3- continu steel works bottom steel for raft 1 block no 2. 3- continu steel works bottom steel for raft 1 block no 2. 3-carpinter will start shutter for footing
4- started bottom steel for raft 1 block no 1 4- continu steel works bottom steel for raft 1 block no 1 4- carpenter work prior to start pcc for block 3.
5 5-
8
9
10
11
12
Concerns