Exchange Migration Project Documentation (Gasco)

The Exchange Migration Project successfully installed Exchange 2019 on new servers and configured essential components such as authentication certificates, virtual directories, and databases. All mailboxes were migrated, old databases and servers were removed, and the new servers were verified to be stable. The project concluded with the uninstallation of Exchange from the old servers.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2 views

Exchange Migration Project Documentation (Gasco)

The Exchange Migration Project successfully installed Exchange 2019 on new servers and configured essential components such as authentication certificates, virtual directories, and databases. All mailboxes were migrated, old databases and servers were removed, and the new servers were verified to be stable. The project concluded with the uninstallation of Exchange from the old servers.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Exchange Migration Project Documentation

➢ Installation

• Exchange Installation: We have Successfully installed Exchange 2019 with the latest CU and
SU on the new servers.

➢ Configuration and Testing

• Auth Certificate: We have Created a new Auth certificate, and the Queue Viewer is now
working successfully.

• Virtual Directories: We have Configured all virtual directories on the new servers.

• Certificate Import: We have Imported the public certificate into the new servers.

• DAG Creation: We have Created a new DAG and added the new servers as members.

• Outlook Connectivity: We have Tested Outlook connectivity on the client PC, which
connected successfully.

• Receive Connectors: We have Copied the receive connectors and their permissions to the
new servers.

• Database Creation: We have Created new databases on the new servers.

• IIS Configuration: Configured IIS restrictions for IIS and OWA on the new server to match the
old servers.

➢ Database and Server Migration

• Mailbox Migration: We have successfully migrated all the mailboxes to the new databases.

• Database Removal: We have Removed copies of the old databases and deleted the old
databases.

• DAG Removal: We have Removed the old servers from the old DAG and deleted the old
DAG.

• IP Configuration: We have Changed the IPs of the new servers to match the old Exchange
server IPs.
• Server Shutdown: Shut down the old servers until Exchange was uninstalled from them.

➢ Uninstallation and Health Check

• Uninstallation: We have Successfully uninstalled Exchange from the old servers.

• Health Check: Verified the health of the new servers; they are stable and functioning
smoothly.