QSP-11_Procedure for Process Engineering.
QSP-11_Procedure for Process Engineering.
QSP-11
TURTLE DIAGRAM
Issue no/ Date 01/01-08-17
Rev. no/Date 01/25-01-19
Title: Process Engineering
OMNI AUTO LTD. Page 1 OF 1
Desired Output
Defined Input -Specifications and drawings;
- Special characteristics for product and
- APQP timing chart manufacturing process;
- Drawing of products / parts -Identification of process input variables
- Special product characteristics that impact characteristics;
- Targets for cost - Tooling and equipment for including
- Forecasted annual production capability studies Manufacturing process
- Process capability study report flow charts/ layout
-Targets for productivity -Capacity analysis;
-New materials - Manufacturing process FMEA;
-Product handling and ergonomics Process Engineering -Maintenance plans and instructions;
req. -PPAP,CP,WI,SOP
-DFM & DFA -Data for quality, reliability, maintainability,
- Experience from previous dev. and measurability; Result of error
- Mfg tech alternatives proofing, identification and verification, as
-Customer specific req. appropriate;
- Error proofing -Methods of rapid detections, feedback
and correction of product / manufacturing
process
nonconformities.
-Verification of error proofing devices
Interacting Process
How? Intended Result (Process
(Method/Technique/Procedure) Production, PurchaseJSR &SC , QA ,
Maint. Measures / Functional or
- As per process engineering Department Objectives)
procedure QSP-11
Effectiveness
Adherence to development
timeline.
Non-Conformity, Efficiency:
Corrective&Preventive Action Nil
- CAPA on related issues, PFMEA Improvement :
, CP & PFC review Review - CI projects
MRM
Risk Associated with the Process: Risk Associated with the Process is identified and monitored in MR/F/04
Format No MR/F/07
Prepared by Approved by
THIS DOCUMENT CONTAINS CONFIDENTIAL INFORMATION. Its use is restricted to employees with a need to know and third parties with a
need to know and who have signed a non-disclosure agreement.
Spicer India Pvt. Ltd, Doc. No. QSP-34
QUALITY SYSTEM PROCEDURE
Issue no./ Date 01/ 05-July-2017
Rev. no./ Date 02/ 05-July-2017
Title: Business Development
People finding a better way Page 1 of 2
Who ?
Process owner: Business Development Manager
With What How ? How Often / Does What Output Improvement
Process:
Receipt of enquiry. Output:
Feasibility review of enquiry. Frequency: Filled RFQ.
Inputs: Techno-commercial proposal. As and when Feasibility Review
Enquiry from customer. Contract review. enquiry is received Techno-commercial proposal.
RFQ PO clearance. from customer. PO
TSS
CSR
Resources: Procedure: Process Measures:
Computer system Linkages: As per procedure, Effectiveness :
All the processes defined QSP-34 Strike ratio
under IATF 16949-2016 and
EMS & OHSAS
Skills:
Knowledge on the Customer-
specific requirements
Good communication skills
Negotiation skills
Continual Improvement:
Remedial Review
Prepared By Approved By -- sd --
Business
COO
Format No F-MR-44 Designation Dev. Mgr. Designation
Doc. No. QSP-11
QUALITY SYSTEM PROCEDURE
Issue no/ Date 01/01-08-17
Rev. no/Date 01/25-03-22
Title: Process Engineering
OMNI AUTO LTD. Page 2 of 2
2.0 Scope This procedure covers development of all new products in Omni auto and Sricity plant.
3.0 Mapping
Forecasted annual production, Feasibility study & Risk assessment for Feasibility study After receiving all the
3 targets for cost. Production Volume, targets, Cost & checksheet
MD/Head Engg. JSR
requirements
Feasibility study Report
Development lead time
Development of new parts required for Sending requirements Developed parts as per list of
10 Drawings, BOM production & Procurement of outsourced parts to Purchase
Head Engg. JSR / CFT As per APQP timeline chart
materials
CP ,PFC & PFMEA,T / M / G Preparation of Process Sheet, Work Process Sheet, Work Instruction,
Instruction, Machine Check Sheet, Dimension CFT Review Machine Check Sheet, Dimension
11 drawings, layouts , equipments
Check Sheet.
Head Engg. JSR / CFT As per APQP timeline chart
Check Sheet
notes.
Doc. No. QSP-11
QUALITY SYSTEM PROCEDURE
Issue no/ Date 01/01-08-17
Rev. no/Date 01/25-03-22
Title: Process Engineering
OMNI AUTO LTD. Page 2 of 2
Drawing , CP , Customer Planning for MSA & SPC,Customer specific CFT Review
12 requirements, Spl./Critial Requirement (if req. by customer) Head Engg. JSR / CFT As per APQP timeline chart MSA , SPC study records
Characteristics
Customer
Proto Type Event (If required) By using tool room &
13 requirements ,drawings , Proto
Mfg. facilities
Head Engg. JSR / CFT If required by customer Proto type sample
CP , PFC
Review of
Drawings , Customer requirements of After Proto sample
14 requirements Packing Standard finalization customer or as per ou
Head Engg. JSR / CFT
completion
Packing standard
standard
Customer
requirements ,drawings , PFC , Conducting of Pre-dispatch meeting up to CFT Review After completion of master
16 PFMEA, CP, Quality Inspection Quality Sign Off by QA Head Engg. JSR / CFT
sample
Quality signoff documents
reports
Error Proofing
List of Error proofing , Challenge Periodically Testing and verification of error Verification and CFT
2 parts proofing devices using Challenge parts Testing
As per decided frequency Verification Report
Address details of error proofing in PFMEA Control Plan with reaction plan ,
and Control plan , Address reaction plan for Updation of PFMEA & CFT
4 FMEA , CONTROL PLAN
failure and identify temporary change control Control plan
As and When PFMEA , temporay change control
method if failure occurs matrix.
Record Ref:
IATF Clause No.: Document Ref : Enquiry register QAL/ENQ/01/00 , Manufacturing feasibility analysis ENGG/F/02 , APQP
8.3.2,8.3.3,8.3.3.2,8.3.3.3,8.3.4,8.3.4.1 sheet ENGG/F/01,Project goal sheet ENGG/F/03,
,8.3.4.2,8.3.4.4,8.3.5,8.3.5.2, 10.2.4
Prepared by Approved by