The document outlines a Bill of Quantities for a construction project, detailing various categories such as Earthworks, Concrete Works, Rebars, Formworks, Masonry Works, Steel Works, Roofing, and Plumbing. Each category lists item descriptions, units, quantities, unit costs, and total amounts, culminating in a grand total of 484,229.11. Additionally, it provides a cost per square meter and emphasizes the need for a labor-to-materials ratio exceeding 30%.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
6 views
SAMPLE-BOQ
The document outlines a Bill of Quantities for a construction project, detailing various categories such as Earthworks, Concrete Works, Rebars, Formworks, Masonry Works, Steel Works, Roofing, and Plumbing. Each category lists item descriptions, units, quantities, unit costs, and total amounts, culminating in a grand total of 484,229.11. Additionally, it provides a cost per square meter and emphasizes the need for a labor-to-materials ratio exceeding 30%.