The document provides detailed quantity calculations for various construction activities including earthwork, stone soling, concrete work, formwork, and reinforcement for drainage and foundation projects. It outlines the dimensions, quantities, rates, and total amounts for each item, totaling significant volumes and weights of materials. The final calculations summarize the overall quantities required for the construction tasks specified.

Uploaded by

hatemalo2080
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views

Drain

The document provides detailed quantity calculations for various construction activities including earthwork, stone soling, concrete work, formwork, and reinforcement for drainage and foundation projects. It outlines the dimensions, quantities, rates, and total amounts for each item, totaling significant volumes and weights of materials. The final calculations summarize the overall quantities required for the construction tasks specified.

Uploaded by

hatemalo2080
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

Length Breadth Height

S.N Items Number Quantity Unit Rate Amount Remarks


(m) (m) (m)
1 Earthwork in excavation
Along the drainage alignmnet 1 3861.5 7.4 2.85 43268.49 m3

Total 43268.5 m3 51.22 2,216,194.49


2 Earthwork in back filling
2.1 upto foundation level 2 3861.5 9753.04 m3
2.2 from foundation to road level 2 3861.5 0.5 2.5 m3
Total 9753.03893 m3 180.34 1,758,863.04
3 Stone Solling
Foundation 1 3861.5 3649.148 m3
Total 3649.148 m3 4134.51 15,087,438.90
4 P.C.C work,M10
Foundation to bed level 1 3861.5 1197.076 m3
Total 1197.076 m3 13055.29 15,628,174.33
5 M20 Concreting
5.1 Bed part 1 3861.5 6.1 0.3 7066.545 m3
5.2 Top part 1 3861.5 6.1 0.3 7066.545 m3
5.3 Wall side 3 3861.5 0.3 2 6950.7 m3
5.4 Fillet 0.5 3861.5 0.15 0.15 43.441875 m3
5.5 Deduction
Man hole -12 0.84 0.84 0.3 -2.54016 m3
Total 21124.6917 m3 18017.94 380,623,427.84

6 Joint sealing
Sealing @30m interval along width 130 6.1 793 rm
Total 793 rm 1,081.45 857,589.85
7 Form work
7.1 Bed side
Long Side wall (Outer) 2 3861.5 2.3 17762.9 m2
Long Side wall (inner) 2 3861.5 2 15446 m2
short wall 387 10.7 0.3 1242.27 m2
Total form work 34451.17 m2 742.43 25,577,582.14
8 Reinforcement
Top Slab Total Length
Top main bars 16Ø@150mm c/c 25742 6.1 157026.2 248140.168 kg
Bottom main bars 16Ø@150mm c/c 25742 6.1 157026.2 248140.168 kg
Distribution bars 10Ø@150mm c/c 80 3861.5 308920 190691.358 kg
Bottom Slab
Top main bars 16Ø@150mm c/c 25742 6.1 157026.2 248140.168 kg
Bottom main bars 16Ø@150mm c/c 25742 6.1 157026.2 248140.168 kg
Distribution bars 10Ø@150mm c/c 80 3861.5 308920 190691.358 kg
Side Wall
Outside and Inside Wall Total Length kg
Vertical bars 16Ø@150mm c/c 154452 2.8 432465.6 683402.43 kg
Distribution bars 10Ø@150mm c/c 108 3861.5 417042 257433.333 kg
Total volume of reinforcement 2314779.15 kg 134.68 311,754,456.01
9 Manhole
Iron plate for covering the manhole 25 25 no. 11,466.24 286,656.00
10 ladder 175 0.19 10 mm dia 0.617 20.515 kg 134.68 2,762.99
Total 753,793,145.59

-
SIDE DRAIN QUANTITY CALCULATIO

For Drain Works


PCC M15 PCC M20 Stone Soling
Drain Bed Formwork Caping Layer on Drain Top Drain Bed
Length
Breadth Height Breadth Height Breadth Height
Volume Area Volume Volume
(m) (m) (m) (m) (m) (m)
758.32 0.92 0.08 52.32 2,428.46 0.92 0.20 139.53 0.92 0.10 69.77
1890.98 0.92 0.08 130.48 9,644.92 0.92 0.200 347.94 0.920 0.10 173.97
Summary of Quantity for Drain( Rectangular - type)
SN Description Quantity Unit Remarks
1 M15 PCC 182.80 m3
2 1:4 C/S Masonry Wall - m3
3 Stone Soling work 243.74 m3
4 Cover - m3
5 Formwork (m2) 12,073.38 m2
E/W excavation in
6 1,706.15 m3
Foundation
7 M20 PCC 1,503.27 m3
NTITY CALCULATIONS

PCC M20 E/W Excavation in Foundation


Cover Reinforcement
Breadth Height Breadth Height (volume) (kg)
Volume Volume
(m) (m) (m) (m)
0.15 0.60 136.50 0.92 0.70 488.36 708042.290
0.15 1.55 879.31 0.920 0.70 1,217.79
.

708042.290

0.850
Length 758.320 m
Width 7.980 m

longitudinal 758.220
Spacing 200.000 mm
No. of rod 40
Transverse direction 7.880
No. of rod 3791
dia of bar 10.000 mm 0.010
total length (long) 3032.880 m
Total Length (traverse) 39.400 m
Total Length 3072.280 m
Volume of road 0.241 m3
unit weight 7850.000 kg/m3
wt of rod 1893.216
Length Breadth Height
S.N Items Number Quantity Unit Remarks
(m) (m) (m)
1 Earthwork in excavation
Along the drainage alignmnet 1 758.32 0.92 0.7 43268.49 m3

Total 43268.5 m3
3 Stone Solling
Foundation 1 758.32 0.92 0.1 69.76544 m3
Total 69.76544 m3
5 M20 Concreting
5.1 Bed part 1 758.32 0.92 0.15 104.64816 m3
5.2 Top part cover 1 758.32 0.92 0.2 139.53088 m3
5.3 Wall side 2 758.32 0.15 0.45 102.3732 m3
Total 346.55224 m3
7 Form work
7.1 Bed side
Long Side wall (Outer) 2 758.32 0.65 985.816 m2
Long Side wall (inner) 2 758.32 0.45 682.488 m2
top cover 2 758.32 0.2 303.328 m2
Total form work 1971.632 m2
8 Reinforcement
Top cover Slab Total Length
Top main bars 10Ø@150mm c/c 5054 0.82 4144.28 2558.19753 kg
Distribution bars 10Ø@150mm c/c 7 758.32 5308.24 3276.69136 kg
Base Distribution bars 10Ø@150mm c/c
Distribution bars 10Ø@150mm c/c 7 758.32 5308.24 3276.69136 kg
Side Wall
Outside and Inside Wall and bottom Total Length kg
main Vertical bars 10Ø@150mm c/c 5056 1.82 9201.92 5680.19753 kg
Base Distribution bars 10Ø@150mm c/c 8 758.32 6066.56 3744.79012 kg

Total volume of reinforcement 18536.5679 kg


Length Breadth Height
S.N Items Number Quantity Unit Remarks
(m) (m) (m)
1 Earthwork in excavation
Along the drainage alignmnet 1 1890.98 0.92 1.65 43268.49 m3

Total 43268.5 m3
3 Stone Solling
Foundation 1 1890.98 0.92 0.1 173.97016 m3
Total 173.97016 m3
5 M20 Concreting
5.1 Bed part 1 1890.98 0.92 0.15 260.95524 m3
5.2 Top part cover 1 1890.98 0.92 0.2 347.94032 m3
5.3 Wall side 2 1890.98 0.15 1.4 794.2116 m3
Total 1403.10716 m3
7 Form work
7.1 Bed side
Long Side wall (Outer) 2 1890.98 1.6 6051.136 m2
Long Side wall (inner) 2 1890.98 1.4 5294.744 m2
top cover 2 1890.98 0.2 756.392 m2
Total form work 12102.272 m2
8 Reinforcement
Top cover Slab Total Length
Top main bars 10Ø@150mm c/c 12606 0.82 10336.92 6380.81481 kg
Distribution bars 10Ø@150mm c/c 7 1890.98 13236.86 8170.90123 kg
Base Distribution bars 10Ø@150mm c/c
Distribution bars 10Ø@150mm c/c 7 1890.98 13236.86 8170.90123 kg
Side Wall
Outside and Inside Wall and bottom Total Length kg
main Vertical bars 10Ø@150mm c/c 12607 3.72 46898.04 28949.4074 kg
Base Distribution bars 10Ø@150mm c/c 22 1890.98 41601.56 25679.9753 kg

Total volume of reinforcement 77352 kg