work progress report

The document outlines the progress of work related to the replacement and augmentation of CCTV cameras and associated equipment at Bikaner Railway Station, contracted to M/s SHEELTRON DIGITAL SYSTEMS PRIVATE LIMITED. It details various items supplied, installed, and their current execution status, indicating that several tasks are still in progress while others have been completed. The contract includes a warranty period of three years and a comprehensive AMC of five years post-warranty.

Uploaded by

srdsobkn24
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views3 pages

work progress report

The document outlines the progress of work related to the replacement and augmentation of CCTV cameras and associated equipment at Bikaner Railway Station, contracted to M/s SHEELTRON DIGITAL SYSTEMS PRIVATE LIMITED. It details various items supplied, installed, and their current execution status, indicating that several tasks are still in progress while others have been completed. The contract includes a warranty period of three years and a comprehensive AMC of five years post-warranty.

Uploaded by

srdsobkn24
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Work Progress (Materials Received and Execution)

Name of Work: - Replacement and Augmentation of CCTV Camera’s & other associate
equipments of ISS with warranty period of 03 years & comprehensive AMC of 05 years after
warranty at Bikaner Railway station over BKN Division

Name of Agency:- "M/s SHEELTRON DIGITAL SYSTEMS PRIVATE LIMITED –BENGALURU-


560020 KARNATKA,INDIA

Contract Agreement No. : S AND T/ S n T-BKN-ET-232/10626650059305 dated 01.08.2022

Sr. Sch. Description Qty. as Qty. Remark


No. Item per Executed
No. Schedule
B –Non sor items
1 NS-8 Supply,Installation , Testing & Work in progress
commissioning of professional large 10 Nos
10 Nos
format LED Video Display 55’ inch supplied
larger, fulll HD 1920X1080, TV
2 Supply of STP Cat-6 Cable 3050 Mtr Completed
NS-14 3050 Mtr
supplied
3 Supply of 6 Fibre Armoured optical 9000 Mtr Completed
NS-15 9000 Mtr
fibre cable supplied
4 Supply of single mode single fibre Completed
NS-17 20 nos 20 nos
10G SFP
5 Supply of 12 port FMS/LIU 05 nos Work in progress
NS-19 05 nos
supplied
6 Supply,Installation of professional 19’ 12 Nos and Work in progress
NS-20 Equipment Racks 9U 12 Nos 08 nos
installed
7 Supply,Installation of professional 19’ 01 Nos Work in progress
NS-30 01 Nos
Equipment Racks 36 U supplied
8 Supply of PVC Conduit pipe 25mm 1000 mtr Work in progress
NS-32 1000 Mtr
supplied
9 Supply of single mode single fibre 1G Completed
NS-37 80 nos 80 nos
SFP
10 Supply,Installation , Testing & Work in progress
48 nos
NS-41 commissioning of 6 port rack 48 Nos
supplied
mountable FMS/LIU OF 6 fibre
11 Supply of 24 port FMS/LIU 14 nos Work in progress
NS-42 14 nos
supplied
12 Supply of RJ-45 Patch cord cat-6,2 60 nos Completed
NS-45 60 Nos
mtr long supplied
13 Laying of OFC/STP/Power cable in Work in progress
NS-48 20000 Mtr 2400 mtr
conduit
14 Supply Installation ,testing & Work in progress
NS-5 commissioning of of server hardware 03 Nos 03 Nos
for face recognition…
15 Supply of single mode single fibre Work in progress
NS-17 20 Nos 20 Nos
10G SFP + module compatible
16 Supply Installation ,testing & Work in progress
Ns-19 05 Nos 05 Nos
commissioning of 12 Port FMS/LIU
17 NS-21 Supply of server Hardware for video 01 Nos 01 Nos Work in progress
Management and recording
18 Supply of server hardware for Work in progress
NS-23 02 Nos 02 Nos
Artificial intelligence video analytics
19 Work in progress
Supply , Installation ,Testing , Wiring
NS-26 & Commissioning of external storage 01 Nos 01 Nos
with( Hardware & Software )
minimum 240TB Row
20 Supply , erection , foundation , fixing Work in progress
& commissioning of Hot dip
NS-29 Galvanised octagonal pole 5 mtrs 46 Nos 46 Nos
Long confirming to IS:2629/BSEN
ISO:1416 Latest version
21 Supply of OFC Jointing kit 6 fiber Work in progress
NS-31 20 Nos 20 Nos
with splicing fiber
22 Supply of single mode single fiber 1G Work in progress
NS-37 SFP+ Module compatible with the 80 Nos 80 Nos
switched taken in the schedule
22 Supply ,Installation , Testing & Work in progress
NS-42 commissioning 24 Port Rack 14 Nos 14 Nos
Mountable FMS/LIU of 24 Fiber…
23 Supply of wireless transmitter and Work in progress
NS-47 02 Nos 2 Nos
receiver unit for video cemra
24 Cutting of platform surface Tile/slab) for a Work in progress
depth of 25cm and a width of 10cm and
NS-46 refilling/reconditioning /concreting/repairing the 1600 Mtr 700 Mtr
platform after laying HDPE pipe and cable.
Cutting should be done with arble cutt
25 NS-49 Laying of OFC/ STP/ power cables in conduit 20000 Mtr 3000 Mtr Work in progress
Item-2 Chapter -13
1 Supply of Handheld Digital Earth Completed
13011200 01 Nos 01 nos
clamp tester
Item-3 Chapter- 15
1 Supply of Pre-lubricated HDPE Duct Completed
08 km
15011100 40 mm, 33 ID as per RDSO 08 km
supplied
specification
2 Laying of Pre-lubricated HDPE Duct Work in progress
15011200 40 mm, 33 ID as per RDSO 08 km 03 km
specification
3 Supply,Installation of professional 03 Nos Work in progress
15011700 03 Nos
19’ Equipment Racks 12 U supplied
4 Supply of Fusion Splicing Machine 01 nos Completed
15013500 01 Nos
Model Fujikura FSM-605 Similer supplied
5 Supply of DLP trunk 80x50 mm 70 mtr Completed
15014500 70 mtr
supplied
6 Supply of DLP trunk 32x20 mm 70 mtr Completed
15014700 70 mtr
supplied
7 Supply of OFC Single mode 6 fibre 1000 mtr Completed
15016200 1000 Mtr
unarmoured cable supplied
8 Supply of power cable 3 core 2.5 sq 9000 mtr Completed
15019400 9000 Mtr
mm multi strand supplied
9 Supply, installation & commissioning Completed
of HDMI Cable with connectors for
15023000 Connectivity between Audio visual 50 Mtr 50 Mtr
system

AVINASH Digitally
by AVINASH
signed

SAHARA SAHARAN
Date: 2023.08.07
N 13:12:02 +05'30'