T2C SSPA - 22 Apr 24
T2C SSPA - 22 Apr 24
Date of Assessment
22 Apr 2024
(dd/mm/yyyy)
Period of Assessment
1st Apr 2024 to 30th April 2024
(dd/mm/yyyy – dd/mm/yyyy)
Prior to work
commencement,
daily assessment
3. Fit to Work
is conducted to all 2 2
Assessment
personnel to
ensure that they
are fit to work. TBM records on 15 April 2024 include health
declaration status of workers.
Number of sickness reported=0
Emergency
Response Plan
(ERP) including
ERT organisation
chart is updated, Emergency Response Plan Dated 30 Mar 24
submitted and with status” No Objection with comments”.
accepted by S.O.
team.
2 1
Emergency
response
procedures are
briefed to
emergency
response team Latest briefing on ERP to ERP Team dated
(ERT). was sighted dated 27 Mar 2024.
No briefing record was sighted for the latest
ERP version dated 30 Mar 2024.
Emergency
5.
Preparedness
and Response Emergency
response
provisions e.g.
first aid kit, pump, First aid Monthly Inspection Record sighted.
stretcher, tools
2 2
and equipment,
etc. mentioned in
ERP is checked at
least once a
month. Stretcher & AED is available at the First Aid
Room.
Ground
Deployment
Exercise (GDX)
schedule includes
scenarios
1 1
identified in ERP
and conducted
according to TTX & GDX was planned for April 24 & Dec
stipulated 24 with respective scenarios.
frequency.
Pest control
activities are
carried out as
ECO Inspection report for period 1 Apr24-15
planned.
6. Pest Control Apr24 sighted
2 2
Regime
Results of the
inspections are
documented and
followed-up.
Wildlife
7. Wildlife inspections are Eating facility maintenance checklist dated
2 2 21 Apr 24 was sighted.
Management carried out as
planned.
CAG.
Traffic inspections
are conducted as 2 2
per planned
Implementation
of plant &
Plant & equipment
10.
Equipment inspection regime 2 2
(P&E) Control to ensure that
they are fit for
use on-site.
Toolbox Meetings
are conducted by
supervisor before
the work
commences.
Safe Execution
1. 4 4
of Work Work executed
according to
accepted method
statement and
risk assessment
(MSRA).
Implementation
of permit-to-work
(PTW) for high-
risk work
4 4
activities and
approved PTW
are available on-
site. E-PTW was applied by site supervisor,
Permit-to- assessed by WSHC & approved by CM.
2. [For Works in
Work System
Airside]
Compliance with
airside work
permit (AWP) and
closure/NOTAM 3 3
approval and
requirements Valid AWP : AWP/2024/201 for work
including duration : 31/03/2024 to 31/05/2024 was
demarcation of sighted.
work zone.
Fire extinguishers
of appropriate
size provided at
locations such as
flammable
materials storage Fire extinguisher placed outside generator
areas, generator fencing.
3 3
and hot work
areas, etc.
Flammable
materials e.g.
diesel tank/drum,
gas cylinder, etc.
are kept away 3 3
from any heat
and ignition
sources and well- Flammable material was observed kept in
ventilated. chemical store away from ignition sources &
well ventilated.
4. Electrical Electrical tools 2 2
Safety and equipment
including
temporary
electrical
installations are
inspected by
licensed electrical
Generator & OG Box was inspected by LEW
worker (LEW)
on monthly basis with inspection sticker
monthly.
showing 1-April-24 & 19-April-24
respectively.
Electrical
distribution
boards are
maintained with
warning signs and 2 2
secured to
prevent Electrical distribution boards are installed
unauthorized with warning signs and secured to prevent
access. unauthorized access.
Rest areas /
shelters with
lightning arrester
provided in the
3 3
worksite for
workers to take
cover during their Rest area installed with certified lightning
Welfare protection system.
5. breaks.
Provisions
Provision of
drinking water
points accessible 3 3
at rest area and
toilets on-site. Drinking water points and portable toilets
are available on site & maintained.
6. Workforce Implementation 2 1
Identification of identification
to differentiate
between project
packages and
individual site
appointments
e.g. banksman,
traffic controllers,
Vest identification includes project packages.
lifting crew, etc.
But vest identification does not include
individual appointments such as banksman,
traffic controllers, lifting crew etc.
Construction
wastes are
disposed at
2 2
designated
locations and
cleared regularly.
[For Works in
Airside]
Storage of
materials, ground
conditions,
including parking
of construction
plants and
3 3
equipment
comply with AOS
requirements and
clear from out of
bound and/or
obstacle
limitation
surfaces (OLS)
[For Works in
Airside]
FOD check
conducted at the 3 3
end of each work
shift for each
work zone.
Chemicals are
labelled and
stored at
designated
locations with
secondary
Chemicals are kept in store away from heat
containment
& ignition sources. The chemicals are
facility provided.
observed stored within secondary
The SDS is
containment(drip tray).
Chemical available on-site.
9. Storage and 4 3 Chemical container was observed not
Handling Spill kits are covered when not in use.
clearly labeled,
visible and
located in an
easily accessible
position. The
container free
from used
absorbent
materials.
Consumption of
Covered food bins provided for food waste
food at
disposal
designated eating
areas with
2 2
provision of
covered bins for
food waste
disposal.
Evacuation routes
exit points and
assembly areas
are clearly
demarcated with
signs.
..
Access routes for 3 3 Assembly area signage was sighted
emergency
vehicles and
paths for
emergency
evacuation are
free of
Emergency obstructions.
11. Preparedness
& Response
Directional signage to assembly area from
workplace was sighted.
Emergency
response
equipment e.g.
first aid boxes,
eye wash facility,
tools and
equipment for First aid boxes are available and inspected
3 2
emergency
response, etc.
provided and
stored in
locations where it
is readily
accessible.
Stretcher is available for emergency use
Appointed first
aiders available
during working
hours to maintain
the first aid 1 1
facilities and take
on the role of first
responder. Appointed first aiders are posted at site
office first aid room.
Plant &
equipment are
labelled with P&E
fit for use
inspection Scissors lift identified with Fit for Use
Plant & stickers / labels.
Equipment Inspection Stickers sighted. Inspection date
12. 4 3 1-Apr-2024
(P&E)
Implementation
Maintenance
of monthly color-
coding scheme
for lifting
equipment on-
site.
There is a lifting gear colour coding system
as per STEC WSHE system manual.
Prevention of worker
struck by moving parts
of machines or knocked
down by moving
machinery.
Vehicular access
ways, site
entrances, drop
off / pick up
points, Segregation of pedestrians & vehicular
designated traffic
parking areas are
demarcated on-
site.
b.
Disruption to aircraft operations* (100 marks per case) 0 0
f. Accident cases (with more than 3 days medical leave or hospitalised for at least
0 0
24hrs) (20 marks per case)
g. Accident cases (with 3 or less days medical leave; or light duties; or hospitalised
0 0
less than 24hrs) (3 marks per case)
h.
Property / Utility Damages (20 marks per case) 0 0
32+ 5
= 1.23 ≈ 1.0
30
(Max deduction cap at 20 marks)
l. Traffic violations reported in Site Management SITREP. (5 marks per case)
0 0
(Max deduction cap at 20 marks)
m. Security violations reported in Site Management SITREP. (5 marks per case)
0 0
(Max deduction cap at 20 marks)
Total Raw Marks to be Deducted (for Section C – Part 2) 1
Weighted Marks to be Deducted (for Section C – Part 2)
(Max deduction capped at 50 marks)
o.5≈1
Total Raw Marks ¿ be Deducted ¿ ×50
100
SCORE SHEET
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -