Site eval

The document evaluates three potential sites (Site A, Site B, and Site C) based on natural, environmental, physical, legal, administrative, aesthetic, socio-economic, and cultural factors. Site A and Site B are rated as highly feasible with average percentages of 45% and 44.33% respectively, while Site C is deemed feasible with a lower average of 32.67%. Key considerations include land area, accessibility, soil stability, utilities, climate, and compliance with zoning regulations.

Uploaded by

Cristine Arpon
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
3 views6 pages

Site eval

The document evaluates three potential sites (Site A, Site B, and Site C) based on natural, environmental, physical, legal, administrative, aesthetic, socio-economic, and cultural factors. Site A and Site B are rated as highly feasible with average percentages of 45% and 44.33% respectively, while Site C is deemed feasible with a lower average of 32.67%. Key considerations include land area, accessibility, soil stability, utilities, climate, and compliance with zoning regulations.

Uploaded by

Cristine Arpon
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 6

Natural, Environmental and Physical Factors

Description Issues and Compliance


or Site A. (Dalig Site B. (San Jose Site C. (San Jose
Parameters % Antipolo) Rate Antipolo) Antipolo) Rate
Rate
Land Area and Lot Size
The lot size The lot has 3.20 The lot has 5.60 The lot has 5.20
should be hectares of land for hectares of land hectares of land and
exceed the the facility and facility facility
minimum 5 5 5
requirement (10%) (10% (10%)
of 600 sqm 10 )
of the Lot in
NBCP
Acessibility
The site is The site is The site is The site is accessible
accessed by accessible via accessible via via jeepneys, bikes,
private cars jeepneys, bikes, jeepneys, bikes, 5 private cars and 5
and tricycles private cars and 5 private cars and (10%) tricycles (10%)
tricycles (10%) tricycles
10

Soil Characteristics and Conditions


Soil must be The most common The most common The most common
stable soil of the site is 5 soil of the site is 5 soil of the site is
Marikina clay loam (10%) Marikina clay loam (10%) Marikina clay loam 3
and is stable and is stable but its on the steep (6%)
10 slope and higly
susceptible to
landslides
Acessibility of Utilities and Services
Existing The site has The site has The site has
utilities and access to Nawasa, 5 access to Nawasa, 5 access to Nawasa, 5
services must Meralco, Power (10%) Meralco, Power (10%) Meralco, Power (10%)
be available Lines and other Lines and other Lines and other
within the site Telecommunicatio Telecommunication Telecommunication
10 n Signal Signal Signal
Vegetation
Site has 40% The site has more The site has more The site has more
vegetation than 40% of 5 than 40% of 5 than 40% of 5
vegetation (10%) vegetation (10%) vegetation (10%)

10
Vulnerabilities to Natural Hazard
Site shall be Site is less 5 Site is less 5 Site is within the 2
free of any susceptible to flood, (10%) susceptible to flood, (10%) active fault line and (4%)
potential landslides but is landslides but is is very highly
damage injury 1km from the fault 1km from the fault susceptible in
from natural line line landslides
hazards 10

Site Drainage
Site must
have definite
drainage with Site has proper 5 Site has proper 5 Site has proper 5
no drainage (10%) drainage (10%) drainage (10%)
unnecessary
water coming 10
from the
adjacent
properties
Topography
Site must have The site has 5 The site has very 5 The site has has 1
0-5% or very relatively (10%) relatively flat slope (10%) steep sloping (2%)
relatively flat 10 flat slope
slope
Site Drainage
Site must have Site has proper 5 Site has proper 5 Site has proper 5
definite drainage (10% drainage (10%) drainage (10%)
drainage with )
no
unnecessary
water coming 10
from the
adjacent
properties
Climate
Site shall have The site has fair 4 The site has fair 4 The site has 4
good climate climate and (8%) climate and weather (8%) fair climate and (8%)
and weather weather conditions weather
condition conditions conditions

10
Orientation and Views
Site must have The site has The site has natural a The site is at
good natural view of 4 partial view of a 4 the river and 2
orientation the good scenary (4%) natural scenary and (4%) doesn’t had a (2%)
scenic and mountains of Antipolo natural scenic
natural view 5 view
Future Expansion Plan
Site may have The site is enough 3 The site has enough 4 Some variance 4
a larger area for the facility and (3%) area for additional (4%) are approved (4%)
for additional no extra lot for the amenities for property for the future
amenities for future expansion development expansion
the property
development 10
Total 100% SITE A 55% SITE B 56% SITE C 47%

Legal, Institutional and Administrative and Aesthetic Factors


Description Issues and Compliance
or Site A. (Dalig Site B. (San Jose Site C. (San Jose
Parameters % Antipolo) Rate Antipolo) Antipolo)
Rate Rate
Proper Land Use and Zoning
Site should The lot is under the The lot is under the The lot is under
comply with institutional and agricultural and agricultural and
the current residential zone of residential zone of residential zone of
zoning and the municipality of 5 the municipality of 3 the municipality of 3
land use Antipolo (10%) Antipolo (6%) Antipolo (6%)
classification 10
- Institutional
Zone and
Use
Development
Ease of Ownership
The site is The site has only The site has only The site has only
relatively one owner one owner one owner
undivided
4 4 4
(25%) (25%) (25%)
25

Land Cost
Site is at Site Area is 3.20 Site area is at 5.66 Site Area has 5.20
reasonable hectares and land 3 hectares and land hectares and land
value cost is 6,855 000 (26%) cost is 18, 022, 000 2 cost is 9, 722,750 2
million millioin (17%) million (17%)
35
Adjacent Land Use
Site should be The site is near The site is near The site is near
perfectly subdivision and 4 subdivision and 4 subdivision and 5
related with the adjacent to other (16%) adjacent to other (16%) adjacent to other (20%)
adjacent land commercial and commercial and commercial and
use and residential residential buildings. residential buildings.
surrounding 20 buildings. The site The site is The site is
context such is approximately approximately 500 approximately 900
as healthcare 500 meters away meters away from meters away from
facilities, from the barangay the barangay hall the barangay hall
barangay, hall and 280 and 280 meters and 1 kilometers
police station meters away from away from the police away from the police
and so on. the police station station station
TOTAL 100 % Site A. 37% Site B. 34% Site C. 35%
Socio- Economic Cultural Factors
Description Issues and Compliance
or
Parameters % Site A. (Dalig Site B. (San Jose Site C. (San Jose
Antipolo) Antipolo) Antipolo)
Rate Rate Rate
Site Potential
Site shall The lot is open for The lot is open for all The lot is open for all
open for all all possible users possible users to possible users to
possible to offer healthcare offer healthcare offer healthcare
users and to treatments treatments treatments
offer
healthcare Also to give 5 5 5
servces to oppurtunities for
25 the professionals (25%) (25%) (25%)
affected
barangays
and other
nearby sites
Must be within Urban Areas
Site shall be The site is within The site is within an The site is a
in an area an urbanized area urbanized area and progressive
where people and serves as the serves as the center urbanized area
have no center of the place 3 of the place 3 5
direct access
to heathcare (12%) (12%) (25%)
services 25

Acessibilty to Important Existing Facilities


Site shall Site is near to Site is near to clinics The site is nearby
have access clinics, police (less than 1 km ( more on)
to other station and 5 away) and other commercial area.
major barangay hall (less (25%) necessary 5 The site is 4
functional than 1km away) development approximately 900
complexes, 25 and adjacent to (25%) meters away from (20%)
like Hospitals other commercial the barangay hall
Clinics and and residential and 1km away from
Infirmary buildings the police station
Pedestrian Acess and Circulation

Site shall The site can have The site can have The site does not
have pedestrian access pedestrian access to have a good traffic
pedestrian to be constructed 5 be constructed 4 system since it is 2
access and and has two way (25%) (20%) near to intersection (10%)
traffic control path for lanes and no good
system transportation and traffic signs and
25 has traffic signs system

TOTAL 100 % Site A. 43% Site B. 43% Site C. 16%

Average Percentage and Description of Evaluated Factors from the Three Potential Sites

SITES
SITE Site A. (Dalig Antipolo) Site B. (San Jose Site C. (San Jose
FACTORS Antipolo) Antipolo)
% % %
Natural Environmental 55% 56% 47%
and Physical Factors
Legal Administrative and 37% 34% 35%
Aesthetic Factors
Socio-Economic and 43% 43% 16%
Cultural Factors
Average Percentage 45% 44.33% 32.67%
and Description (Highly Feasible) (Highly Feasible) Feasible