0% found this document useful (0 votes)
3 views

24.08 Non Compliance Report (NCR)

The document is a Non-Compliance Report (NCR) receipt used to document instances of non-compliance in a project. It includes sections for describing the non-compliance, references to specifications and drawings, proposed remedial actions, and responses from consultants. The report also indicates whether the NCR is closed or requires further inspection and potential cost deductions.

Uploaded by

rashad26041996
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
3 views

24.08 Non Compliance Report (NCR)

The document is a Non-Compliance Report (NCR) receipt used to document instances of non-compliance in a project. It includes sections for describing the non-compliance, references to specifications and drawings, proposed remedial actions, and responses from consultants. The report also indicates whether the NCR is closed or requires further inspection and potential cost deductions.

Uploaded by

rashad26041996
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

NON-COMPLIANCE REPORT (NCR) RECEIPT

STAMP
Project Name :…………….

Ref.No.: NCR Date:

TO: FROM:

ATTN: DESIGNATION
SIGN:
C.C.

DESCRIPTION OF NON COMPLIANCE:

REFERENCE

SPECIFICATION REFERENCE:

DRAWING REFERENCE:

ANY OTHER CONTRACT


DOCUMENT REFERENCE:

PHOTOGRAPH ATTACHED: ANY OTHER DOCUMENT ATTACHED (PLEASE SPECIFY):


YES YES NO

NO

REMEDIAL ACTION PROPOSED BY CONTRACTOR:

RESPONSE TO REMEDIAL ACTION:


ACCEPTED ACCEPTED AS NOT ACCEPTED
COMMENTED
COMMENTS:

ACTION TAKEN - REINSPECTION REQUEST:

REQUESTED BY

NAME: DESIGNATION: SIGNATURE: DATE:

COMMENTS BY CONSULTANTS:

NCR CLOSED NCR WILL HAVE COST DEDUCTION


( If yes then Copy must be provided to QS )

NCR NOT CLOSED (RESUBMIT FOR INSPECTION)

NAME: DESIGNATION: SIGNATURE: DATE:

Note: Approval of the above Forms/Checklists do not relieve the Contractor from the Contractual Obligations.

You might also like