The document provides a detailed panelboard schedule for the second floor of the Administration Building, listing various air conditioning circuits with their respective loads and cable specifications. It includes information on the total connected load, demand factors, and notes on required components such as MCCBs and RCDs. The overall total demand load is calculated at 31.296 KVA with a balanced load percentage of 9%.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
11 views
Electrical Load Calculation
The document provides a detailed panelboard schedule for the second floor of the Administration Building, listing various air conditioning circuits with their respective loads and cable specifications. It includes information on the total connected load, demand factors, and notes on required components such as MCCBs and RCDs. The overall total demand load is calculated at 31.296 KVA with a balanced load percentage of 9%.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1
DB / Panelboard Schedule
Voltage (V) 400 Main C.B Cable Panel Details
Location SECOND FLOOR Ratings (AT/AF) 25/100 Name/No. Form Installation WALL MOUNTED Panel Name PP S.C Rating (Ics) Size IP 42 Building Name ADMINSTRATION BUILDING Fed From Dimensions W,D,H (mm) 65*30*80 cm
Load Phase Load (VA)
Notes* Circuit No. Circuit Ref. Load Type Wire/Cable mm2 C.B Rating Designation R Y B 1 R1 AIR COND 1.9KW 3*6mm2 2375 2 Y1 AIR COND 1.9KW 3*6mm2 2375 3 B1 AIR COND 2.5KW 3*6mm2 3125 4 R2 AIR COND 1.9KW 3*6mm2 2375 5 Y2 AIR COND 1.9KW 3*6mm2 2375 6 B2 AIR COND 2.5KW 3*6mm2 3125 7 R3 AIR COND 1.9KW 3*6mm2 2375 8 Y3 AIR COND 1.915KW 3*6mm2 2393.75 9 B3 AIR COND 2.5KW 3*6mm2 3125 10 R4 AIR COND 2.5KW 3*6mm2 3125 11 Y4 AIR COND 1.915KW 3*6mm2 2393.75 12 B4 AIR COND 1.915KW 3*6mm2 2393.75 13 R5 AIR COND 2.5KW 3*6mm2 3125 14 Y5 AIR COND 2.5KW 3*6mm2 3125 15 B5 AIR COND 1.9KW 3*6mm2 2375 16 R6 AIR COND 2.5KW 3*6mm2 3125 17 Y6 AIR COND 2.5KW 3*6mm2 3125 18 B6 AIR COND 3KW 3*6mm2 3750 19 R7 AIR COND 2.5KW 3*6mm2 3125 20 Y7 AIR COND 2.5KW 3*6mm2 3125 21 B7 AIR COND 3KW 3*6mm2 3750 22 R8 AIR COND 2.5KW 3*6mm2 3125 23 Y8 AIR COND 1.9KW 3*6mm2 2375 24 B8 AIR COND SPACE 3*6mm2 0 25 R9 AIR COND SPACE 3*6mm2 0 26 Y9 AIR COND 1.9KW 3*6mm2 2375 27 B9 SPACE 28 R10 SPACE 29 Y10 SPACE 30 B10 SPACE 31 R11 SPARE 32 11 SPARE 33 B11 SPARE 34 R12 SPARE 35 Y12 SPARE 36 B12 SPARE TOTAL CONNECTED LOAD (VA) 22750 23662.5 21643.75 *Notes: 5- LCP: Controlled By 1-Ph Contactor Via LCP Lighting Power Heating Air Condition Motor Total 1- MCCB's Rq. 6- RCD 100mA Rq. Connected KVA 0 27160 15000 0 0 42160 2- Push Botton 7- RCD 30mA Rq. Demand Factor 1 0.6 1 0.9 1 3- Indicating Lamps 8- RCD 30mA to 30 A Rq. Demand Load 0 16296 15000 0 0 31296 4- Earth Leakage C.B 9-Selector Switch M-O-A Total Demand Load (KVA) 31.296 KVA
Download (Ebook) Creole Societies in the Portuguese Colonial Empire by Philip J. Havik; Malyn Newitt ISBN 9781443884631, 1443884634 ebook All Chapters PDF