAY


Month and year Agreement No Report No Location Date NIGHT
AUG 2022 MZUZU 4/07/2022
Month and year AUG 2022
MZUZU CITY ROADS Agreement No
Report No
Location MZUZU
Date 4/07/2022
Max Temp: 25degree celcius Min Temp: 13degree celcius
DAILY MANPOWER REPORT
SL.NO DESCRIPTION WORK DETIALS DAY NIGHT

A Technical Staff
1 Sr Site agent(Shibu) Coordinating project works 1
2 Site agent (Jithesh) Managing Quality tests 0
3 Site agent (mustafa) BBS and Bill 1
4 Mechanical (Alex) Controlling all mechanical works at site 0
5 Safetyofficer(Sam kurien) safety supervising 1
6 QC Engineer(Arun) Managing Quality tests 0
7 MEP Engineer (Vijesh V) Controlling all MEP works at site 0
8 Engineer (Jayakrishnan) Site supervising 0
9 QS(Arya Suresh ) BBS and Bill 1
10 Engineer Trainee (Jithu ) Site supervising 1

11 QS Engineer Trainee(Abina Joseph ) 1

B Non Technical Staff


11 Accountant (Basil) Accounts 0
12 Store(Alex) Stores 0
13 Accountants & Stores(Manoj Kumar Unnithan ) Accounts &Stores 1

C Skilled
14 Painting workers painting works 0
15 Bar benders Bar bending &Shuttering 0

16 Carpender shuttering works 0

17 Helper all helping works 0

18 Operators (crane/excavator) Machine operating 1


19 operator helper helping operator 0
20 Mason Drain work 2
21 Helper for masonary works 0
22 Electrican Electrical works 0
23 welder steel welding 0
24 welder helper waterproofing works 0
25 fabrication steel work 4
26 Plumbing work plumbing 0
27 Aluminium Fabrication aluminium work 0
28 Water Proofing Work water proofing 0
29 bolt fixers steel bolt and anchorage work 0
30 Mason Plastering Works 4
31 Helper Flooring Works 0
32 Flooring Works Tile Flooring works 4
Unskilled
33 Labours All site works 3
Total 18
DATE: MIPL GC KMRL
SIGNATURE:
NAME: Sudheesh Divan
Month and year AUG 2022
KOCHI WATER METRO PROJECT Agreement No KMW-C-11
Package 1
Report No 0
(PHASE1; STAGE- 1A)
Location VYTTILA
Date 7/4/2022
DAILY PLANT AND MACHINERIES

SL.NO MACHINERIES WORK DESCRIPTION UNIT QUANTITY REMARKS

1 Generator Nos 1
2 Welding Set Nos 1
3 3 HP Water Pump Nos 1
4 Compression testing Machine Nos 0
5 Barbending machine Nos 1
6 Cutting torch Nos 1
7 Plate compactor Nos 0
8 1.5 HP pump Nos 1
9 1.5 HP pump Nos 1
10 Sany 35 Excavator Nos 1
DATE: MIPL GC KMRL
SIGNATURE
NAME Sudheesh Divan
Month and year AUG 2022
KOCHI WATER METRO PROJECT Agreement No KMW-C-11
Package 1 Report No 0
(PHASE1; STAGE- 1A) Location VYTTILA
Date 7/4/2022

SL NOBOQ ITEM NO. WORK EXECUTED / ACTIVITIES PERFORMED LOCATION UNIT QUANTITY PREVIOUS CUM.QTY TOTAL CUM.QTY REMARKS

1 Steel Facde work Commercial building

Connecting bridge ,Fin wall,


2 Plastering Work
plastering

3 Steel work Nil

commercial building-putty works


&Connecting corridor ,,primer
4 Painting work
applying at GF,Connecting bridge
ceiling putty work

5 Flooring work Connecting bridge wall tile work

7
Excavation works

8
Water Proofing
SIGNATURE
KMRL
NAME
Sudheesh Divan
…………………………………………………………………………
………………………………………………………………………………………………………………………………………………………….
Month and year AUG 2022
KOCHI WATER METRO PROJECT Agreement No KMW-C-11
Package 1 Report No 0
(PHASE1; STAGE- 1A) Location VYTTILA
Date 7/4/2022
DAILY MATERIAL DELIVERY REPORT

SL.NO ITEM DESCRIPTION UNIT QTY REMARKS


1 nill 0 0
2
3

DATE MIPL GC KMRL


SIGNATURE
NAME Sudheesh Divan
Month and year AUG 2022
KOCHI WATER METRO PROJECT Agreement No KMW-C-11
Package 1 Report No 0
(PHASE1; STAGE- 1A) Location VYTTILA
Date 7/4/2022
DAILY MATERIAL CONSUMPTION REPORT

SL.NO ITEM WORK DESCRIPTION UNIT QTY REMARKS

DATE: MIPL GC KMRL


SIGNATURE
NAME Sudheesh Divan
Month and year AUG 2022
KOCHI WATER METRO PROJECT Agreement No KMW-C-11
Package 1 Report No 828
(PHASE1; STAGE- 1A) Location VYTTILA
Date 7/4/2022
DAILY SAFETY STATISTICS

SL.NO ITEM LOCATION DESCRIPTION


REMEDIAL ACTION
1 Reportable fatal accidents - - -
2 Reportable non-fatal accidents - - -
3 Dangerious occurences - - -
4 Near miss cases - - -
5 Environmental incidents - - -
6 First aid cases
SL.NO ITEM LOCATION MATTERS DISCUSSED ACTION TAKEN

1 Tool box/PEP talk Work at Height

Covid 19
DATE : MIPL GC KMRL
SIGNATURE
NAME Sam Kurian
Month and year AUG 2022
KOCHI WATER METRO PROJECT Agreement No KMW-C-11
Package 1 Report No 0
(PHASE1; STAGE- 1A) Location VYTTILA
Date 7/4/2022
HINDRANCES
DELAYED
Sl No. START END DAYS/
DESCRIPTION DATE DATE HOURS REMARKS
1 RA 1 payment pending 2/1/2020 7/4/2022 884

2 RA 2 payment pending 3/4/2020 7/4/2022 852

3 RA 3 payment pending 5/12/2020 7/4/2022 783

Commercial building - revised structural glazing


4 11/30/2021 7/4/2022 216
and lift drawings are pending

5 Steel fabrication work stopped due to heavy rain 7/4/2022 7/4/2022 1

DATE: MIPL GC KMRL


SIGNATURE
NAME Sudheesh Divan
Month and year MARCH 2021
KOCHI WATER METRO PROJECT Agreement No KMW-C-11
Package 1 Report No 451
(PHASE1; STAGE- 1A) Location VYTTILA
Date 13.03.2021

SITE PHOTOS

ORGANISATION MIPL GC KMRL


NAME
SIGNATURE
DATE