0% found this document useful (0 votes)
15 views1 page

SWM1020-SW-PRO-PID-0001-02

The document outlines specifications and notes for a reclaimed oil pump system, including design parameters such as rated capacity, differential head, and operating conditions. It details installation requirements, safety measures, and connections for monitoring and maintenance. Additionally, it includes project notes regarding the reuse of components and the need for integrity testing of piping systems.

Uploaded by

bharuk
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
15 views1 page

SWM1020-SW-PRO-PID-0001-02

The document outlines specifications and notes for a reclaimed oil pump system, including design parameters such as rated capacity, differential head, and operating conditions. It details installation requirements, safety measures, and connections for monitoring and maintenance. Additionally, it includes project notes regarding the reuse of components and the need for integrity testing of piping systems.

Uploaded by

bharuk
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

A B C D E F G H J K L M N P

SPECIFIC NOTES
P-6001
T-6001 NOTE P4
RECLAIMED OIL PUMP 1. MINIMUM SLOPE 1:100, NO POCKETS.
HAZARDOUS OPEN DRAINS TANK
RATED CAPACITY - 5.0 m3/hr 2. VENT TO AREA SAFE FOR PERSONNEL
NOTE P8 NOTE P8 NOTE P8 AND EQUIPMENT.
RATED DIFFERENTIAL HEAD - 7.0m
SIZE - 2900 mm (L) x 2083 mm (W) x1350 mm (H)
1 INSTALLED POWER - N/A 3. SAMPLE CONNECTION FOR MONITORING OVERBOARD 1
DESIGN PRESSURE - ATMOS
TRIM NO. - WATER PURITY.
DESIGN TEMPERATURE - -6/70 deg C NOTE P8
OPERATING PRESSURE - ATMOS 4. HATCH M2 FOR PLATE PACK WITHDRAWAL.
OPERATING TEMPERATURE - AMBIENT
5. TOP OF HAZARDOUS OPEN DRAINS TANK
TRIM NO. - VT-60901-L11430X HAS REMOVABLE GAS TIGHT HATCHES.

6. ALL CONNECTIONS TO THE OPEN DRAINS PIPEWORK


FROM TUNDISHES AND DRIP PANS TO BE PROVIDED
WITH LOOP SEAL WITH MINIMUM DEPTH OF 150mm.

7. ADJUSTABLE WEIR.

8. HATCH FOR ACCESS TO ADJUSTABLE WEIR.

9. PUMP P-6001 IS COMMON TO HAZARDOUS AND


NON-HAZARDOUS DRAINS TANKS.

10. DEPENDING ON LAYOUT, VALVES MAY NEED EXTENDED


SPINDLES TO FACILITATE OPERATION.

11. DELETED.

12. DELETED.
2 2
13. PRESSURE TEST EQUIPMENT FOR INTEGRITY TESTING OF
DIP PIPES COMMON TO BOTH DRAINS TANKS. SAMPLE
CONNECTION TEST POINT USED FOR INTEGRITY TESTING.

8"-VA-60601-SW11490Y
14. PIPING ARRANGEMENT TO ENSURE THAT FLOWMETER AND
NOTE 2 & 17 SAMPLE CONNECTION ARE NORMALLY FLOODED.

NOTE P1
15. FLOWMETER TO HAVE MINIMUM 5 D STRAIGHT LENGTH

8"-VA-60602-SW11490Y
UPSTREAM AND 2 D DOWNSTREAM.

VDH60256-06
16. FOR DETAILS OF SAMPLE CONNECTIONS SEE PEFS PIPING
NOTE 2 & 17 & INSTRUMENT LEGEND DRG No. SW/B/21400-004.

3/4"
NOTE P1 NOTE P2
NOTE P2 17. MAXIMUM VERTICAL VENT HEIGHT LESS THAN 1m.
NOTE P1 NOTE P2
2" 2"
2"-DH-60035-L11430X 18. REFER TO T-6001 GA FOR ACTUAL LOCATION OF OIL
FROM JACKET
COMPARTMENT.
VDH60035-01

VDH60035-02

DECK AREA
VVA60601-01
NOTE 19
NOTES 5 & 8 19. 1.1/2" SWAGELOK CONNECTOR FOR TRANSFER OF DRAINS
NOTE 5 NOTES 4 & 5
FROM OIPW PACKAGES USING TEMPORARY PUMP/HOSE.
SP M1 M2 M3
3 NOTE P4
3
76
3"-DH-60256-L31500X-E PROJECT NOTES:
667 8" 8"
3" P1. ALL DESTRUCTED PIPEWORK AND PIPING COMPONENTS
3" (E.G. SPECTACLE BLINDS) TO BE RETAINED FOR RE-USE IN THE
N5 N9 K1A

VDH60256-07
T-6001

VDH60256-19
OIL AIR FROM PLANT CONSTRUCT SCOPE.
VDH60256-24

3/4"
AIR DISTRIBUTION P2. ALL DESTRUCTED VALVES TO BE RETAINED FOR RE-USE IN THE
WATER 1"-AP-70014-L11410X

3/4"
SW-B-21570-006 CONSTRUCT SCOPE.
TP 3/4"
P3. INSTRUMENT TO BE RETAINED FOR RE-USE IN THE CONSTRUCT
02 NOTE 7
2" SCOPE.
RETAIN DEST. VDH60256-10 J1 D1
P4. REPLACEMENT OF TANK T-6001 IS TO BE COMPLETED ON A LIKE
RECOVERED OIL FROM BDH60016-05
NOTE P7 VDH60256-21 FOR LIKE BASIS.
OPEN DRAIN CAISSON

VAP70014-02
V-6001 NOTE P2, P3 & P5 P5. VESSEL BRIDLE TO BE RETAINED FOR RE-USE IN THE CONSTRUCT
2"-DH-60016-L11430X FALL H (1020mm)
SB 2" SCOPE.
SW-B-21560-003 LIA LG

1"
NOTE P2, P3 & P5
NOTE 1 N2 P6. VESSEL TRIM ASSEMBLIES TO BE RETAINED FOR RE-USE IN THE
2" NOTE P1 OIL 60001 60002
VDH60016-06 CONSTRUCT SCOPE.
L (380mm)

VDH60256-18
2" P7. CONSTRUCT SCOPE SHOWN ON SWM1020-SW-PRO-PID-0003-01 TO BE
BDH60007-02
COMPLETED AT THE EARLIEST OPPORTUNITY FOLLOWING
HAZARDOUS OPEN SP
NOTE P1 NOTE P2
VDH60256-09 DISCONNECTION AT TP01, TP02 AND TP03.

VDH60256-08
DRAINS HEADER 10 4
4 FALL 6" SB VDH60256-20

3/4"
6"-DH-60007-L11430X 6" N1 049 P8. DRAWING CORRECTION BASED ON DATASHEET SW-M-33223-000 AND
NOTE P6
SW-B-21560-009
GENERAL ARRANGEMENT L0262-27-V011-001-002-001-001.

3/4"
VDH60009-01

NOTE 1 VVT60901-05 3/4"


NO WATER
P9. ALL FLOW TO THE HAZARDOUS OPEN DRAIN SYSTEM SHALL BE
6" CSC

3" 1/2"
NOTE P2 VDH60007-01 3" 1"
AM TEMPORARILY STOPPED UNTIL THE SECTIONS OF 6"-DH-60007-L11430X
N3 NOTE 9

VAP70014-10
NOTES AND 8"-DH-60008-L11430X HAVE BEEN REMOVED AND A TEMPORARY
P7 & P9 NC
HOSE FITTED BETWEEN TP01 AND TP03 (REFER TO

1/2"
RETAIN DEST. VVT60901-14 SWM1020-SW-PRO-PID-0003-01).
VVT60901-11 2"
TP 2" 2" 2"
N8 2" PURGE NOTE P6
NOTE 18 N10 CONNECTION J1 D1 HOLDS:
01 PURGE 2" VVT60901-10
CONNECTION VVT60901-13
1. DELETED.
NOTE P6 OIL 1" 1"
3" 1"-DH-60598-L11430X 2. DELETED.
COMPARTMENT 3"
N6 K1B 3. DELETED.
D1 4. DELETED.
N11 N4 N12 N7 N13 VDH60256-23
EL. 22.55m U/S OF TANK

VDH60256-05
5. DELETED.
P-6001
BDH60012-01

VDH60012-02

BDH60010-02

VVT60901-12
SP
VDH60275-01

SB
6. DELETED.
BDH60275-02

3" 3" 2"

VDH60011-02
3" 6" 2"

BDH60011-01
NOTE 9

VVT60901-19
VDH60010-01
09

3/4"
J1
022

2"

2"
NOTE 10 CSC

CSC

NOTE 10 CSC
SB

SB

SB
3"

3"

6"

3"
NO
NOTE P2
NOTE P2 NOTE P6
5 5
NOTE 10
3"-DH-60012-L11430X
6"-DH-60009-L11430X

6"-DH-60010-L11430X
SP
3"-DH-60275-L11430X

3"-DH-60011-L11430X
09
-023
NOTE P2 NOTE P2
NOTE P2 NOTE P6

NOTE P1 NOTE P1 NOTE P1


NOTE P1 NOTE P1

RECLAIMED
OIL TANK
NOTE 1

NOTE 1

NOTE 1
NOTE 1

NOTE 1
FALL
FALL

FALL

FALL

FALL

NOTES P2 & P3
PG
NOTE 3 & 16 PIPEWORK & INSTRUMENTATION INDICATED THUS
60001
TYPE 3

VLN60401-02
SP
6 QP PCV
6
09
60001 -026
IS TO BE REMOVED.
DB 60002

NITROGEN FROM
UTILITY STATION
1"-LN-60401-L11470X THIS PROJECT DRAWING HAS BEEN PRODUCED
NOTE P1
NOTE 13
FROM MASTER DRAWING SW-B-21560-001, REV 03
8"-DH-60008-L11430X SP AND IS TO BE USED FOR INFORMATION WITHIN
10
25 CLOUDED AREAS ONLY.
TYPE 3

NOTE P3 QP
NOTE P1
FOR TEMPORARY CONSTRUCT SCOPE
60002

8"-DH-60008-L11430X
FQI
TP NO
REFER TO DRAWING
NOTE 3,13,
NO 60001 INS
W 03 14 & 16 W SWM1020-SW-PRO-PID-0003-01
VDH60008-03

INS
DEST. RETAIN
3/4"

NOTE P2
NOTE P1 NOTE P7
7
FALL
TO OPEN DRAIN
7
FOR PERMANENT CONSTRUCT SCOPE
NOTE 1 CAISSON V-6001
NOTE NOTE P1
8"-DH-60008-L11430X REFER TO DRAWING
SW-B-21560-003
14 & 15 SWM1020-SW-PRO-PID-0001-01

ENGINEERED DATE CHECKED APPROVED SCALE


ATTENTION FC 25/11/22 SJJ SJJ NTS
C.P. No. : SWM1020
C.P. TITLE : T-6001&T-6002 HAZARDOUS & NON-HAZARDOUS DRAINS TANK REPLACEMENT
DRAWING TITLE
NOT FOR THIS IS A C.A.D. PRODUCED
UTILITY ENGINEERING FLOW SCHEME
DRAWING AND MUST NOT
CONSTRUCTION BE CHANGED MANUALLY. HAZARDOUS OPEN DRAINS TANK
SHELL EPC CONTRACT E.D.C.C.
8 A2 24/05/23 RE-ISSUED FOR COMMENT (DESTRUCT) 8
A1 25/11/22 PRK FC SJJ SJJ ISSUED FOR COMMENT
CW514382 . .
INSTALLATION SHEARWATER AREA
DRAWN ENG CHKD APPD CLIENT DRAWING No. REV. DRAWING No. SHEETS REV
REV DATE DESCRIPTION
BY BY BY BY DRAWING No. TITLE

REVISIONS REFERENCE DRAWINGS EMOC-121690-02-SW-B-21560-001 R02 SWM1020-SW-PRO-PID-0001-02 A2


A B C D E F G H J K L M N P

You might also like