This method statement outlines the procedures, responsibilities, and safety measures for a specific project activity, including risk assessments and site management. It emphasizes the importance of supervision, PPE requirements, waste disposal, and emergency procedures. Additionally, it details training protocols and welfare provisions for personnel on site.

Uploaded by

Muhamad Alfarisi
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
0 views

method-statement-blank

This method statement outlines the procedures, responsibilities, and safety measures for a specific project activity, including risk assessments and site management. It emphasizes the importance of supervision, PPE requirements, waste disposal, and emergency procedures. Additionally, it details training protocols and welfare provisions for personnel on site.

Uploaded by

Muhamad Alfarisi
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

asddd

Method Statement
Project

Activity

Description

Start Date Duration

Assessor Hours of Work

Responsibilities
Project
Manager

Supervisor

Team Size

Hazards
Hazards
Associated
With Activity

Site Specific
Hazards

Risk assessments will be carried out for the activity and attached to this method statement,
will form part of the induction and must be followed on site.

Work Procedure & Control Measures


The work will be supervised and monitored at all times by a competent supervisor.
All work is to be carried out following the risk assessments, construction phase plan, and
other H&S management documents in place.
Site compound and welfare facilities to be set up in an area agreed with the client or existing
welfare facilities to be used.
Conflicts with other working groups or work activities operating within the same area are

Method Statement 1/5


asddd

identified, and communication and liaison arrangements to control additional risks are put
in place.
The work area is to be securely cordoned off to prevent unauthorised access. Only authorised
personnel will be allowed access to the work area. All personnel (including visitors) must sign
in on arrival and sign out when leaving the site.
Appropriate signage will be displayed around the work area.
PPE to be worn at all times on site.

Training
Only qualified, certified or otherwise competent personnel will be permitted to undertake
the work.
All workers to undertake site induction before commencing work.
Toolbox talks will be carried out at weekly intervals during the works to raise awareness of
relevant H&S issues.

Waste Disposal
All current legislation regarding the prevention of environmental contamination (including
waste disposal) will be complied with.
Any contaminated or hazardous waste created by the works carried out will be safely
contained and disposed of through a specialist company.
Waste must get transferred using a waste transfer note.

Cleaning
After completing the work the area will be left in a clean and tidy condition, and all
associated waste shall be removed and properly disposed of.

Method Statement 2/5


asddd

PPE Requirements

Safety Hard Hat Hi-Viz Gloves Ear Dust Mask


Boots Clothing Defenders

Eye Harness Full Face Overalls RPE Other


Protection Shield

Other PPE

Additional PPE is required for certain activities as indicated by specific risk assessments.

Management Arrangements
Monitoring Arrangements

Monitoring of this activity will be carried out using a variety of different means such as:
inspections, checklists, meetings, audits, reviews, and employee consultation. The
supervisor will carry out regular inspections of the works and highlight any concerns.

First Aid Provision

• Nominated First Aider(s)


• First Aid Kit
• Accident Book

Method Statement 3/5


asddd

Welfare Provision

Welfare facilities will be provided within close proximity to the work area.
Personnel must not eat, drink or smoke in the work area.
Welfare facilities, including rest areas and toilet facilities, will be left as they were found in
a clean and tidy manner, and operatives are to ensure that they are reasonably clean and
tidy before entering premises.

Emergency Procedures

In the event of an accident notify the first aider immediately, for a major injury call 999 or
if in doubt call 111.
In the event of a fire sound the alarm and exit the site by the nearest exit, to not attempt
to tackle the fire unless you have been trained to do so and it is safe to do so.
In the event of discovering a material that you suspect could be asbestos containing,
stop work immediately and notify the site manager/supervisor for further instructions.

Completed By
Name

Signature

Date

Method Statement 4/5


asddd

Acknowledgement
Name Signature Date

Method Statement 5/5