When the ASME Code cannot be followed because of its new construction .2
orientation (new or revised material specifications, inspection requirements,
certain heat treatments and pressure tests, and stamping and inspection
requirements), the engineer or inspector shall conform to this inspection code
.rather than to the ASME Code
The owner-user’s inspection program shall provide the controls that are .4
.necessary when contract inspectors are used
Examiner: A person who assists the API authorized pressure vessel inspector .5
by performing specific NDE on pressure vessels but does not evaluate the
results of those examinations in accordance with API 510, unless specifically
trained and authorized to do so by the owner or user
The API authorized pressure vessel inspector may be assisted in performing .10
visual inspections by other properly trained and qualified individuals, who may or
may not be certified vessel inspectors
Personnel performing nondestructive examination shall meet the .11
qualifications identified in 3.18 but need not be API authorized pressure vessel
inspectors. However, all examination results must be evaluated and accepted by
.the API authorized pressure vessel inspector
The authorized pressure vessel inspector should be familiar with the .13
operating conditions of the vessel and with the causes and characteristics of
.potential defects and deterioration
Long-term and short-term corrosion rates should be compared as part of the .19
data assessment. The authorized inspector, in consultation with a corrosion
.specialist, shall select the corrosion rate that best reflects the current process
The determination of corrosion rate may include thickness data collected at .20
more than two different times. Suitable use of short-term versus long-term
.corrosion rates shall be determined by the authorized pressure vessel inspector
When the authorized pressure vessel inspector believes that a pressure test .22
is necessary or when, after certain repairs or alterations, the inspector believes
that one is necessary (see 7.2.9), the test shall be conducted at a pressure in
accordance with the construction code used for determining the maximum
.allowable working pressure
Before any repairs or alterations are performed, all proposed methods of .23
execution, all materials, and all welding procedures that are to be used must
be approved by the authorized pressure vessel inspector and, if necessary, by a
pressure vessel engineer experienced in pressure vessel design, fabrication, or
.inspection
All repair and alteration work must be authorized by the authorized pressure .24
vessel inspector before the work is started by a repair organization
The authorized pressure vessel inspector will designate the fabrication .25
.approvals that are required
The authorized pressure vessel inspector may give prior general .26
authorization for limited or routine repairs as long as the inspector is sure that the
.repairs are the kind that will not require pressure tests
The authorized pressure vessel inspector shall approve all specified repair .27
and alteration work after an inspection of the work has proven the work to be
.satisfactory and any required pressure test has been witnessed
No crack shall be repaired without authorization from the authorized pressure .28
.vessel inspector
The repair organization shall maintain records of its qualified welding .29
procedures and its welding performance qualifications. These records shall be
.available to the inspector prior to the start of welding
After the weld is completed, it shall be examined again by either of the above .30
methods to determine that no defects exist using acceptance standards
acceptable to the Inspector or code of construction most applicable to the work
.planned
Temporary repairs may remain in place for a longer period of time only if .35
evaluated, approved, and documented by the pressure vessel engineer and the
.authorized API pressure vessel inspector
A full encirclement lap band repair may be considered a long term repair if .37
the design is approved, and documented by the pressure vessel engineer and
.the authorized API pressure vessel inspector
For cases where UT is substituted for radiographic inspection, the owner/user .41
shall specify industry-qualified UT shear wave examiners for closure welds that
have not been pressure tested and for weld repairs identified by the pressure
.vessel engineer or authorized inspector
The pressure vessel inspection and rerating is acceptable to the authorized .42
.pressure vessel inspector
The pressure vessel rerating will be considered complete when the .43
authorized pressure vessel inspector oversees the attachment of an additional
:nameplate or additional stamping that carries the following information
Rerated by
Maximum Allowable Working Pressure psi at F
Date
Copyright American Petroleum Institute
An API 510 authorized pressure vessel inspector certificate may be issued .44
when an applicant provides documented evidence of passing the National Board
of Boiler and Pressure Vessel Inspectors examination and meets all
.requirements for education and experience of API 510
An API certificate for an authorized pressure vessel inspector is valid for .45
.three years from its date of issuance
Once every other recertification period, (every six years) inspectors actively .48
engaged as an authorized pressure vessel inspector shall demonstrate
knowledge of revisions to API 510 that were instituted during the previous six
.years