REMOVE EXISTING OPTUS COM2a (E12F13P25) (3 OFF) AND EXISTING S1 ANTENNA STAND-OFF MOUNT TO BE ROTATED IN
COM1 (1 OFF) FROM EXISTING ANTENNA MOUNT/MAIN MAST ORDER TO ATTAIN A MINIMUM ANGULAR SEPARATION OF 40°
BETWEEN THE PROPOSED S1 ANTENNA AND EXISTING DISH
INSTALL NEW OPTUS ERICSSON RRU4490
(18/21) (1 OFF, FOR S4) ON NEW RRU
STAND-OFF MOUNT ON EXISTING MAIN Earthing cable from cable support to ground has
been damaged hence replacement is required
MAST
300 O
41-
°
40°
70°
-S4
70°
PASSIVE ANTENNA ON NEW ANTENNA MOUNT
4490
70°
6626
4490 - S1
6626 -S1
- S4
54°
21-O
90°
6626
4490
70°
REMOVE EXISTING AVA 7-50 (1/2") FEEDERS (4 OFF). REUSE EXISTING OPTUS H&S 9/18
6626
6mm2 HYBRID CABLE (1 OFF, SHARED FOR S1 & S4) (LENGTH: 125m FOR S1 & S4). INSTALL
NEW H&S 6/12 (10mm2) HYBRID CABLE (2 OFF) (1 OFF FOR S2 & 1 OFF FOR S3) (LENGTH:
4490
70°
INSTALL NEW OPTUS ERICSSON RRU6626 (7/9) (2 OFF SHARED 70°
120m FOR S2) (LENGTH: 130m FOR S3) TO RUN IN EXISTING 600mm WIDE CABLE LADDER.
BETWEEN SECTOR 1 & 4) AND RRU4490 (18/21) (1 OFF, FOR S1)
ON NEW RRU STAND-OFF MOUNT
31 0°
23
-O
Rev Date Revision Details Consultant CAD Designer Verifier Approver GRAINCORP SILO FOR CONSTRUCTION
AS BUILT S1961-G3 A
AB
COPYRIGHT © OPTUS MOBILE PTY LTD ABN 65 054 365 696. ALL RIGHTS RESERVED. VERSION 2.0 NOVEMBER 2013
COPYRIGHT © OPTUS MOBILE PTY LTD ABN 65 054 365 696. ALL RIGHTS RESERVED. VERSION 2.0 NOVEMBER 2013
Rev
A
16.01.25
Date
Revision Details
54.61m
ALL TELECOS
Consultant CAD Designer
GL
4490
6626
AUSTRALIA
FOR
AS BUILT
Drawing Status:
SITE ELEVATION
Drawing Title:
SUITE 01
SUITE 02
4. INSTALL NEW OPTUS 37RU BTS MER RACK (1 OFF) AT S00F02.
5. INSTALL NEW 2 x ERICSSON RP6651 FOR LNR7/LNR9,
L18/LNR21 AT LOCATION S00F02.
6. INSTALL NEW DCDU (1 OFF) TO POWER UP ERICSSON BBUs
AT LOCATION S00F02.
7. ALL EXTERNAL ALARMS (ENVIRONMENTAL ETC) TO BE
REFER TO NOTE
MIGRATED FROM UMTS BBU TO LTE/5G BBU, AS PER OPTUS
15 & 18
S02F01 STANDARDS, INCLUDING OM36991 RAN EQUIPMENT I&C
STANDARDS.
8. ALL 3G CONTROLLED RET'S TO BE MIGRATED TO 4G/5G AS
NEW REQUIRED, ACCORDING TO OPTUS STANDARDS, INCLUDING
VERTIV OM38040 MIMO PORT PLUMBING BTS RET CONTROL
Tx PSU-2
DEPLOYMENT.
REFER TO NOTE 9 9. REMOVE ANY ON-SITE CCU'S AND CONVERT CCU
& 10 CONTROLLED MHA'S TO BTS CONTROLLED.
REFER TO 3R + 5B 10. EXISTING KRONE PANEL TO BE UPGRADED TO RJ45 PATCH
S01F01
NOTE 16 & 17 PANEL. INSTALL 1 x 6610 FOR ALARM AT S01F01.
S02F02
iDCDP NOTES:
REUSE
11. REMOVE EXISTING 15-WAY iDCDP (1 OFF) FROM EXISTING
SKINNY MER RACK AT S00F01. INSTALLY NEW 18-WAY VERTIV
Tx MER PSU-1 DCDU (DC BOOSTER VISION) FOR ALL OPTUS RRUs IN NEW 37RU
EXISTING 2-OFF 39SU MER RACK AT S00F01. SWAP CBs ON PSU AND iDCDP AS PER
LENMIC L600P AIR 6R + 5B LATEST GUIDELINE.
RACK
CONDITIONING S01F02
HYBRID CABLE NOTES:
UNITS & 1-OFF
12. REMOVE EXISTING AVA 7-50 (1/2") FEEDERS (4 OFF). REUSE
L350 AC FAN EXISTING OPTUS H&S 9/18 6mm2 HYBRID CABLE (1 OFF, SHARED
(BELOW) REFER TO NOTE FOR S1 & S4) (LENGTH: 125m FOR S1 & S4). REALOCATE
13 & 14 EXISTING OPTUS H&S 9/18 HYBRID CABLE FMT (1 OFF) FROM
EXISTING SKINNY MER RACK AT S00F01 TO NEW 37RU MER
EXISTING KRONE RACK AT S00F01. INSTALL NEW H&S 6/12 (10mm2) HYBRID CABLE
REFER TO NOTE 10 (2 OFF) (1 OFF FOR S2 & 1 OFF FOR S3) (LENGTH: 120m FOR S2)
(LENGTH: 130m FOR S3) TO RUN IN EXISTING 600mm WIDE
CABLE LADDER.
NEW OPTUS
37RU MER
DC POWER UPGRADE:
RACK 18-WAY NEW OPTUS 13.REUSE EXISTING OPTUS 18kW ELTEK PSU-1 WITH 2kW
SUITE 00 DCDU (DC 37RU MER RECTIFIERS (6 OFF) AT S02F02 (ALL THE EXISTING Tx APDP
BOOSTER RACK FEED A AND PLC TO BE CONNECTED TO THE EXISTING ELTEK
VISION) & LNR7/LNR9, PSU).
RELOCATED L18/LNR21 14. REUSE EXISTING LFeLi-48100ZN BATTERIES (5 OFF) AT
FMT S02F02.
S00F01 S00F02 S00F03 S00F04 S00F05 15. REUSE EXISTING 1x 40A 3P CB FOR OPTUS ELTEK PSU ON
THE DISTRIBUTION BOARD.
16. REPLACE EXISTING INVENSYS PSU (1.2kW RECTIFIER 3 OFF)
REFER TO NOTES REFER TO NOTES REFER TO NOTE 1 WITH NEW VERTIV 27kW PSU-2 AND 3 OFF 3kW RECTIFIERS (Tx
3, 11 & 12 2, 4, 5 & 6 APDPs FEED B, DC BOOSTER AND BBU'S DCDU TO BE
CONNECTED TO THE NEW VERTIV PSU. )
17. REMOVE EXISTING YUASA UXF100-12FS BATTERY STRINGS
(2 OFF) AND EXISTING LFeLi-48100ZN BATTERY(1 OFF). INSTALL
NEW LFeLi-48100ZN BATTERIES (5 OFF) AT S02F01.
18. EXISTING 3x32A CBs TO BE UPGRADED TO 3x40A SINGLE
POLE CBs FOR VERTIV PSU ON THE DISTRIBUTION BOARD.
19. OPTUS POWER DESIGN TOOL V12.3 APPROVED.
AC POWER UPGRADE:
20. EXISTING OPTUS 63A 3-PHASE POWER SUPPLY IS
SUFFICIENT FOR PROPOSED UPGRADE.
Rev Date Revision Details Consultant CAD Designer Verifier Approver GRAINCORP SILO FOR CONSTRUCTION
AS BUILT S1961-F1 A
AB
COPYRIGHT © OPTUS MOBILE PTY LTD ABN 65 054 365 696. ALL RIGHTS RESERVED. VERSION 2.0 NOVEMBER 2013