electricity
electricity
(LMV-1) - (ST-10 Domestic Other Metered Urban - Other than Life Line)
Division Name Naubasta
Address (1714) PLOT NO 9 P BLOCK / KUNJ VIHAR / KANPUR Phone Number 8004986186
Bill Period
Book No /
Bill Grp Connection No. Account No. Supply Type Load(KW/KVA/BHP) Bill No.
From To Months
Meter No. Last Current Multiplying Consumed Solar Power Actual Status Bill Date PayableDate(Due
Reading(KWH/KVAH) Reading(KWH/KVAH) Factor Units(KWH/KVAH) Units(KWH/KVAH) Factor Demand Date)
DSK16543749 7296 / 0 7524 / 0 1.00 228 / 0 0/0 0.90 1.32 Normal 08/09/2020 15/09/2020
Bill Base Alloted Units Adjustment Units Total Units Total Demand Excess Solar Units Inoperative Security Extra Disconnection
Amount Amount Amount Date
3. Rebate upto Payable Date (-) 14.58 i) Previous Arrears / Arrear Count -0.26 + 0.00 / 0
5. Due for Minimum Charges / Regulatory Surcharge : 0.00/0.00 13. Previous Delay Surcharge 0
A) Assesment (+) 0.00 16. Total Payable Amount Before Due Date 1516.00
11. Credit 18. Total Payable Amt. After Due Dt. 1531.00
B) Temporary (-) (ISD Interest ) of (-) 0.00 20. Bill Date 08/09/2020
Assistant Engineer
WARNING PLEASE NOTE THAT EVERY BILL MUST BE PAID ON DUE DATE OR BEFORE DUE DATE OTHERWISE YOUR ELECTRICITY SUPPLY WILL BE DISCONNECTED WITHOUT ANY
INFORMATION UNDER THE 24(1) ACT OF INDIAN ELECTRICITY RULE 1910.
Book No. Sc No. Account No. Meter No. Meter Reading Date
Consumer Signature
1. Please mention connection no., book no., account no, name and address on the back of cheque/draft.
In case the present meter reading on verification found to be wrong/tampered. In such case consumer shall be penalised as per the revenue assesment.
1/2
10/8/2020 Bill
Back
Print this Online Bill
Privacy Policy | Terms and Conditions| Refund Policy | Feedback | Admin
© Kanpur Electricity Supply Company Limited., All Rights Reserved
2/2