The document outlines a structured questionnaire designed to collect data on the relationship between ex-ante evaluation, stakeholder engagement, and construction standards in the implementation of mega construction projects in Kenya. It includes both closed-ended and open-ended questions across four sections, focusing on feasibility studies, stakeholder participation, compliance with construction standards, and the combined effect of these variables on project outcomes. The questionnaire aims to gather quantitative and qualitative insights to inform the study's research objectives.

Uploaded by

Steve
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
64 views2 pages

Questionairres

The document outlines a structured questionnaire designed to collect data on the relationship between ex-ante evaluation, stakeholder engagement, and construction standards in the implementation of mega construction projects in Kenya. It includes both closed-ended and open-ended questions across four sections, focusing on feasibility studies, stakeholder participation, compliance with construction standards, and the combined effect of these variables on project outcomes. The questionnaire aims to gather quantitative and qualitative insights to inform the study's research objectives.

Uploaded by

Steve
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

3.6.

1 Questionnaire
The primary data collection tool for this study will be a structured questionnaire designed to align with
the research objectives. It will incorporate both closed-ended and open-ended questions to allow for the
collection of both quantitative and qualitative data. Closed-ended questions, including Likert scale items,
will provide standardized responses for statistical analysis, while open-ended questions will offer deeper
insights into respondents’ perspectives.

The questionnaire will be structured according to the study's objectives. The first objective aims to
examine the relationship between ex-ante evaluation and the implementation of mega construction
projects in Kenya. Questions in this section will focus on key elements of ex-ante evaluation, including
feasibility analysis, risk assessment, and cost-benefit analysis. Respondents will be asked to evaluate the
comprehensiveness of feasibility studies and the effectiveness of risk assessments. An example of a
question in this section would be: "On a scale of 1–5, how comprehensive do you find feasibility studies
conducted for mega projects?"

The second objective seeks to assess the moderating role of stakeholder engagement in the relationship
between ex-ante evaluation and project implementation. This section will explore the extent of
stakeholder participation, including community involvement, government agency engagement, and
investor collaboration. Questions will gauge the perceived impact of stakeholder engagement on project
outcomes. One such question may ask: "Rate the extent to which community consultations influence
project outcomes (1–5)."

The third objective examines the influence of construction standards on the implementation of mega
projects. Questions will assess compliance with regulatory standards and the effectiveness of quality
assurance mechanisms. Participants will provide insights into how frequently project evaluations include
a review of construction standards. A sample question could be: "How often do project evaluations
include a review of construction standards? (Rarely, Occasionally, Frequently)."

The final objective investigates the combined effect of ex-ante evaluation, stakeholder engagement, and
construction standards on project implementation. This section will feature composite questions that
address the interplay of these three key variables. Respondents will assess the extent to which their
integration enhances project success. An example of a question in this section is: "To what extent do you
agree that the integration of ex-ante evaluation, stakeholder engagement, and construction standards
improves project outcomes? (Strongly Disagree to Strongly Agree)."
Questionnaire for Mega Construction Projects in Kenya

Section A: Ex-Ante Evaluation

1. How comprehensive do you find feasibility studies conducted for mega projects? (1–5 scale)
2. How effective is the risk assessment process in identifying potential project risks? (1–5 scale)
3. To what extent are cost-benefit analyses integrated into the initial project evaluation? (1–5 scale)
4. How well do feasibility studies address environmental impact considerations? (1–5 scale)
5. How often are alternative project designs considered during feasibility studies? (Rarely,
Occasionally, Frequently)
6. What are the primary challenges encountered during the feasibility study phase? (Open-ended)

Section B: Stakeholder Engagement

7. Rate the extent to which community consultations influence project outcomes. (1–5 scale)
8. How frequently are government agencies involved in project decision-making? (Rarely,
Occasionally, Frequently)
9. How effective is investor collaboration in shaping project implementation strategies? (1–5 scale)
10. How transparent is the stakeholder engagement process? (1–5 scale)
11. What are the most significant barriers to effective stakeholder engagement? (Open-ended)
12. How would you improve the stakeholder engagement process? (Open-ended)

Section C: Construction Standards

13. How often do project evaluations include a review of construction standards? (Rarely,
Occasionally, Frequently)
14. How compliant are projects with national construction regulations? (1–5 scale)
15. How effective are quality assurance mechanisms in ensuring construction standards? (1–5 scale)
16. What are the most common challenges in meeting construction standards? (Open-ended)
17. How would you rate the role of third-party inspectors in maintaining construction quality? (1–5
scale)

Section D: Combined Effect of Variables

18. To what extent do you agree that the integration of ex-ante evaluation, stakeholder engagement,
and construction standards improves project outcomes? (Strongly Disagree to Strongly Agree)
19. How significant is the combined effect of these three factors on the timely completion of
projects? (1–5 scale)
20. What additional factors would enhance the success of mega construction projects? (Open-ended)