0% found this document useful (0 votes)
85 views4 pages

S1961 - Narrabri West - RLM - 25-02-25 - BDE

The document outlines the replacement and installation of various telecommunications equipment, including antennas and hybrid cables, at the Narrabri West site. It specifies the removal of existing equipment and the installation of new Ericsson components, along with necessary structural modifications to the shelter. Additionally, it highlights the need for maintenance and cleaning of existing equipment due to dust and debris accumulation.

Uploaded by

Vinay Rao
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
85 views4 pages

S1961 - Narrabri West - RLM - 25-02-25 - BDE

The document outlines the replacement and installation of various telecommunications equipment, including antennas and hybrid cables, at the Narrabri West site. It specifies the removal of existing equipment and the installation of new Ericsson components, along with necessary structural modifications to the shelter. Additionally, it highlights the need for maintenance and cleaning of existing equipment due to dust and debris accumulation.

Uploaded by

Vinay Rao
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

REPLACE EXISTING OPTUS GPS ANTENNA

WITH NEW ERICSSON GNSS GPS ANTENNA (1


MOCN RSD 3 NOTE: OFF) ON THE TOP OF SHELTER WALL
OPTUS ANTENNA AZIMUTH: ANGULAR BEAM SEPARATION EXEMPTION
SECTOR 1: 25° IS REQUIRED FOR SECTOR 1 & 2 PASSIVE
SECTOR 2: 90° ANTENNAS WITH EXISTING DISH
SECTOR 3: 230° S1 - 40°
SECTOR 4: 300° S2 - 54° EXISTING OPTUS PHASE 7.5 PREFABRICATED EQUIPMENT
SHELTER ON RAISED CONCRETE PIERS WITH ACCESS
STAIRS AND LANDING (3.0m x 2.5m) TO BE RECONFIGURED
REPLACE EXISTING OPTUS 12P ARGUS R2V4PX310R TO ACCOMODATE PROPOSED EQUIPMENTS. REFER TO
ANTENNAS (4 OFF) WITH NEW OPTUS 12P ERICSSON DRG. S1961-F1 FOR DETAILS
4207 2L 4M 2.6m (KRE 101 2568/1) ANTENNAS (1 OFF
PER SECTOR) (FOR SECTOR 11-O, 21-O, 31-O & 41-O)
ON NEW ANTENNA MOUNT ON EXISTING MAIN MAST

REMOVE EXISTING OPTUS HUAWEI RRU5301 (L7) (1 OFF PER


SECTOR, TOTAL 4 OFF), RRU3936 (UL9) (2 OFF, FOR S1 &
S2), RRU5501 (L18/L21) (2 OFF, S1 & S2) FROM EXISTING
ANTENNA MOUNT/MAIN MAST

REMOVE EXISTING OPTUS COM2a (E12F13P25) (3 OFF) AND EXISTING S1 ANTENNA STAND-OFF MOUNT TO BE ROTATED IN
COM1 (1 OFF) FROM EXISTING ANTENNA MOUNT/MAIN MAST ORDER TO ATTAIN A MINIMUM ANGULAR SEPARATION OF 40°
BETWEEN THE PROPOSED S1 ANTENNA AND EXISTING DISH
INSTALL NEW OPTUS ERICSSON RRU4490
(18/21) (1 OFF, FOR S4) ON NEW RRU
STAND-OFF MOUNT ON EXISTING MAIN Earthing cable from cable support to ground has
been damaged hence replacement is required
MAST

INSTALL NEW OPTUS 850REJ FILTER (E14V00P79) (1 11-


O
OFF PER SECTOR, 4 OFF TOTAL) BEHIND NEW OPTUS 25°

300 O
41-
°
40°
70°

-S4
70°
PASSIVE ANTENNA ON NEW ANTENNA MOUNT

4490
70°
6626
4490 - S1
6626 -S1
- S4

54°

21-O
90°
6626
4490
70°

REMOVE EXISTING AVA 7-50 (1/2") FEEDERS (4 OFF). REUSE EXISTING OPTUS H&S 9/18
6626
6mm2 HYBRID CABLE (1 OFF, SHARED FOR S1 & S4) (LENGTH: 125m FOR S1 & S4). INSTALL
NEW H&S 6/12 (10mm2) HYBRID CABLE (2 OFF) (1 OFF FOR S2 & 1 OFF FOR S3) (LENGTH:
4490

70°
INSTALL NEW OPTUS ERICSSON RRU6626 (7/9) (2 OFF SHARED 70°
120m FOR S2) (LENGTH: 130m FOR S3) TO RUN IN EXISTING 600mm WIDE CABLE LADDER.
BETWEEN SECTOR 1 & 4) AND RRU4490 (18/21) (1 OFF, FOR S1)
ON NEW RRU STAND-OFF MOUNT
31 0°
23
-O

INSTALL NEW OPTUS ERICSSON RRU6626 (7/9) (1 OFF PER SECTOR, 2


OFF FOR S2 & S3) AND RRU4490 (18/21) (1 OFF PER SECTOR, 2 OFF
REPLACE EXISTING ⌀76CHS x 2.6m LENGTH FOR S2 & S3) ON NEW RRU STAND-OFF MOUNT CONNECTED TO
ANTENNA MOUNT (4 OFF) WITH NEW ⌀76CHS EXISTING MAIN MAST
x 2.8m LENGTH ANTENNA MOUNT (4 OFF)

REMOVE EXISTING OPTUS ARGUS CPX209D


(1 OFF) FROM EXISTING ANTENNA MOUNT
WELDED ON EXISTING MAIN MAST.

Be aware of shelter access, which has


some restrictions by surrounding water.

Client: Project: Drawing Title:


MOBILE NETWORK
A 16.01.25 ISSUED FOR CONSTRUCTION (5G UPGRADE (OO)) ALL TELECOS RN AJ GL JM
AUSTRALIA SITE LAYOUT AND SETOUT PLAN
SITE No:- S1961
TECHNOLOGY & INFRASTRUCTURE NARRABRI WEST Drawing Status: Drawing No. Revision

Rev Date Revision Details Consultant CAD Designer Verifier Approver GRAINCORP SILO FOR CONSTRUCTION
AS BUILT S1961-G3 A
AB
COPYRIGHT © OPTUS MOBILE PTY LTD ABN 65 054 365 696. ALL RIGHTS RESERVED. VERSION 2.0 NOVEMBER 2013
COPYRIGHT © OPTUS MOBILE PTY LTD ABN 65 054 365 696. ALL RIGHTS RESERVED. VERSION 2.0 NOVEMBER 2013
Rev

A
16.01.25
Date
Revision Details

ISSUED FOR CONSTRUCTION (5G UPGRADE (OO))

54.61m
ALL TELECOS
Consultant CAD Designer

CL NEW OPTUS ERICSSON RRU4490


(18/21) (1 OFF, FOR S1)
REPLACE EXISTING ⌀76CHS x 2.6m LENGTH
RN

ANTENNA MOUNT (4 OFF) WITH NEW ⌀76CHS


AJ

x 2.8m LENGTH ANTENNA MOUNT (4 OFF)


CL NEW OPTUS ERICSSON 4207 2L 4M
2.6m (KRE 101 2568/1) ANTENNAS (4 OFF)
Verifier

GL

4490

CL NEW OPTUS ERICSSON RRU4490 (18/21)


S1

6626

(3 OFF, FOR S2, S3 & S4)


4490
S1 S4
&S4

REMOVE EXISTING AVA 7-50 (1/2") FEEDERS (4 OFF).


Approver

CL NEW OPTUS ERICSSON RRU6626 (7/9) (4 OFF)


JM

REUSE EXISTING OPTUS H&S 9/18 6mm2 HYBRID CABLE


(1 OFF, SHARED FOR S1 & S4) (LENGTH: 125m FOR S1 &
S4) INSTALL NEW H&S 6/12 (10mm2) HYBRID CABLE (2
OFF) (1 OFF FOR S2 & 1 OFF FOR S3) (LENGTH: 120m
TECHNOLOGY & INFRASTRUCTURE

FOR S2) (LENGTH: 130m FOR S3) TO RUN IN EXISTING


600mm WIDE CABLE LADDER
Client:
Project:
MOBILE NETWORK
NARRABRI WEST
SITE No:- S1961
GRAINCORP SILO

AUSTRALIA
FOR
AS BUILT
Drawing Status:

SITE ELEVATION
Drawing Title:

REPLACE EXISTING OPTUS GPS ANTENNA


WITH NEW ERICSSON GNSS GPS ANTENNA (1
OFF) ON THE TOP OF SHELTER WALL
CONSTRUCTION

EXISTING OPTUS PHASE 7.5 PREFABRICATED


EQUIPMENT SHELTER ON RAISED CONCRETE
PIERS WITH ACCESS STAIRS AND LANDING
(3.0m x 2.5m) TO BE RECONFIGURED TO
ACCOMODATE PROPOSED EQUIPMENTS.
REFER TO DRG. S1961-F1 FOR DETAILS
S1961-G4
Drawing No.
AB
Revision
A
EXISTING 2.6m 76CHS
ANTENNA MOUNT TO TBE
REPLACED WITH NEW 2.8m
76CHS ANTENNA MOUNT

Client: Project: Drawing Title:


MOBILE NETWORK
AUSTRALIA ANTENNA MOUNTING DETAILS
VISIONSTREAM PTY LTD
25-37 Huntingdale Road
Burwood VIC 3125
SITE No:- S1961 SHEET 2 OF 4
Australia NARRABRI WEST Drawing Status: Drawing No. Revision
Tel- +61 3 9273 7600
Rev Date Revision Details Consultant CAD Designer Verifier Approver
www.visionstream.com.au GRAINCORP SILO AS BUILT S1961-S5 AB
WHS notes:
1.Existing meter box is full of dry dust and sand
hence cleaning is required.
2. AC duct is very dusty and filled with debris
SHELTER FLOOR, WALL & SOME OF THE OPTUS NOTES:
hence maintenance and service is required. 1. REMOVE EXISTING OPTUS HUAWEI BTS 3900L CABINET (2
INTERNAL Tx EQUIPMENT HAS TO BE
3. Most of the equipments in the shelter is CLEANED BECAUSE IT IS MORE DUST. OFF). DECOMMISSION ALL EXISTING OPTUS HUAWEI BBU'S AND
RFU'S FROM THE RACK AT S00F03 AND S00F04.
dusty and sand sediments are found hence it 2. REMOVE EXISTING NOKIA ULTRASITE BTS CABINET (1 OFF).
has to be cleaned. DECOMMISSION ALL EXISTING EQUIPMENTS AT S00F02.
3. REPLACE EXISTING SKINNY MER WITH NEW OPTUS 37RU BTS
MER RACK (1 OFF) AT S00F01.

SUITE 01

SUITE 02
4. INSTALL NEW OPTUS 37RU BTS MER RACK (1 OFF) AT S00F02.
5. INSTALL NEW 2 x ERICSSON RP6651 FOR LNR7/LNR9,
L18/LNR21 AT LOCATION S00F02.
6. INSTALL NEW DCDU (1 OFF) TO POWER UP ERICSSON BBUs
AT LOCATION S00F02.
7. ALL EXTERNAL ALARMS (ENVIRONMENTAL ETC) TO BE
REFER TO NOTE
MIGRATED FROM UMTS BBU TO LTE/5G BBU, AS PER OPTUS
15 & 18
S02F01 STANDARDS, INCLUDING OM36991 RAN EQUIPMENT I&C
STANDARDS.
8. ALL 3G CONTROLLED RET'S TO BE MIGRATED TO 4G/5G AS
NEW REQUIRED, ACCORDING TO OPTUS STANDARDS, INCLUDING
VERTIV OM38040 MIMO PORT PLUMBING BTS RET CONTROL
Tx PSU-2
DEPLOYMENT.
REFER TO NOTE 9 9. REMOVE ANY ON-SITE CCU'S AND CONVERT CCU
& 10 CONTROLLED MHA'S TO BTS CONTROLLED.
REFER TO 3R + 5B 10. EXISTING KRONE PANEL TO BE UPGRADED TO RJ45 PATCH
S01F01
NOTE 16 & 17 PANEL. INSTALL 1 x 6610 FOR ALARM AT S01F01.
S02F02

iDCDP NOTES:
REUSE
11. REMOVE EXISTING 15-WAY iDCDP (1 OFF) FROM EXISTING
SKINNY MER RACK AT S00F01. INSTALLY NEW 18-WAY VERTIV
Tx MER PSU-1 DCDU (DC BOOSTER VISION) FOR ALL OPTUS RRUs IN NEW 37RU
EXISTING 2-OFF 39SU MER RACK AT S00F01. SWAP CBs ON PSU AND iDCDP AS PER
LENMIC L600P AIR 6R + 5B LATEST GUIDELINE.
RACK
CONDITIONING S01F02
HYBRID CABLE NOTES:
UNITS & 1-OFF
12. REMOVE EXISTING AVA 7-50 (1/2") FEEDERS (4 OFF). REUSE
L350 AC FAN EXISTING OPTUS H&S 9/18 6mm2 HYBRID CABLE (1 OFF, SHARED
(BELOW) REFER TO NOTE FOR S1 & S4) (LENGTH: 125m FOR S1 & S4). REALOCATE
13 & 14 EXISTING OPTUS H&S 9/18 HYBRID CABLE FMT (1 OFF) FROM
EXISTING SKINNY MER RACK AT S00F01 TO NEW 37RU MER
EXISTING KRONE RACK AT S00F01. INSTALL NEW H&S 6/12 (10mm2) HYBRID CABLE
REFER TO NOTE 10 (2 OFF) (1 OFF FOR S2 & 1 OFF FOR S3) (LENGTH: 120m FOR S2)
(LENGTH: 130m FOR S3) TO RUN IN EXISTING 600mm WIDE
CABLE LADDER.
NEW OPTUS
37RU MER
DC POWER UPGRADE:
RACK 18-WAY NEW OPTUS 13.REUSE EXISTING OPTUS 18kW ELTEK PSU-1 WITH 2kW
SUITE 00 DCDU (DC 37RU MER RECTIFIERS (6 OFF) AT S02F02 (ALL THE EXISTING Tx APDP
BOOSTER RACK FEED A AND PLC TO BE CONNECTED TO THE EXISTING ELTEK
VISION) & LNR7/LNR9, PSU).
RELOCATED L18/LNR21 14. REUSE EXISTING LFeLi-48100ZN BATTERIES (5 OFF) AT
FMT S02F02.
S00F01 S00F02 S00F03 S00F04 S00F05 15. REUSE EXISTING 1x 40A 3P CB FOR OPTUS ELTEK PSU ON
THE DISTRIBUTION BOARD.
16. REPLACE EXISTING INVENSYS PSU (1.2kW RECTIFIER 3 OFF)
REFER TO NOTES REFER TO NOTES REFER TO NOTE 1 WITH NEW VERTIV 27kW PSU-2 AND 3 OFF 3kW RECTIFIERS (Tx
3, 11 & 12 2, 4, 5 & 6 APDPs FEED B, DC BOOSTER AND BBU'S DCDU TO BE
CONNECTED TO THE NEW VERTIV PSU. )
17. REMOVE EXISTING YUASA UXF100-12FS BATTERY STRINGS
(2 OFF) AND EXISTING LFeLi-48100ZN BATTERY(1 OFF). INSTALL
NEW LFeLi-48100ZN BATTERIES (5 OFF) AT S02F01.
18. EXISTING 3x32A CBs TO BE UPGRADED TO 3x40A SINGLE
POLE CBs FOR VERTIV PSU ON THE DISTRIBUTION BOARD.
19. OPTUS POWER DESIGN TOOL V12.3 APPROVED.

AC POWER UPGRADE:
20. EXISTING OPTUS 63A 3-PHASE POWER SUPPLY IS
SUFFICIENT FOR PROPOSED UPGRADE.

Client: Project: Drawing Title:


MOBILE NETWORK
A 16.01.25 ISSUED FOR CONSTRUCTION (5G UPGRADE (OO)) ALL TELECOS RN AJ GL JM
AUSTRALIA EQUIPMENT SHELTER
SITE No:- S1961 LAYOUT PLAN
TECHNOLOGY & INFRASTRUCTURE NARRABRI WEST Drawing Status: Drawing No. Revision

Rev Date Revision Details Consultant CAD Designer Verifier Approver GRAINCORP SILO FOR CONSTRUCTION
AS BUILT S1961-F1 A
AB
COPYRIGHT © OPTUS MOBILE PTY LTD ABN 65 054 365 696. ALL RIGHTS RESERVED. VERSION 2.0 NOVEMBER 2013