Metal Building - Layer 10000 Birds FINAL

The document outlines the material requirements and costs for two poultry projects, each accommodating 10,080 birds. It details various structural components, cage materials, equipment, and civil work, along with their respective quantities, unit weights, rates, and total amounts. The total estimated cost for both projects is approximately INR 19,270,444.50.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
8 views5 pages

Metal Building - Layer 10000 Birds FINAL

The document outlines the material requirements and costs for two poultry projects, each accommodating 10,080 birds. It details various structural components, cage materials, equipment, and civil work, along with their respective quantities, unit weights, rates, and total amounts. The total estimated cost for both projects is approximately INR 19,270,444.50.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

CHICKS CUM GROWER Project 10,080 birds 180 ft X 48 ft

Description of Material
S.No Required
Unit wt
I. Structure Size No in Kgs Unit length Unit Rate Amount
Side Pillars Square
1 Pipe 4.0" / 4.0 mm 46 72 20 ft INR 79.00 INR 261,648.00
Center Pillars Square
2 Pipe 4.0" / 2.9 mm 34 53 20 ft INR 78.00 INR 140,556.00
Platform Running
3 Square Pipe 2.0" / 2.9 mm 125 24 20 ft INR 64.50 INR 193,500.00
4 Cross Square Pipe 2.0" / 2.0 mm 37 20 20 ft INR 60.00 INR 44,400.00

5 SupportingSquare Pipe 2.0" / 2.0 mm 95 20 20 ft INR 60.00 INR 114,000.00


6 Flat Patti 2.0" / 3.0 mm 660 11 20 ft INR 64.50 INR 468,270.00
7 ANGLE 1.5" 5 MM 1.5" 5 MM 70 10 20 FT INR 64.50 INR 45,150.00

II. Truss Material

8 Top Pipe Square Pipe 2.0" / 110 24 20 ft INR 78.00 INR 205,920.00

9 Cross Pipe Square Pipe 1.5" X 1.5" / 90 16 20 ft INR 78.00 INR 112,320.00
10 Perling Round Pipe 2.0 " /ID 135 19 20 ft INR 78.00 INR 200,070.00
11 C CHANNEL 4" 4" 5 MM 1 1 20FT INR 6,000.00 INR 6,000.00
12 C CHANNEL3" 3 " 5 MM 1 1 20FT INR 4,000.00 INR 4,000.00
13 ANGLE 2 " 5MM 2 " 5 MM 5 12 20 FT INR 500.00 INR 30,000.00
14 ROUND PIPE 1" 1" 20 12 20FT INR 78.00 INR 18,720.00

15 Asbestous Sheet mtr 3 300 900 INR 185.00 INR 166,500.00


16 Asbestous Sheet mtr 0 216 0 INR 185.00 INR 0.00
Square Pipe J Bolt 9 "
17 /2 " 9" / 2" 1500 1 INR 20.00 INR 30,000.00
18 Metal Washers 1500 1 INR 5.00 INR 7,500.00

19 Rubber / Tar Washers 1500 1 INR 5.00 INR 7,500.00


20 PAINTS 40 1 INR 200.00 INR 8,000.00
21 REDOXIDE/PRIMER 40 1 INR 200.00 INR 8,000.00
22 THINNER 30 1 INR 50.00 INR 1,500.00

Cage Material All 18" X18" X18"


III. Material 4 Birds /18" X18" X15" 10080 INR 85.00 INR 856,800.00
1 Cages
2 Plastic Nipple Pipes
3 Nipples 360
4 Plastic Feeders

5 Pipe Line 1 Shed 2 2 1 INR 15,000.00 INR 30,000.00


6 Side Jalli 460 FT X 10.5 4830 17 INR 17.00 INR 82,110.00
7 SIDE Jalli 6FT 500 FT X 6 FT 3000 17 INR 17.00 INR 51,000.00
8 Lighting 400 50 INR 50.00 INR 20,000.00
9 Brooding lighting INR 45,000.00
10 Layer lighting

11 Main Electrity
12 Generator 25 KVA 1 INR 350,000.00 INR 350,000.00
13 Bore 2 2 1 INR 50,000.00 INR 100,000.00
14 Water Supply 1 INR 50,000.00 INR 50,000.00
15 Main Gate 1 INR 50,000.00 INR 50,000.00
16 Security Room 1 INR 50,000.00 INR 50,000.00

17 Civil Work
18 Cement 200 200 50 200 INR 450.00 INR 90,000.00

IV Equipment Required
Welding Machine MIN
1 300 AMP 2 2 2 INR 35,000.00 INR 70,000.00
2 Metal Cutter 1 INR 25,000.00 INR 25,000.00
3 Metal Grinter 1 INR 15,000.00 INR 15,000.00
Welding Rods 14" 10
4 NO 6 INR 1,500.00 INR 9,000.00
METAL CUTTER
5 BLADES 14" 50 1 1 INR 300.00 INR 15,000.00
METAL GRINDER
6 BLADES 4" 50 INR 150.00 INR 7,500.00
ELECTRICAL WIRE
7 6MM COPPER 1000FT
ELECTRICAL WIRE
8 2.5MM COPPER 500 FT

V NO OF HOUSES
VI CEMENT 120 1 450 INR 54,000.00
ROD 10MM 1 1 1 INR 10,000.00 INR 10,000.00
20 MM STONE 500 1 1 INR 10,000.00 INR 10,000.00
STAND 500 1 1 INR 150.00 INR 75,000.00
BINDING WIRE 20 1 1 INR 150.00 INR 3,000.00
PLANE SHEET TIN 4 250 50 INR 50,000.00

COST OF BIRD UPTO


VII 20 WEEKS 10080 1 1 INR 450.00 INR 4,536,000.00

Cost of
VIII Implementation 10080 INR 90.00 INR 907,200.00
INR 9,635,164.00

Layer Project 10,080 birds 170ft X 48 ft


S.No Description of Material Required
I. Structure Size No Unit wt inUnit
Kgslength Unit Rate Amount
1 Side Pillars Square Pipe4.0" / 4.0 mm 42 72 20 ft INR 79.00 INR 238,896.00
2 Center Pillars Square Pipe
4.0" / 2.9 mm 26 53 20 ft INR 78.00 INR 107,484.00
3 Platform Running Square 2.0"
Pipe/ 2.9 mm 100 24 20 ft INR 64.50 INR 154,800.00
4 Cross Square Pipe 2.0" / 2.0 mm 27 20 20 ft INR 60.00 INR 32,400.00
5 SupportingSquare Pipe 2.0" / 2.0 mm 80 20 20 ft INR 60.00 INR 96,000.00
6 Flat Patti 2.0" / 3.0 mm 675 11 20 ft INR 64.50 INR 478,912.50
7 ANGLE 1.5" 5 MM 1.5" 5 MM 70 10 20 FT INR 64.50 INR 45,150.00

II. Truss Material


8 Top Pipe Square Pipe 2.0" / 99 24 20 ft INR 78.00 INR 185,328.00
9 Cross Pipe Square Pipe 1.5" X 1.5" / 81 16 20 ft INR 78.00 INR 101,088.00
10 Perling Round Pipe 2.0 " 126 19 20 ft INR 78.00 INR 186,732.00
11 C CHANNEL 4"
12 C CHANNEL3"
13 ANGLE 2 " 5MM
14 ROUND PIPE 1"

15 Asbestous Sheet mtr 3 350 1050 INR 185.00 INR 194,250.00


16 Asbestous Sheet mtr 0 216 0 INR 185.00 INR 0.00
17 J Square Pipe Bolt 9 "/29"/2 2000 1 INR 20.00 INR 40,000.00
18 Metal Washers 2000 1 INR 5.00 INR 10,000.00
19 Rubber / Tar Washers 2000 1 INR 5.00 INR 10,000.00
20 PAINTS 70 1 INR 200.00 INR 14,000.00
21 REDOXIDE/PRIMER 50 1 INR 200.00 INR 10,000.00
22 THINNER 50

III. Cage Material All Material


18" X15"
4 Birds
X18" 10080 125 INR 125.00 INR 1,260,000.00
1 Cages
2 Plastic Nipple Pipes
3 Nipples 360
4 Plastic Feeders

5 Pipe Line 1 shed 1 1 INR 15,000.00 INR 15,000.00


6 Side Jalli 220X2X10.5 4620 17 INR 17.00 INR 78,540.00

7 Lighting LAYER 400 50 INR 50.00 INR 10,000.00

11 Main Electrity
12 Generator 25 KVA 1 INR 350,000.00 INR 350,000.00
13 Bore 1 1 1 INR 50,000.00 INR 50,000.00
14 Water Supply 1 INR 50,000.00 INR 50,000.00
15 Main Gate 1 INR 50,000.00 INR 50,000.00
16 Security Room 1 INR 50,000.00 INR 50,000.00

17 Civil Work
18 Cement 200 200 50 200 INR 400.00 INR 80,000.00

V Equipment Required
Welding Rods 2 2 2 INR 25,000.00 INR 50,000.00
CUTTER BLADES 14" 1 INR 25,000.00 INR 25,000.00
CUTTER BLADES 4" 1 INR 15,000.00 INR 15,000.00
1 INR 1,500.00 INR 1,500.00

190 48 INR 0.00

V NO OF HOUSES 2

V1 CEMENT 120 1 450 INR 54,000.00


ROD 10MM 1 1 1 INR 10,000.00 INR 10,000.00
20 MM STONE 500 1 1 INR 10,000.00 INR 10,000.00
STAND 500 1 1 INR 150.00 INR 75,000.00
BINDING WIRE 20 1 1 INR 150.00 INR 3,000.00
PLANE SHEET TIN 4 250 50 INR 50,000.00

VII COST OF BIRD UPTO 20 WEEKS 10080 1 1 INR 450.00 INR 4,536,000.00

VIII Cost of Implementation 10080 1 1 INR 90.00 INR 907,200.00


INR 9,635,280.50