0% found this document useful (0 votes)
8 views1 page

Regarding Execution of Change of scope work of ROW protection with RCC drain and Paver Blocks

The document addresses the ongoing execution of a change of scope work for ROW protection involving RCC drains and paver blocks on a specific section of NH-752 H in Maharashtra. It highlights an issue regarding the use of FRP bars instead of the approved TMT Fe 500 steel bars in the construction, which may result in a cost deduction in the bill payment. The communication is directed to the Sr. Project Manager and includes references to previous correspondence related to the project.

Uploaded by

Sakshi Kale
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
8 views1 page

Regarding Execution of Change of scope work of ROW protection with RCC drain and Paver Blocks

The document addresses the ongoing execution of a change of scope work for ROW protection involving RCC drains and paver blocks on a specific section of NH-752 H in Maharashtra. It highlights an issue regarding the use of FRP bars instead of the approved TMT Fe 500 steel bars in the construction, which may result in a cost deduction in the bill payment. The communication is directed to the Sr. Project Manager and includes references to previous correspondence related to the project.

Uploaded by

Sakshi Kale
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

No/MSV/ CCPL /Chikhali/147 Date: 28/03/2025

To,
Sr. Project Manager
VPSC-CIPL-MAC-(JV),
(Jalana)
Name of Work: Rehabilitation & Up-gradation to 2 lanes with paved shoulder/ 4 lanning configuration
of Chikhli- Dabhadi-Talegaon-Pal Phata Section of NH-752 H from Km. 179/430 to Km. 141/800
[Design Chainage from Km. 8/850 to Km. 46/210 (Length. 37.360 km)] in the State of Maharashtra on
EPC Mode.

Sub: Regarding Execution of Change of scope work of ROW protection with RCC drain and Paver
Blocks
Ref: 1) Job no. NH752H- MAH-2021-22-033
2) Our Commencement Letter. No/NHD/Tender/01 Dated 20-11-2023
3) Your Letter No. VCM (JV)/Chikhali-Pal Phata/2024-25/390, Dated- 19/08/2024
4) CE & RO, Morth, Navi Mumbai’s Letter No. RO/MUM/P-033/2021-22/1714, Dated-14/02/2025
5) EE Letter No. NHD/C.S./TS-3/3000581, Dated-12/03/2025
6) Our office Letter No. MSV/CCPL/Chikhali/142, Dated- 19/03/2025

Sir,

With reference No. 6, the execution of “Change of scope work of ROW protection with RCC drain and
Paver Blocks” in the stretch of CH. 34 + 430 to CH. 34+900 on BHS is in progress. During our site visit
on 27.03.2025 in the said stretch we noticed, in the construction of two cells RCC drain use of FRP bars
is taken in Raft and Vertical Wall of the RCC drain.

As per approved COS, TMT Fe 500 steel bars in said construction is considered. So using of FRP bars in
the RCC work of drain instead of TMT Fe 500 steel bars, will lead to deduction for the cost difference of
these two materials in the Bill payment for the same.

With best compliments.

Resident Engineer ,
For MSV International INc.
In Association with
Cividesign Consultant Pvt. Ltd.

Copy To,
1) Executive Engineer NH (PWD) Chh. Sambhajinagar for information please.
2) Sub- Division Engineer, tq. Sillod, District, Chh. Sambhajinagar for information please.