Application
Application
Sl No Particulars Details
4 Email ID [email protected]
3. Your application has been submitted to the Torrent Power Limited for approval of Technical Feasibility.
Do not start the installation of rooftop solar plant until the Feasibility Approval is received.
4. Self-Declaration:
I confirm that the details submitted by me in my Application on the National Portal is correct to the best
of my knowledge and in case any information submitted by me is found to be false or not in accordance
with the guidelines of PM - Surya Ghar: Muft Bijli Yojana at any stage of the entire process, the subsidy
under the PMSG scheme shall not be released to me.
Disclaimer:
This is only an acknowledgement of the application submitted on the National Portal based on the
details submitted by Applicant. The release of subsidy under PMSG Scheme will be subject to
successful installation, commissioning, inspection and redemption of subsidy request in National portal
for the roof top solar plant as per guidelines laid down by the Ministry of New and Renewable Energy,
Government of India.