Metal Building - Layer 10000 Birds FINAL
Metal Building - Layer 10000 Birds FINAL
Description of Material
S.No Required
Unit wt
I. Structure Size No in Kgs Unit length Unit Rate Amount
Side Pillars Square
1 Pipe 4.0" / 4.0 mm 46 72 20 ft INR 79.00 INR 261,648.00
Center Pillars Square
2 Pipe 4.0" / 2.9 mm 34 53 20 ft INR 78.00 INR 140,556.00
Platform Running
3 Square Pipe 2.0" / 2.9 mm 125 24 20 ft INR 64.50 INR 193,500.00
4 Cross Square Pipe 2.0" / 2.0 mm 37 20 20 ft INR 60.00 INR 44,400.00
8 Top Pipe Square Pipe 2.0" / 110 24 20 ft INR 78.00 INR 205,920.00
9 Cross Pipe Square Pipe 1.5" X 1.5" / 90 16 20 ft INR 78.00 INR 112,320.00
10 Perling Round Pipe 2.0 " /ID 135 19 20 ft INR 78.00 INR 200,070.00
11 C CHANNEL 4" 4" 5 MM 1 1 20FT INR 6,000.00 INR 6,000.00
12 C CHANNEL3" 3 " 5 MM 1 1 20FT INR 4,000.00 INR 4,000.00
13 ANGLE 2 " 5MM 2 " 5 MM 5 12 20 FT INR 500.00 INR 30,000.00
14 ROUND PIPE 1" 1" 20 12 20FT INR 78.00 INR 18,720.00
11 Main Electrity
12 Generator 25 KVA 1 INR 350,000.00 INR 350,000.00
13 Bore 2 2 1 INR 50,000.00 INR 100,000.00
14 Water Supply 1 INR 50,000.00 INR 50,000.00
15 Main Gate 1 INR 50,000.00 INR 50,000.00
16 Security Room 1 INR 50,000.00 INR 50,000.00
17 Civil Work
18 Cement 200 200 50 200 INR 450.00 INR 90,000.00
IV Equipment Required
Welding Machine MIN
1 300 AMP 2 2 2 INR 35,000.00 INR 70,000.00
2 Metal Cutter 1 INR 25,000.00 INR 25,000.00
3 Metal Grinter 1 INR 15,000.00 INR 15,000.00
Welding Rods 14" 10
4 NO 6 INR 1,500.00 INR 9,000.00
METAL CUTTER
5 BLADES 14" 50 1 1 INR 300.00 INR 15,000.00
METAL GRINDER
6 BLADES 4" 50 INR 150.00 INR 7,500.00
ELECTRICAL WIRE
7 6MM COPPER 1000FT
ELECTRICAL WIRE
8 2.5MM COPPER 500 FT
V NO OF HOUSES
VI CEMENT 120 1 450 INR 54,000.00
ROD 10MM 1 1 1 INR 10,000.00 INR 10,000.00
20 MM STONE 500 1 1 INR 10,000.00 INR 10,000.00
STAND 500 1 1 INR 150.00 INR 75,000.00
BINDING WIRE 20 1 1 INR 150.00 INR 3,000.00
PLANE SHEET TIN 4 250 50 INR 50,000.00
Cost of
VIII Implementation 10080 INR 90.00 INR 907,200.00
INR 9,635,164.00
11 Main Electrity
12 Generator 25 KVA 1 INR 350,000.00 INR 350,000.00
13 Bore 1 1 1 INR 50,000.00 INR 50,000.00
14 Water Supply 1 INR 50,000.00 INR 50,000.00
15 Main Gate 1 INR 50,000.00 INR 50,000.00
16 Security Room 1 INR 50,000.00 INR 50,000.00
17 Civil Work
18 Cement 200 200 50 200 INR 400.00 INR 80,000.00
V Equipment Required
Welding Rods 2 2 2 INR 25,000.00 INR 50,000.00
CUTTER BLADES 14" 1 INR 25,000.00 INR 25,000.00
CUTTER BLADES 4" 1 INR 15,000.00 INR 15,000.00
1 INR 1,500.00 INR 1,500.00
V NO OF HOUSES 2
VII COST OF BIRD UPTO 20 WEEKS 10080 1 1 INR 450.00 INR 4,536,000.00